The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | CORYELL | Let Date: | 02/06/20 |
Type: | ASPHALTIC CONCRETE OVERLAY | Seq No: | 3011 |
Time: | 90 WORKING DAYS | Project ID: | STP 2020(565) |
Highway: | SH 36 | Contract #: | 02203011 |
Length: | 0.328 | CCSJ: | 0183-04-053 |
Limits: | |||
From: | HAY VALLEY RD | Check: | $62,000 |
To: | US 84 | Misc Cost: |
Estimate | $3,097,761.06 | % Over/Under | Company |
Bidder 1 | $2,987,724.20 | -3.55% | BIG CREEK CONSTRUCTION, LTD. |
Bidder 2 | $3,095,193.16 | -0.08% | KNIFE RIVER CORPORATION - SOUTH |
Bidder 3 | $3,188,713.12 | +2.94% | TEXAS MATERIALS GROUP, INC. |
Bidder 4 | $3,971,179.00 | +28.20% | LONE STAR PAVING COMPANY |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1046054 | REMOVING CONCRETE(MOW STRIP) | LF | 2,600.000 | 7.70 | 1 2 3 4 | 12.000 5.600 4.350 6.000 |
1626008 | ROLL SODDING | SY | 3,254.000 | 4.00 | 1 2 3 4 | 6.000 8.500 5.000 6.000 |
1686001 | VEGETATIVE WATERING | MG | 26.800 | 12.50 | 1 2 3 4 | 25.000 1.000 44.400 50.000 |
3516006 | FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") | SY | 20,000.000 | 45.00 | 1 2 3 4 | 35.000 44.850 44.150 50.000 |
3546041 | PLANE ASPH CONC PAV (1.5") | SY | 163,952.000 | 1.49 | 1 2 3 4 | 1.000 0.950 0.950 1.300 |
3546046 | PLANE ASPH CONC PAV (2 1/2"-3") | SY | 1,338.000 | 3.00 | 1 2 3 4 | 5.000 10.150 5.150 6.000 |
4296007 | CONC STR REPAIR (VERTICAL & OVERHEAD) | SF | 6.000 | 1,000.00 | 1 2 3 4 | 750.000 325.000 500.000 2,000.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 185.900 | 438.00 | 1 2 3 4 | 500.000 555.000 407.000 407.000 |
4386006 | CLEANING AND SEALING JOINTS (CL 3) | LF | 236.000 | 35.00 | 1 2 3 4 | 60.000 50.600 48.830 49.000 |
5006001 | MOBILIZATION | LS | 1.000 | 275,000.00 | 1 2 3 4 | 140,000.000 90,978.000 200,985.000 130,000.000 |
5026001007 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 5.000 | 5,000.00 | 1 2 3 4 | 2,500.000 2,355.000 705.000 35,500.000 |
5066038002 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 200.000 | 3.80 | 1 2 3 4 | 7.000 16.850 5.000 5.000 |
5066039002 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 200.000 | 0.75 | 1 2 3 4 | 0.500 8.000 1.000 1.000 |
5336001 | RUMBLE STRIPS (SHOULDER) | LF | 67,063.000 | 0.20 | 1 2 3 4 | 0.200 0.180 0.100 0.130 |
5336002 | RUMBLE STRIPS (CENTERLINE) | LF | 16,742.000 | 0.20 | 1 2 3 4 | 0.200 0.340 0.280 0.130 |
5406002001 | MTL W-BEAM GD FEN (STEEL POST) | LF | 2,597.000 | 25.50 | 1 2 3 4 | 27.000 22.280 21.250 21.250 |
5406006001 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 14.000 | 1,928.00 | 1 2 3 4 | 2,000.000 2,892.000 1,615.000 1,615.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 1,870.000 | 2.70 | 1 2 3 4 | 2.000 1.800 1.750 1.750 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 20.000 | 2,724.00 | 1 2 3 4 | 3,000.000 2,565.000 2,475.000 2,475.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 8.000 | 261.00 | 1 2 3 4 | 250.000 210.000 225.000 225.000 |
