Item No | Description | Units | March 31, 2019 | Twelve-Month-Moving | Usage |
Quantity | Avg Bid | Quantity | Avg Bid |
770 6021 | REPLACE SINGLE GDRAIL TERMINAL RAIL | LF | | | 1,250.000 | 38.86600 | 2 |
770 6022 | REPLACE SINGLE GDRAIL TERMINAL POST | EA | | | 140.000 | 84.63429 | 2 |
770 6024 | REPLACE TERMINAL ANCHOR POSTS | EA | | | 10.000 | 15.00000 | 1 |
770 6025 | REPLACE HINGED TOP SGT STEEL POST | EA | | | 10.000 | 150.00000 | 1 |
770 6027 | REMOVE GDRAIL END TRT / REPL WITH SGT | EA | | | 100.000 | 2,369.44000 | 2 |
770 6028 | REPL SINGLE GDRAIL TERM IMPACT HEAD | EA | | | 15.000 | 912.29333 | 2 |
770 6029 | REM & RESET SGT IMPACT HEAD | EA | | | 50.000 | 52.28800 | 2 |
770 6031 | REPLACE SGT CABLE ANCHOR | EA | | | 21.000 | 61.42857 | 2 |
770 6032 | REPLACE SGT STRUT | EA | | | 8.000 | 175.00000 | 2 |
770 6033 | REPLACE SGT OBJECT MARKER | EA | | | 20.000 | 60.00000 | 1 |
770 6034 | REPAIR RAIL ELEMENT(W - BEAM FURNISHED | LF | | | 2,000.000 | 14.75000 | 1 |
770 6052 | REPAIR STEEL POST WITH BASE PLATE | EA | | | 6.000 | 210.00000 | 1 |
771 6002 | REPLACE POSTS (TL-4) | EA | | | 200.000 | 130.00000 | 1 |
771 6004 | CABLE SPLICE / TURNBUCKLE (TL-4) | EA | | | 10.000 | 100.00000 | 1 |
771 6006 | REPAIR CONCRETE FOUNDATION (TL-4) | EA | | | 15.000 | 50.00000 | 1 |
771 6008 | REPR OR REPLC CABLE BARR TERM SEC(TL-4 | EA | | | 15.000 | 900.00000 | 1 |
771 6010 | REPLACE CABLE (TL-4) | LF | | | 200.000 | 6.00000 | 1 |
771 6011 | CHECK / RE-TENSION CABLE | EA | | | 40.000 | 255.00000 | 1 |
774 6001 | REMOVE AND REPLACE (TRACC) | EA | | | 2.000 | 18,000.00000 | 1 |
774 6003 | REMOVE AND REPLACE (NARROW REACT 350) | EA | | | 2.000 | 22,000.00000 | 1 |
774 6007 | REPAIR (TRACC) | LF | | | 15.000 | 400.00000 | 1 |
774 6010 | REPAIR (REACT) | EA | | | 2.000 | 5,000.00000 | 1 |
774 6011 | REPAIR (CATCB - FRNT SECT) | EA | | | 2.000 | 291.53000 | 1 |
774 6012 | REPAIR (CATCB - REAR SECT) | EA | | | 2.000 | 291.53000 | 1 |
774 6038 | REMOVE AND REPLACE (FASTRACC) | EA | | | 2.000 | 19,000.00000 | 1 |
774 6052 | REPAIR (FASTRACC) | LF | | | 25.000 | 425.00000 | 1 |
774 6079 | REMOVE & REPLACE TRACC (TXDOT FURNISHD | EA | | | 2.000 | 3,500.00000 | 1 |
774 6080 | REMOVE & REPLACE REACT 350(TXDOT FRNSH | EA | | | 2.000 | 3,800.00000 | 1 |
774 6090 | REPAIR (HEART) | EA | | | 2.000 | 2,980.00000 | 1 |
700 2003 | POTHOLE REPAIR (STANDARD) | TON | | | 864.000 | 108.78000 | 1 |
700 6003 | POTHOLE REPAIR (STANDARD) | TON | | | 200.000 | 200.00000 | 1 |
712 6008 | JT / CRCK SEAL (RUBBER - ASPHALT) | LMI | | | 1,856.197 | 566.27420 | 5 |
721 6002 | FIBER REINFORCED POLYMER PATCHING MATL | LB | | | 10,000.000 | 7.57500 | 2 |
730 6002 | FULL - WIDTH MOWING | AC | | | 106,350.000 | 33.76623 | 17 |
