The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | MCLENNAN | Let Date: | 02/01/24 |
Type: | REMOVAL AND DISPOSAL OF BRIDGE | Seq No: | 3036 |
Time: | 30 WORKING DAYS | Project ID: | BR 2024(859) |
Highway: | BU 77-L | Contract #: | 02243036 |
Length: | 0.000 | CCSJ: | 0014-10-071 |
Limits: | |||
From: | @ POTTS INTERCHANGE | Check: | $25,000 |
To: | @ POTTS INTERCHANGE | Misc Cost: |
Estimate | $1,247,631.06 | % Over/Under | Company |
Bidder 1 | $1,121,180.80 | -10.14% | KNIFE RIVER CORPORATION - SOUTH |
Bidder 2 | $1,307,707.00 | +4.82% | JAMES CONSTRUCTION GROUP, LLC |
Bidder 3 | $1,531,936.75 | +22.79% | BIG CREEK CONSTRUCTION, LTD. |
Bidder 4 | $1,941,568.00 | +55.62% | FNH CONSTRUCTION, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1046001 | REMOVING CONC (PAV) | SY | 10,715.000 | 17.50 | 1 2 3 4 | 15.000 15.000 14.500 20.000 |
1046011 | REMOVING CONC (MEDIANS) | SY | 1,027.000 | 36.00 | 1 2 3 4 | 22.000 7.000 12.000 20.000 |
1046027 | REMOVING CONC (APPR SLAB) | SY | 348.000 | 50.00 | 1 2 3 4 | 25.000 19.000 60.000 100.000 |
1106001 | EXCAVATION (ROADWAY) | CY | 21,514.000 | 15.53 | 1 2 3 4 | 14.000 16.070 23.000 15.000 |
1326007 | EMBANKMENT (FINAL)(ORD COMP)(TY D) | CY | 3,343.000 | 20.00 | 1 2 3 4 | 5.000 13.920 20.000 30.000 |
1606003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 23,612.000 | 1.00 | 1 2 3 4 | 2.000 0.320 3.000 8.000 |
1626008 | ROLL SODDING | SY | 2,633.000 | 5.50 | 1 2 3 4 | 6.500 5.730 6.000 10.000 |
1646007 | BROADCAST SEED (PERM) (URBAN) (CLAY) | SY | 20,979.000 | 0.76 | 1 2 3 4 | 0.200 0.200 0.250 1.000 |
1686001 | VEGETATIVE WATERING | MG | 190.000 | 15.00 | 1 2 3 4 | 50.000 31.170 46.000 50.000 |
4796006 | ADJUSTING INLET (CAP) | EA | 3.000 | 2,650.00 | 1 2 3 4 | 3,800.000 8,325.570 4,500.000 2,500.000 |
4966011 | REMOV STR (BRIDGE 500 - 999 FT LENGTH) | EA | 2.000 | 150,000.00 | 1 2 3 4 | 130,000.000 139,410.000 175,000.000 200,000.000 |
5006001008 | MOBILIZATION | LS | 1.000 | 78,191.64 | 1 2 3 4 | 85,000.000 131,551.700 150,000.000 175,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 2.000 | 7,000.00 | 1 2 3 4 | 3,000.000 19,227.990 10,000.000 15,000.000 |
5066035005 | SANDBAGS FOR EROSION CONTROL | EA | 3.000 | 18.25 | 1 2 3 4 | 100.000 61.780 10.000 50.000 |
5066038005 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 3,774.000 | 4.00 | 1 2 3 4 | 4.000 4.260 3.500 4.000 |
5066039005 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 3,774.000 | 2.50 | 1 2 3 4 | 1.000 1.140 1.250 2.000 |
5126021 | PORT CTB (DES SOURCE)(LOW PROF)(TY 1) | LF | 120.000 | 12.00 | 1 2 3 4 | 50.000 28.530 32.000 40.000 |
5126022 | PORT CTB (DES SOURCE)(LOW PROF)(TY 2) | LF | 80.000 | 13.90 | 1 2 3 4 | 50.000 42.800 20.000 40.000 |
5126045 | PORT CTB (STKPL)(LOW PROF)(TY 1) | LF | 120.000 | 12.00 | 1 2 3 4 | 50.000 28.530 32.000 40.000 |
5126046 | PORT CTB (STKPL)(LOW PROF)(TY 2) | LF | 80.000 | 12.33 | 1 2 3 4 | 50.000 42.800 20.000 40.000 |
5296008 | CONC CURB & GUTTER (TY II) | LF | 120.000 | 45.00 | 1 2 3 4 | 78.000 57.740 90.000 65.000 |
5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 555.000 | 4.00 | 1 2 3 4 | 7.500 5.000 6.000 5.000 |
5426003 | REMOVE DOWNSTREAM ANCHOR TERMINAL | EA | 1.000 | 172.21 | 1 2 3 4 | 500.000 1,000.000 250.000 1,500.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 1.000 | 269.24 | 1 2 3 4 | 500.000 1,500.000 350.000 2,500.000 |
6106009 | REMOVE RD IL ASM (TRANS-BASE) | EA | 12.000 | 525.00 | 1 2 3 4 | 1,350.000 920.000 1,000.000 2,500.000 |
6186023 | CONDT (PVC) (SCH 40) (2") | LF | 23.000 | 13.50 | 1 2 3 4 | 75.000 65.000 72.000 50.000 |
6186047 | CONDT (PVC) (SCH 80) (2") (BORE) | LF | 88.000 | 45.00 | 1 2 3 4 | 95.000 85.000 95.000 100.000 |
6186064 | CONDT (RM) (1") | LF | 30.000 | 32.65 | 1 2 3 4 | 35.000 30.000 35.000 150.000 |
6206007 | ELEC CONDR (NO.8) BARE | LF | 156.000 | 1.29 | 1 2 3 4 | 5.500 2.000 2.500 3.000 |
6206008 | ELEC CONDR (NO.8) INSULATED | LF | 312.000 | 1.90 | 1 2 3 4 | 6.750 3.000 3.500 3.000 |
6246001 | GROUND BOX TY A (122311) | EA | 2.000 | 900.00 | 1 2 3 4 | 1,250.000 1,100.000 1,200.000 1,500.000 |
6286009 | ELC SRV TY A 120/240 060(NS)SS(E)SP(O) | EA | 1.000 | 7,300.00 | 1 2 3 4 | 10,000.000 8,500.000 9,500.000 9,500.000 |
6446033 | IN SM RD SN SUP&AM TYS80(1)SA(U) | EA | 2.000 | 950.00 | 1 2 3 4 | 1,025.000 900.000 1,000.000 1,500.000 |
6446060 | IN SM RD SN SUP&AM TYTWT(1)WS(P) | EA | 9.000 | 525.00 | 1 2 3 4 | 575.000 390.000 550.000 1,500.000 |
6446061 | IN SM RD SN SUP&AM TYTWT(1)WS(T) | EA | 4.000 | 585.00 | 1 2 3 4 | 625.000 415.000 600.000 1,500.000 |
6446076 | REMOVE SM RD SN SUP&AM | EA | 24.000 | 132.93 | 1 2 3 4 | 110.000 80.000 110.000 100.000 |
6506204 | REMOVE OVERHD SIGN SUP | EA | 2.000 | 8,000.00 | 1 2 3 4 | 6,000.000 5,000.000 5,500.000 2,500.000 |
6666048007 | REFL PAV MRK TY I (W)24"(SLD)(100MIL) | LF | 380.000 | 10.00 | 1 2 3 4 | 17.000 16.930 12.000 20.000 |
51326001 | LEAD CONTAINING COATING MANAGEMENT | SF | 120.000 | 71.00 | 1 2 3 4 | 100.000 743.000 100.000 1,150.000 |
61856002002 | TMA (STATIONARY) | DAY | 14.000 | 300.00 | 1 2 3 4 | 250.000 410.050 200.000 250.000 |
63686001 | SOLAR POWERED LED SIGN | EA | 8.000 | 5,500.00 | 1 2 3 4 | 3,500.000 4,350.000 3,150.000 12,500.000 |