Tabulation of Bids for Project BPM - 629932001

Last Update: Thursday, April 26, 2018
Text version of this page
County:BOWIELet Date:02/01/18
Type:BRIDGE PREVENTIVE MAINTENANCESeq No:4014
Time:250 WProject ID:BPM - 629932001
Highway:IH0030Contract #:02184014
Length:0.001CCSJ:6299-32-001
Limits: 
From:VARIOUSCheck:$24,000
To:.Misc Cost:
Estimate$1,197,405.00% Over/UnderCompany
Bidder 1$853,995.00-28.68%CDM HOLDINGS, LLC
Bidder 2$1,036,476.00-13.44%STATELINE CONSTRUCTION, LLC
Bidder 3$1,074,471.00-10.27%EAST TEXAS BRIDGE, INC.
Bidder 4$1,077,777.00-9.99%HARTBEAT CONSTRUCTION
Bidder 5$1,084,167.00-9.46%L.C. JORDAN & SON
Bidder 6$1,174,447.00-1.92%PIERCE R & B LLC
Bidder 7$1,315,370.00+9.85%HODGES AND SON CONSTRUCTION COMPANY, INC.
Bidder 8$1,415,180.00+18.19%SJ&J CONSTRUCTION, LLC
Bidder 9$1,482,060.00+23.77%FNH CONSTRUCTION, LLC
Bidder 10$1,613,145.00+34.72%CHAMPION INFRASTRUCTURE, LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1046009REMOVING CONC (RIPRAP)SY398.00015.001
2
3
4
5
6
7
8
9
10
5.000
22.000
22.000
18.000
20.000
22.000
125.000
40.000
30.000
60.000
1046025REMOVE CONC (WINGWALL)CY44.000350.001
2
3
4
5
6
7
8
9
10
110.000
125.000
350.000
250.000
100.000
250.000
180.000
150.000
300.000
1,400.000
1046054REMOVING CONCRETE(MOW STRIP)LF960.00012.001
2
3
4
5
6
7
8
9
10
7.000
12.000
10.000
7.000
20.000
35.000
10.000
10.000
15.000
65.000
1106002EXCAVATION (CHANNEL)CY650.00010.001
2
3
4
5
6
7
8
9
10
22.000
14.000
35.000
25.000
15.000
25.000
40.000
18.000
30.000
60.000
1326001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY190.00015.001
2
3
4
5
6
7
8
9
10
27.000
32.000
40.000
29.000
50.000
55.000
40.000
90.000
35.000
50.000
4016001FLOWABLE BACKFILLCY145.000350.001
2
3
4
5
6
7
8
9
10
175.000
200.000
325.000
250.000
215.000
350.000
180.000
200.000
350.000
210.000
4036001TEMPORARY SPL SHORINGSF1,400.00050.001
2
3
4
5
6
7
8
9
10
1.000
23.000
30.000
52.000
10.000
52.000
25.000
12.000
45.000
40.000
4296007CONC STR REPAIR (VERTICAL & OVERHEAD)SF260.000250.001
2
3
4
5
6
7
8
9
10
110.000
110.000
185.000
330.000
160.000
185.000
200.000
190.000
1,000.000
210.000
4296009CONC STR REPAIR (STANDARD)SF4.000500.001
2
3
4
5
6
7
8
9
10
1,400.000
500.000
400.000
380.000
400.000
250.000
400.000
100.000
1,000.000
300.000
4326033RIPRAP (STONE PROTECTION)(18 IN)CY1,850.000200.001
2
3
4
5
6
7
8
9
10
151.000
145.000
150.000
165.000
185.000
165.000
175.000
130.000
185.000
280.000
4326039BEDDING MATERIAL (6 IN)CY617.000230.001
2
3
4
5
6
7
8
9
10
145.000
110.000
150.000
110.000
176.000
150.000
100.000
35.000
60.000
240.000
4326045RIPRAP (MOW STRIP)(4 IN)CY150.000525.001
2
3
4
5
6
7
8
9
10
450.000
410.000
425.000
490.000
500.000
475.000
550.000
700.000
550.000
875.000
4666142WINGWALL (FW - 0) (HW=10 FT)EA1.00023,000.001
2
3
4
5
6
7
8
9
10
13,000.000
27,510.000
23,000.000
17,280.000
20,000.000
35,000.000
20,000.000
