AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - LUFKIN DISTRICT

Last Update: Friday, April 06, 2018
ITEMS 204 6003 TO 276 6230
ItemsItemsBid Code Range
0100 - 0169
0204 - 0276
0310 - 0354
0400 - 0496
0500 - 0560
0610 - 0688
1009 - 1009
4027 - 4027
5000 - 5000
6001 - 6266
204 6003 - 276 6230
Item NoDescriptionUnitsMarch 31, 2018Twelve-Month-MovingUsage
QuantityAvg BidQuantityAvg Bid
204 6003SPRINKLING (DUST CONTROL)MG  2,847.0006.190732
247 6061FL BS (CMP IN PLC)(TYA GR1-2) (6")SY  4,190.00026.700954
247 6121FL BS (RDWY DEL) (TY A GR 1-2)TON1,278.00036.75000151,568.00037.680915
260 2001LIME (HYDRATED LIME (DRY))TON  5.000287.000001
260 2011LIME TRT (EXST MATL) (12")SY  234.00063.000001
275 6001CEMENTTON59.000165.000007,375.000143.410445
275 6005CEMENT TREAT (EXIST MATL)(12")SY  6,035.0001.850001
275 6023CEMENT TREAT(MX EXST MTL & NW BS)(12")SY3,243.0004.65000278,599.0002.948413
275 6054CEMENT TREAT (NEW BASE 14")SY  39,456.0002.587882
275 6065CEM TRT(MX EXST MTL & NEW BS)(14")SY  84,341.0003.124272
275 6080CEMENT TREAT (SUBGRADE)(12")SY  5,850.0003.250001
276 6230CEM TRT(PLNT MX) (CLN)(TYA)(GR1-2)(10"SY  2,254.00040.000001