6626109 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 1,223.000 | 0.98 | 1 2 3 4 | 1.000 1.000 0.950 1.000 |
6626111 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | EA | 5,328.000 | 1.08 | 1 2 3 4 | 1.000 1.000 0.950 1.000 |
6666030007 | REFL PAV MRK TY I (W)8"(DOT)(100MIL) | LF | 3,010.000 | 1.40 | 1 2 3 4 | 0.750 0.730 0.750 0.700 |
6666036007 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 9,601.000 | 1.00 | 1 2 3 4 | 0.700 0.690 0.650 0.670 |
6666048007 | REFL PAV MRK TY I (W)24"(SLD)(100MIL) | LF | 460.000 | 5.63 | 1 2 3 4 | 5.250 5.200 7.500 5.000 |
6666224007 | PAVEMENT SEALER 4" | LF | 1,380.000 | 0.18 | 1 2 3 4 | 0.300 0.260 2.950 0.250 |
6666300007 | RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | LF | 1,378.000 | 0.39 | 1 2 3 4 | 0.400 0.390 0.500 0.380 |
6666303007 | RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | LF | 56,927.000 | 0.36 | 1 2 3 4 | 0.350 0.330 0.310 0.320 |
6666312007 | RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | LF | 12,148.000 | 0.40 | 1 2 3 4 | 0.350 0.350 0.320 0.340 |
6666315007 | RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | LF | 90,313.000 | 0.38 | 1 2 3 4 | 0.350 0.320 0.310 0.310 |
6686077 | PREFAB PAV MRK TY C (W) (ARROW) | EA | 30.000 | 210.13 | 1 2 3 4 | 200.000 200.000 190.000 193.000 |
6686078 | PREFAB PAV MRK TY C (W) (DBL ARROW) | EA | 6.000 | 344.98 | 1 2 3 4 | 350.000 357.000 300.000 344.000 |
6686083 | PREFAB PAV MRK TY C (W) (LNDP ARROW) | EA | 7.000 | 575.00 | 1 2 3 4 | 550.000 565.000 545.000 544.000 |
6686085 | PREFAB PAV MRK TY C (W) (WORD) | EA | 2.000 | 295.00 | 1 2 3 4 | 225.000 220.000 255.000 209.000 |
6686092 | PREFAB PAV MRK TY C (W) (36")(YLD TRI) | EA | 22.000 | 37.00 | 1 2 3 4 | 45.000 45.000 40.000 43.000 |
6726007 | REFL PAV MRKR TY I-C | EA | 262.000 | 4.00 | 1 2 3 4 | 5.000 4.150 4.600 4.000 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 799.000 | 3.88 | 1 2 3 4 | 4.000 3.100 4.050 3.000 |
6776001 | ELIM EXT PAV MRK & MRKS (4") | LF | 1,380.000 | 0.48 | 1 2 3 4 | 2.000 1.750 5.000 1.670 |
30766025 | D-GR HMA TY-C SAC-B PG70-22 | TON | 18,185.000 | 60.00 | 1 2 3 4 | 75.000 75.900 81.000 105.000 |
30846001 | BONDING COURSE | GAL | 33,056.000 | 2.70 | 1 2 3 4 | 3.250 2.100 2.600 2.800 |
60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 4.000 | 9,329.03 | 1 2 3 4 | 5,000.000 2,500.000 2,400.000 8,000.000 |
61856002002 | TMA (STATIONARY) | DAY | 20.000 | 195.00 | 1 2 3 4 | 200.000 420.000 240.000 250.000 |
61856003002 | TMA (MOBILE OPERATION) | HR | 480.000 | 49.80 | 1 2 3 4 | 60.000 65.000 10.000 75.000 |