40,000.000
20,000.000
26,000.000
4666144WINGWALL (FW - 0) (HW=12 FT)EA2.00040,000.001
2
3
4
5
6
7
8
9
10
25,000.000
38,865.000
30,000.000
32,000.000
30,000.000
40,000.000
35,000.000
50,000.000
35,000.000
29,000.000
4666169WINGWALL (FW - S) (HW=8 FT)EA1.00016,000.001
2
3
4
5
6
7
8
9
10
13,000.000
26,410.000
20,000.000
17,200.000
15,000.000
30,000.000
12,000.000
35,000.000
20,000.000
22,000.000
4666170WINGWALL (FW - S) (HW=9 FT)EA1.00020,000.001
2
3
4
5
6
7
8
9
10
14,000.000
33,125.000
22,000.000
22,500.000
16,000.000
30,000.000
12,000.000
38,000.000
25,600.000
24,000.000
4806001CLEAN EXIST CULVERTSEA5.0003,000.001
2
3
4
5
6
7
8
9
10
6,500.000
2,000.000
5,000.000
4,500.000
10,000.000
1,000.000
20,000.000
2,000.000
1,500.000
1,600.000
5006001MOBILIZATIONLS1.000100,000.001
2
3
4
5
6
7
8
9
10
70,000.000
100,000.000
110,000.000
104,708.000
120,000.000
106,000.000
115,000.000
420,000.000
140,000.000
100,000.000
5026001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO12.0002,500.001
2
3
4
5
6
7
8
9
10
3,600.000
3,200.000
5,000.000
6,000.000
4,000.000
5,000.000
16,000.000
6,000.000
9,000.000
7,000.000
5406001MTL W-BEAM GD FEN (TIM POST)LF1,825.00022.001
2
3
4
5
6
7
8
9
10
17.000
18.000
20.000
8.000
20.000
18.500
30.000
50.000
35.000
25.000
5406017MTL BM GD FEN (LONG SPAN SYSTEM)LF150.00030.001
2
3
4
5
6
7
8
9
10
22.000
24.000
25.000
35.000
25.000
24.000
30.000
70.000
35.000
80.000
5406021MTL THRIE-BEAM GD FEN (TIM POST)EA1.0001,600.001
2
3
4
5
6
7
8
9
10
1,650.000
1,500.000
1,600.000
1,400.000
1,500.000
1,550.000
800.000
1,800.000
2,850.000
3,200.000
5426001REMOVE METAL BEAM GUARD FENCELF625.0004.001
2
3
4
5
6
7
8
9
10
4.000
1.000
5.000
3.000
5.000
4.500
2.000
5.000
3.000
20.000
5426002REMOVE TERMINAL ANCHOR SECTIONEA4.000250.001
2
3
4
5
6
7
8
9
10
300.000
300.000
350.000
190.000
400.000
325.000
400.000
500.000
500.000
500.000
5426004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA1.000275.001
2
3
4
5
6
7
8
9
10
250.000
300.000
300.000
200.000
400.000
275.000
400.000
500.000
500.000
300.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA13.0002,500.001
2
3
4
5
6
7
8
9
10
2,150.000
2,350.000
2,500.000
2,500.000
300.000
2,350.000
2,500.000
2,500.000
2,850.000
3,600.000
5446003GUARDRAIL END TREATMENT (REMOVE)EA5.000300.001
2
3
4
5
6
7
8
9
10
250.000
250.000
300.000
300.000
400.000
375.000
400.000
600.000
850.000
600.000
6586001INSTL DEL ASSM (D-SW)SZ 1(FLX)GNDEA3.00050.001
2
3
4
5
6
7
8
9
10
48.000
50.000
55.000
50.000
65.000
52.000
50.000
90.000
100.000
60.000
6586002INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)EA18.00060.001
2
3
4
5
6
7
8
9
10
42.000
50.000
50.000
40.000
65.000
45.000
50.000
90.000
100.000
60.000
7886001CONCRETE BEAM REPAIREA3.0002,500.001
2
3
4
5
6
7
8
9
10
6,000.000
40,000.000
12,000.000
3,000.000
12,000.000
10,000.000
4,000.000
10,000.000
22,000.000
9,500.000