730 6003 | SPOT MOWING | AC | | | 1,732.000 | 27.98383 | 14 |
734 6001 | LITTER REMOVAL | AC | | | 21,725.000 | 14.96980 | 10 |
738 6001 | CLEANING / SWEEPING (CENTER MEDIAN) | CYC | | | 9.000 | 1,619.00000 | 1 |
738 6003 | CLEANING / SWEEPING (OUTSIDE MAIN LANE | CYC | | | 9.000 | 1,233.00000 | 1 |
738 6005 | CLEANING / SWEEPING (FRONTAGE ROAD) | CYC | | | 9.000 | 1,234.00000 | 1 |
738 6007 | CLEANING / SWEEPING(ENTRANCE/EXIT RAMP | CYC | | | 9.000 | 819.00000 | 1 |
738 6010 | CLEANING / SWEEPING (SPOT) | MI | | | 100.000 | 99.00000 | 1 |
752 6003 | TREE TRIMMING / BRUSH REMOVAL | MI | 50.000 | 1,900.00000 | 470.000 | 1,521.14894 | 6 |
752 6004 | TREE TRIMMING / BRUSH REMOVAL(CHANNELS | AC | 15.000 | 1,400.00000 | 85.000 | 800.00000 | 5 |
752 6005 | TREE REMOVAL (4" - 12" DIA) | EA | 750.000 | 48.00000 | 10,700.000 | 37.19907 | 7 |
752 6006 | TREE REMOVAL (12" - 18" DIA) | EA | 200.000 | 90.00000 | 2,577.000 | 61.83547 | 8 |
752 6007 | TREE REMOVAL (18" - 24" DIA) | EA | 100.000 | 175.00000 | 1,152.000 | 97.87326 | 8 |
752 6008 | TREE REMOVAL (24" - 30" DIA) | EA | 75.000 | 200.00000 | 575.000 | 165.47826 | 7 |
752 6009 | TREE REMOVAL (30" - 36" DIA) | EA | 20.000 | 250.00000 | 182.000 | 365.93407 | 8 |
752 6010 | TREE REMOVAL (36" - 42" DIA) | EA | 10.000 | 500.00000 | 100.000 | 487.90000 | 7 |
752 6011 | TREE REMOVAL (42" - 48" DIA) | EA | 5.000 | 500.00000 | 70.000 | 442.71429 | 7 |
752 6012 | TREE REMOVAL (48" - 60" DIA) | EA | 1.000 | 1,000.00000 | 51.000 | 364.80392 | 7 |
752 6013 | TREE REMOVAL (60" - 72" DIA) | EA | 1.000 | 1,000.00000 | 24.000 | 242.37500 | 6 |
752 6014 | STUMP REMOVAL | EA | | | 30.000 | 15.16667 | 5 |
752 6019 | TREE REMOVAL (72" - 84" DIA) | EA | 1.000 | 1,000.00000 | 2.000 | 950.00000 | 2 |
760 6001 | DITCH CLEANING AND RESHAPING (FOOT) | LF | | | 564,875.000 | 1.75543 | 4 |
760 6003 | DITCH CLEAN/RESHAPING(CU YD IN VEHICLE | CY | | | 330.000 | 18.00000 | 1 |
770 6001 | REPAIR RAIL ELEMENT (W - BEAM) | LF | | | 2,600.000 | 15.00000 | 1 |
770 6002 | REPAIR RAIL ELEMENT (THRIE - BEAM) | LF | | | 280.000 | 26.42857 | 2 |
770 6003 | REP RAIL ELMNT(THRIE-BM TRANS TO W -BM | LF | | | 230.000 | 26.73913 | 2 |
770 6004 | REPAIR RAIL ELEMENT (CURVED RAIL) | LF | | | 80.000 | 20.00000 | 1 |
770 6011 | REM / REPL TIMBER / STL POST W/CONC FN | EA | | | 50.000 | 40.00000 | 1 |
770 6012 | REM / REPL TIMBER POST W / O CONC FND | EA | | | 250.000 | 37.00000 | 1 |
770 6013 | REM / REPL STEEL POST W / O CONC FND | EA | | | 30.000 | 35.00000 | 1 |
770 6014 | REM / REPL TIMBER POST W / CONC FND | EA | | | 5.000 | 1.00000 | 1 |
770 6015 | REM / REPL STEEL POST W / CONC FND | EA | | | 5.000 | 1.00000 | 1 |
