Letting Schedule for January, 2013 (FY 2013)

Last Update: Thursday, November 14, 2013
January, 2013 (FY 2013) (see Links)
SEP 2012 | OCT 2012 | NOV 2012 | DEC 2012 | JAN 2013 | FEB 2013 | MAR 2013 | APR 2013 | MAY 2013 | JUN 2013 | JUL 2013 | AUG 2013
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
2975-01-008 Atascosa/
San Antonio
FM 2924 Actual $2,186,637 1 REHABILITATE AND WIDEN NARROW ROADWAY TO ADD SHOULDERS
0265-03-038 Bastrop/
Austin
SH 71 Actual $3,366,603 1 MILL, SEAL & INLAY MAINLANES
0807-01-024 Bastrop/
Austin
FM 535 Actual $1,167,863 6 REPLACE BRIDGE AND APPROACHES
0231-03-129 Bell/
Waco
US 190 Actual $21,952,775 3 CONSTRUCT OVERPASS AT PROPOSED ROSEWOOD DRIVE
0915-12-524 Bexar/
San Antonio
VA Actual $105,353 10 PURCHASE AND INSTALL WRONG WAY SIGNS AND DETECTION EQUIPMENT
0586-01-064 Brazoria/
Houston
SH 332 Actual $684,632 1 ACP OVERLAY
0913-19-024 Calhoun/
Yoakum
CR Actual $352,620 6 REPLACE BRIDGE AND APPROACHES
0913-19-025 Calhoun/
Yoakum
PW Actual $397,123 10 ROAD IMPROVEMENTS
0823-01-028 Cooke/
Wichita Falls
FM 373 Actual $1,701,551 1 SPOT FULL DEPTH REPAIR AND OVERLAY
0009-02-059 Dallas/
Dallas
SH 78 Actual $1,361,188 1 FDR, MILL, ACP OVERLAY AND PVMNT MARKINGS
0197-02-106 Dallas/
Dallas
US 175 Actual $2,490,573 1 FDR, ACP OVERLAY AND PAVEMENT MARKING
0918-00-230 Dallas/
Dallas
VA Actual $1,250,000 5 FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2013 FUNDING;
0168-07-042 Deaf Smith/
Amarillo
US 60 Actual $3,419,941 1 REHAB EXISTING RDWY WB LANES
0901-31-113 Delta/
Paris
CR Actual $296,611 6 REPLACE BRIDGE AND APPROACHES
2005-02-015 Ector/
Odessa
FM 1882 Actual $2,445,468 1 ROADWAY REHABILITATION
3571-01-006 Ector/
Odessa
SP 588 Actual $2,324,376 3 INSTALL TRAFFIC SIGNALS, MILLING, HMAC, STRIPING
0675-02-070 Freestone/
Bryan
IH 45 Actual $5,229,398 1 OVERLAY CONSISTING OF A CAM LEVEL - UP, PFC OVERLAY AND
0192-04-103 Galveston/
Houston
SH 6 Actual $2,714,894 1 BASE REPAIR, SEAL COAT AND 1.5" PFC ACP O / L
1911-01-020 Galveston/
Houston
FM 2004 Actual $2,133,995 1 ACP OVERLAY
0535-05-035 Gonzales/
Yoakum
IH 10 Actual $5,947,633 1 ACP SURFACING
0202-08-057 Grayson/
Paris
FM 1417 Actual $360,000 11 CONSTRUCT TURN LANES
0025-10-073 Guadalupe/
San Antonio
FM 78 Actual $4,136,147 1 RECONSTRUCT AND WIDEN EXISTING ROADWAY
0508-01-332 Harris/
Houston
IH 10 Actual $2,460,155 1 HIGH MAST ILLUMINATION
0912-00-418 Harris/
Houston
VA Actual $598,106 1 NEW SATELLITE BUILDING POWER SYSTEMS
0912-00-420 Harris/
Houston
VA Actual $1,899,904 1 NEW TRAFFIC SIGNALS
0912-00-456 Harris/
Houston
VA Actual $200,000 1 ITS COMMUNICATIONS (NON LETTING)
0014-23-029 Hill/
Waco
IH 35W Actual $2,811,815 6 REPLACE BRIDGE AND APPROACHES
0010-02-087 Hopkins/
Paris
IH 30 Actual $2,519,811 1 RESTORATION OF EXISTING ROAD
0335-02-028 Houston/
Lufkin
