1003 6001 - 1012 2002
Item NoDescriptionUnitsJune 30, 2018Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
1003 6001TRANSPLANT PLANT MATERIALEA  384.0001,087.372582
1003 6002TRANSPLANT PLANT MATERIAL (TYPE I)EA  20.000950.000001
1007 6004IRRIGATION WELL (24")EA1.0007,000.000001.0007,000.000001
1007 6006IRRIGATION GATE (24")EA1.0003,750.000001.0003,750.000001
1007 6009IRRIGATION WELL (36")EA2.0008,000.000005.0006,110.000002
1007 6012IRRIGATION GATE (12")EA  1.0003,925.000001
1007 6013IRRIGATION GATE (15")EA  3.0005,950.000001
1008 6001PRSSR IRRIG PVC PIPE (18")LF  88.00029.000001
1008 6003PRSSR IRRIG PVC PIPE (12")LF  4.000165.000001
1008 6006PRSSR IRRIGATION PVC PIPE (15")LF  738.00019.000001
1012 2002TRANSPLANT PLANT MATERIAL (PALM)EA  11.000200.000001