770 6016 | REPAIR STEEL POST WITH BASE PLATE | EA | | | 5.000 | 200.00000 | 1 |
770 6017 | REALIGN POSTS | EA | | | 450.000 | 15.00000 | 2 |
770 6019 | REMOVE & REPLACE BLOCKOUT | EA | | | 100.000 | 18.00000 | 1 |
770 6021 | REPLACE SINGLE GDRAIL TERMINAL RAIL | LF | | | 2,800.000 | 24.42857 | 2 |
770 6022 | REPLACE SINGLE GDRAIL TERMINAL POST | EA | | | 480.000 | 50.00000 | 2 |
770 6024 | REPLACE TERMINAL ANCHOR POSTS | EA | | | 5.000 | 1.00000 | 1 |
770 6027 | REMOVE GDRAIL END TRT / REPL WITH SGT | EA | | | 36.000 | 2,000.00000 | 1 |
770 6028 | REPL SINGLE GDRAIL TERM IMPACT HEAD | EA | | | 52.000 | 923.07692 | 2 |
770 6029 | REM & RESET SGT IMPACT HEAD | EA | | | 72.000 | 116.66667 | 2 |
770 6031 | REPLACE SGT CABLE ANCHOR | EA | | | 10.000 | 75.00000 | 1 |
770 6032 | REPLACE SGT STRUT | EA | | | 4.000 | 75.00000 | 1 |
770 6034 | REPAIR RAIL ELEMENT(W - BEAM FURNISHED | LF | | | 1,500.000 | 15.00000 | 1 |
770 6035 | REPAIR RAIL ELEMENT(THRIE - BEAM)(FURN | LF | | | 300.000 | 20.00000 | 1 |
770 6036 | REP RAIL ELMNT (THRIE - BM TRANS)(FURN | LF | | | 100.000 | 20.00000 | 1 |
770 6043 | REM/REP TIM/STL POST W/O CONC FND(FURN | EA | | | 500.000 | 25.00000 | 1 |
770 6044 | INSTALL BLOCKOUTS (FURNISHED) | EA | | | 50.000 | 20.00000 | 1 |
774 6006 | REPAIR (TRACC) | EA | | | 2.000 | 8,000.00000 | 1 |
774 6011 | REPAIR (CATCB - FRNT SECT) | EA | | | 1.000 | 1,000.00000 | 1 |
774 6018 | REPAIR (CATGR - FRONT SECTION) | EA | | | 1.000 | 1,000.00000 | 1 |
774 6019 | REPAIR (CATGR - END SECTION) | EA | | | 1.000 | 1,000.00000 | 1 |
774 6030 | REPAIR (REACT 350) (W) | EA | | | 2.000 | 5,000.00000 | 1 |
778 6002 | CONCRETE RAIL REPAIR (MISC) | LF | | | 50.000 | 247.00000 | 1 |
770 6001 | REPAIR RAIL ELEMENT (W - BEAM) | LF | | | 2,600.000 | 15.00000 | 1 |
770 6002 | REPAIR RAIL ELEMENT (THRIE - BEAM) | LF | | | 280.000 | 26.42857 | 2 |
770 6003 | REP RAIL ELMNT(THRIE-BM TRANS TO W -BM | LF | | | 230.000 | 26.73913 | 2 |
770 6004 | REPAIR RAIL ELEMENT (CURVED RAIL) | LF | | | 80.000 | 20.00000 | 1 |
770 6011 | REM / REPL TIMBER / STL POST W/CONC FN | EA | | | 50.000 | 40.00000 | 1 |
770 6012 | REM / REPL TIMBER POST W / O CONC FND | EA | | | 250.000 | 37.00000 | 1 |
770 6013 | REM / REPL STEEL POST W / O CONC FND | EA | | | 30.000 | 35.00000 | 1 |
770 6014 | REM / REPL TIMBER POST W / CONC FND | EA | | | 5.000 | 1.00000 | 1 |
770 6015 | REM / REPL STEEL POST W / CONC FND | EA | | | 5.000 | 1.00000 | 1 |
770 6016 | REPAIR STEEL POST WITH BASE PLATE | EA | | | 5.000 | 200.00000 | 1 |
770 6017 | REALIGN POSTS | EA | | | 450.000 | 15.00000 | 2 |
770 6019 | REMOVE & REPLACE BLOCKOUT | EA | | | 100.000 | 18.00000 | 1 |
770 6021 | REPLACE SINGLE GDRAIL TERMINAL RAIL | LF | | | 2,800.000 | 24.42857 | 2 |