SH 7 Actual $6,088,436 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0005-10-016 Howard/
Abilene
BI 20-G Actual $5,646,936 10 REHABILITATION, ACP, SIDEWALKS
0901-22-087 Hunt/
Paris
CR Actual $348,298 6 REPLACE BRIDGE AND APPROACHES
0495-01-056 Kaufman/
Dallas
SP 557 Actual $3,520,884 3 CONSTRUCT ACCESS RAMPS
1091-01-015 Kaufman/
Dallas
FM 740 Actual $5,785,172 3 WIDEN 2 TO 4 LANES UNDIVIDED
0925-17-011 Knox/
Childress
CR Actual $272,237 6 REPLACEMENT OF EXISTING BRIDGE FACILITY
1545-02-019 La Salle/
Laredo
FM 468 Actual $5,094,226 1 MILL, WIDEN, OVERLAY , STRUCTURES, PAV MARKINGS AND SIGNS
2373-01-015 La Salle/
Laredo
FM 624 Actual $4,767,792 1 RESTORATION OF EXISTING ROADWAY
1007-03-019 Lavaca/
Yoakum
FM 532 Actual $79,102 3 LANDSCAPE PROJECT
2381-01-009 Liberty/
Beaumont
FM 2518 Actual $2,196,076 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0831-02-018 Limestone/
Waco
FM 342 Actual $863,381 6 REPLACE BRIDGE AND APPROACHES
0053-18-040 Lubbock/
Lubbock
US 84 Actual $1,521,813 11 RESTORATION OF EXISTING ROAD
0055-15-064 McLennan/
Waco
US 84 Actual $1,279,259 1 CONCRETE PAVEMENT REPAIR, DIAMOND GRIND AND PAVEMENT
0258-08-030 McLennan/
Waco
SH 6 Actual $525,888 1 CONSTRUCT LEFT TURN LANES AND SEAL COAT
3538-01-030 Montgomery/
Houston
SH 242 Actual $33,998,617 3 CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH
0176-01-097 Nacogdoches/
Lufkin
US 59 Actual $2,585,771 1 RESURFACE EXISTING PAVEMENT
0617-01-183 Nueces/
Corpus Christi
SH 358 Actual $4,738,752 1 NOVACHIP (FRTG LANES ONLY)
0081-02-066 Tarrant/
Fort Worth
US 377 Actual $105,000 3 INSTALLATION OF TRAFFIC - ACTUATED TRAFFIC SIGNAL
0902-48-846 Tarrant/
Fort Worth
VA Actual $2,200,000 7 MOBILITY ASST PATROL THAT PROVIDES ASST TO STRANDED MOTORIST
0908-00-078 Taylor/
Abilene
VA Actual $345,815 10 CURB RAMPS
0227-07-039 Terry/
Lubbock
US 62 Actual $10,645,069 11 MILL AND INLAY
0228-01-055 Terry/
Lubbock
US 62 Actual $875,983 11 RESTORATION OF EXISTING ROADWAY
0914-04-224 Travis/
Austin
VA Actual $1,983,974 3 DESIGN & CONST OF BIKE TRAIL
3136-01-179 Travis/
Austin
LP 1 Actual $1,466,461 1 REPAIR, LEVEL & THIN OVERLAY
0392-02-085 Upshur/
Atlanta
US 259 Actual $5,788,262 1 REHABILITATE 4 - LANE DIVIDED HIGHWAY
0922-11-039 Val Verde/
Laredo
VA Actual $381,503 11 INSTALL PREEMPTION SIGNALS, WIRELESS CCTV CAMERAS AND DMS
0913-27-052 Victoria/
Yoakum
CR Actual $348,225 6 REPLACE BRIDGE AND APPROACHES
0114-15-005 Washington/
Bryan
SS 125 Actual $2,452,789 8 SAFETY WORK CONSISTING OF SUBGRADE WIDENING, FLEXIBLE BASE,
0237-03-025 Webb/
Laredo
SH 44 Actual $4,993,409 1 MILLING, OVERLAY, GUARDRAIL, AND PAVEMENT MARKINGS
0151-03-039 Williamson/
Austin
SH 29 Actual $727,122 1 MILL, SEAL & OVERLAY
0683-01-079 Williamson/
Austin
RM 620 Actual $11,281,113 3 WIDEN TO 4 - LANE DIVIDED ROADWAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract