Monthly State Let Construction Report For Corpus Christi District As Of Apr 10, 2018 Page 1 Of 3

Last Update: Friday, April 20, 2018
FTP Icon
page 1 | page 2 | page 3

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountySAN PATRICIO
HighwayIH 37
FromNUECES COUNTY LINE
ToBRIDGE (CONTROL BREAK)
CSJ0074-05-097
Proj IDNH 2018(176)
Work TypeMILL,SEAL AND OVERLAY SB LANES ONLY
 
13.7526225552.230.000.0
Work Order01-25-18
Work Began00-00-00
Work Completed
Time Computed12-01-17
Contract Working Days151
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0074-05-097
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #10173012
Totals6225552.230.000.000.0

CountyNUECES
HighwayIH 37
FromSOUTHERN MINERALS ROAD
ToN CLARKWOOD
CSJ0074-06-221
Proj IDNH 2018(335)
Work TypeMILL,UNDERSEAL,OVERLAY AND NOVACHIP
 
2.5464615768.3331200.000.6
Work Order01-10-18
Work Began00-00-00
Work Completed
Time Computed02-01-18
Contract Working Days85
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0074-06-221
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #12173025
Totals4615768.330.0031200.000.6

CountyNUECES
HighwayIH 37
FromSH 358
ToSOUTHERN MINERALS
CSJ0074-06-226
Proj IDNH 1602(215)
Work TypeMILL, SEAL AND OVERALY
 
2.2006667563.575208561.7178.1
Work Order12-06-16
Work Began04-18-17
Work Completed
Time Computed01-04-17
Contract Working Days100
Addl Days Granted73
Working Days Charged136
Percent Time Used78
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0074-06-226
CHEROKEE SERVICES (0.57)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (2.03)
HAAS-ANDERSON CONSTRUCTION, LTD. (0.00)
HIGHWAY BARRICADES AND SERVICES, LLC (1.07)
N-LINE TRAFFIC MAINTENANCE, L.P. (2.22)
S.A. CONCEPTS CONSTRUCTION (6.96)
SOIL-TECH, INC. (0.08)
THE LEVY COMPANY, L.P. (2.02)
WEBBER BARRIER SERVICES, LLC. (0.83)
Contract #07163023
Totals6667563.5791304.115208561.7178.1

CountyNUECES
HighwayIH 37
From1.381 MI W OF US 181
To1.224 MI W OF SH 358
CSJ0074-06-228
Proj IDSTP 1702(337)HES
Work TypeIMPROVE TRAFFIC SIGNAL, INTER. SIG.
 
4.100287845.1066400.0023.0
CountyNUECES
HighwayIH 37
From0.203 MI E OF FM 3386
To0.216 MI W OF FM 24
CSJ0074-06-229
Proj IDSTP 1702(338)HES
Work TypeIMPROVE TRAFFIC SIGNALS, INTER.SIGN
 
1.060208601.50175804.5084.2
Work Order07-11-17
Work Began10-26-17
Work Completed
Time Computed09-10-17
Contract Working Days129
Addl Days Granted0
Working Days Charged60
Percent Time Used46
Contractor(s)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0074-06-228
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06173236
Totals496446.6016250.00242204.5048.7

CountyJIM WELLS
HighwaySH 44
From1.4 MI W OF FM 2507
ToINTERS FM 1554 (CONTROL BREAK)
CSJ0086-11-048
Proj IDSTP 1702(096)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
3.33941697.5547776.8399.9
CountyJIM WELLS
HighwaySH 44
FromINTERS. FM 1554 (CONTROL BREAK)
To1.1 M E OF FM 1931
CSJ0087-01-106
Proj IDSTP 1702(097)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
3.974135641.40130383.9096.1
CountyJIM WELLS
HighwayBU 281R
FromO.2 MI N OF FM 3376
To.2 MI N OF FM 1352 (CONTROL BREAK)
CSJ0254-03-078
Proj IDSTP 1702(104)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
3.43746062.7540944.7588.8
CountyJIM WELLS
HighwayBU 281R
From.2 MI N OF FM 1352 (CONTROL BREAK)
ToO.2 MI S OF FM 1352
CSJ0255-01-080
Proj IDSTP 1702(105)HES
Work TypeIMPROVE TRAFFIC SIGNALS
 
0.90035587.1527440.6577.1
Work Order09-14-17
Work Began10-16-17
Work Completed
Time Computed10-14-17
Contract Working Days66
Addl Days Granted0
Working Days Charged33
Percent Time Used50
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0086-11-048
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #05173031
Totals258988.850.00246546.1395.1

CountySAN PATRICIO
HighwayUS 181
From0.14 MI W OF CR 3667_(CR 81)
To1.2 M E OF CR 3667_(CR 81)
CSJ0101-04-115
Proj IDNH 2018(187)
Work TypeCONSTRUCT/EXTEND TURN LANES
 
1.335933485.52162266.0217.3
Work Order11-15-17
Work Began01-15-18
Work Completed
Time Computed12-15-17
Contract Working Days68
Addl Days Granted0
Working Days Charged45
Percent Time Used66
Contractor(s)
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0101-04-115
SOIL-TECH, INC (1.43)
HIGHWAY BARRICADES AND SERVICES, LLC (3.61)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (14.49)
WEST TEXAS RUMBLE STRIP (0.42)
PERFORMANCE EQUIPMENT SERVICE (1.23)
Contract #10173204
Totals933485.5259413.52162266.0217.3

CountyNUECES
HighwaySH 44
FromW. END OF CLARKWOOD RELIEF ROUTE
ToWEST OF FM 3386
CSJ0102-01-106
Proj IDNH 2013(751)
Work TypeGRADE,BASE,S URF,STRS
 
1.14616390152.9618693719.1299.9
Work Order09-11-15
Work Began01-04-16
Work Completed
Time Computed10-11-15
Contract Working Days356
Addl Days Granted96
Working Days Charged452
Percent Time Used100
Contractor(s)
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0102-01-106
HIGHWAY BARRICADES AND SERVICES, LLC (0.59)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.07)
WEBBER BARRIER SERVICES, LLC. (0.89)
SCOTT DERR PAINTING CO, LLC (0.20)
K.L. DURHAM CONSTRUCTION, LLC (0.41)
STAR OPERATIONS, INC. (2.14)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.97)
D & S TEXAS ICON CONSTRUCTION, LLC. (0.62)
CABCOS CONTRACTORS LLC (2.53)
MCL CONTRACTING, LLC (0.05)
D & C CONCRETE CUTTING, INC. (0.08)
GUERRA UNDERGROUND, LLC (0.52)
NATIONAL POWER RODDING GROUP (0.07)
V.C. HUFF, L.L.C. (1.58)
WEST TX RUMBLE STRIP (0.02)
Contract #07153007
Totals16390152.9691103.6818693719.1299.9

CountyNUECES
HighwayUS 77
FromFM 892
ToS OF CR 28
CSJ0102-02-096
Proj IDC 102-2-96
Work TypeGRADE,BASE,SURF,STRS
 
4.03938721708.4341395073.6899.9
Work Order12-17-13
Work Began01-04-16
Work Completed
Time Computed09-01-13
Contract Working Days527
Addl Days Granted0
Working Days Charged498
Percent Time Used94
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0102-02-096
IOC COMPANY LLC (5.78)
PANTHER CREEK TRANSPORTATION, INC. (3.94)
K.L. DURHAM CONSTRUCTION, LLC (0.25)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.45)
HIGHWAY BARRICADES AND SERVICES, LLC (0.71)
LAYFIELD CONSTRUCTION, INC (0.47)
ACTION CONSTRUCTORS (3.28)
SHINN & GREGORY, INC. (0.85)
MICA CORPORATION (1.75)
MCL CONTRACTING, LLC (0.19)
SOIL-TECH, INC. (0.85)
WEBBER BARRIER SERVICES, LLC. (1.05)
CABCOS CONTRACTORS LLC (1.01)
Contract #07133202
Totals38721708.433170931.1541395073.6899.9

CountyKLEBERG
HighwayUS 77
FromSH 285
ToEND OF FIVE LANE SECTION
CSJ0102-04-104
Proj IDNH 2017(156)
Work TypeMILL AND OVERLAY
 
1.4901551557.311102517.6874.9
CountyKLEBERG
HighwayUS 77
FromSH 285
ToKENEDY COUNTY LINE
CSJ0327-01-032
Proj IDNH 2017(156)
Work TypeMILL AND OVERLAY
 
2.0401765567.341850938.6699.9
Work Order01-17-17
Work Began09-18-17
Work Completed
Time Computed02-16-17
Contract Working Days60
Addl Days Granted0
Working Days Charged122
Percent Time Used203
Contractor(s)
FOREMOST PAVING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0102-04-104
HIGHWAY BARRICADES AND SERVICES, LLC (0.23)
PRIMATE CONSTRUCTION, INC. (0.72)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.53)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (3.21)
WEST TEXAS RUMBLE STRIP (0.12)
Contract #10163216
Totals3317124.65965799.362953456.3490.8

CountyGOLIAD ETC
HighwayUS 183 ETC
From2.4 MI N OF FM 1961
To.2 MI N OF FM 119 INTERSECTION
CSJ0155-02-026
Proj IDSTP 2018(522)HES
Work TypeTEXTURIZE SHLDRS, CENTERLINE TEXTUR
 
127.080858712.660.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-08-18
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days187
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
BATTERSON, LLP
SUBCONTRACTOR(S) FOR CCSJ: 0155-02-026
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02183013
Totals858712.660.000.000.0

CountyARANSAS
HighwayBS 35-L
From0.32 MI E OF FM 2165
ToFM 1069
CSJ0180-05-064
Proj IDSTP 2017(631)HES
Work TypeIMPROVE TRAFFIC SIGNAL, INTER. SIG
 
0.532265591.5589270.0033.6
CountyLIVE OAK
HighwayUS 281
From.5 MI N OF BU 59
To.5 MI S OF US 59
CSJ0254-01-143
Proj IDSTP 2017(632)HES
Work TypeIMPROVE TRAFFIC SIGNAL, INTER. SIGN
 
1.504165028.35167464.7099.9
Work Order03-08-17
Work Began07-14-17
Work Completed
Time Computed04-07-17
Contract Working Days154
Addl Days Granted0
Working Days Charged85
Percent Time Used55
Contractor(s)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0180-05-064
LONE STAR TOWER (1.06)
TRIPLE H FIELD SERVICES, LLC (24.41)
Contract #02173209
Totals430619.9018610.00256734.7059.6

CountySAN PATRICIO
HighwaySL 90
FromON LP 90 (HARRISON RD) FROM BS35-L
ToGOODNIGHT ST.
CSJ0180-09-018
Proj IDSTP 1602(610)
Work TypeLANDSCAPE WORK
 
0.425205057.00212120.0899.9
Work Order04-19-17
Work Began11-06-17
Work Completed
Time Computed05-22-17
Contract Working Days60
Addl Days Granted0
Working Days Charged51
Percent Time Used85
Contractor(s)
TIGHT LINE CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0180-09-018
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #03173012
Totals205057.001000.00212120.0899.9

CountySAN PATRICIO
HighwaySH 361
FromSH 35
ToEND OF DIVIDED SECTION
CSJ0180-10-077
Proj IDSTP 2017(963)
Work TypeSEAL AND OVERLAY
 
4.4523335329.15994541.2029.8
Work Order07-31-17
Work Began01-31-18
Work Completed
Time Computed08-31-17
Contract Working Days82
Addl Days Granted0
Working Days Charged26
Percent Time Used31
Contractor(s)
HAAS-ANDERSON CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0180-10-077
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (5.25)
HIGHWAY BARRICADES AND SERVICES, LLC (3.20)
WEST TX RUMBLE STRIP (0.26)
TERRY L. ELLIS BACKHOE (0.73)
K.L. DURHAM CONSTRUCTION, LLC (4.70)
SOIL-TECH, INC (0.12)
Contract #04173025
Totals3335329.15609552.71994541.2029.8

CountyLIVE OAK
HighwayUS 281
From5.3 MI S OF US 59
ToJIM WELLS COUNTY LINE
CSJ0254-02-042
Proj IDNH 2018(445)
Work TypeBASE,SURF
 
13.3378925015.091066998.7311.9
Work Order02-14-18
Work Began03-19-18
Work Completed
Time Computed03-16-18
Contract Working Days134
Addl Days Granted0
Working Days Charged8
Percent Time Used5
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0254-02-042
HIGHWAY BARRICADES AND SERVICES, LLC (3.89)
DELGADO"S CONTRACTORS, LLC (3.95)
RPV CONSTRUCTION (3.22)
WEST TEXAS RUMBLE STRIP (0.21)
CHEROKEE SERVICES (0.07)
EGGEMEYER LAND CLEARING, LLC (3.75)
Contract #01183206
Totals8925015.091066998.731066998.7311.9

CountyJIM WELLS
HighwayUS 281
From0.8 MI S OF FM 1554
ToCONTROL BREAK (.1 MI SO OF CR468)
CSJ0254-07-009
Proj IDNH 2017(816)
Work TypeGRADE,SURF
 
3.9654711384.925160166.5899.9
CountyJIM WELLS
HighwayUS 281
FromAPPROX .1 MI S OF CR 468
ToFM 2508
CSJ0255-01-083
Proj IDNH 2017(816)
Work TypeGRADE,SURF
 
1.9411722420.781604161.1893.1
Work Order04-24-17
Work Began06-19-17
Work Completed
Time Computed05-01-17
Contract Working Days160
Addl Days Granted10
Working Days Charged132
Percent Time Used77
Contractor(s)
ANDERSON COLUMBIA CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0254-07-009
SOIL-TECH, INC. (0.21)
D&S TEXAS ICON CONSTRUCTION (0.49)
HIGHWAY BARRICADES AND SERVICES, LLC (1.89)
WEST TX RUMBLE STRIP (0.15)
FLASHER EQUIPMENT COMPANY (1.75)
PRIMATE CONSTRUCTION, INC. (0.12)
CLARK CONSTRUCTION OF TEXAS, INC. (5.13)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.67)
AREA WIDE PROTECTIVE, INC. (0.50)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (0.02)
Contract #03173225
Totals6433805.70188249.336764327.7699.9

CountyKARNES
HighwaySH 72
FromW. MAIN ST.
ToWILBERN ST.
CSJ0270-03-074
Proj IDSTP 2017(305)
Work TypeGRADE,BASE, SURF, RESTRIPE ROADWAY
 
0.7082144915.351409212.6765.7
CountyKARNES
HighwayFM 81
FromFM 2773
ToFM 885
CSJ0691-01-034
Proj IDSTP 2017(305)
Work TypeGRADE,BASE, SURF, RESTRIPE ROADWAY
 
1.1523041471.691398537.9545.9
Work Order02-22-17
Work Began07-10-17
Work Completed
Time Computed03-01-17
Contract Working Days232
Addl Days Granted48
Working Days Charged140
Percent Time Used50
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0270-03-074
FLASHER EQUIPMENT COMPANY (1.88)
HIGHWAY BARRICADES AND SERVICES, LLC (1.41)
THE LEVY COMPANY, L.P. (0.43)
LONE STAR EROSION CONTROL (1.30)
DELGADOS CONSTRUCTION, DBA ERNESTO A. DELGADO (7.59)
Contract #01173022
Totals5186387.04312297.222807750.6254.1

CountyNUECES
HighwaySH 286
FromSH 357
To1 MI S OF FM 43
CSJ0326-01-052
Proj IDNH 2013(795)
Work TypeGRADE,BASE,SURF,STRS
 
2.75545818725.5246849592.6799.9
Work Order09-05-13
Work Began03-05-14
Work Completed
Time Computed08-01-13
Contract Working Days687
Addl Days Granted128
Working Days Charged815
Percent Time Used100
Contractor(s)
HAAS-ANDERSON CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0326-01-052
LARGE & SONS_FOUNDATION DRILLING,INC. (0.20)
MURRAY CONSTRUCTION (0.20)
SOIL-TECH, INC. (0.35)
MASTERPIECE GRINDING & GROOVING, LLC (0.07)
WEBBER-BALKE FOUNDATION COMPANY, INC. (1.72)
TEXAS BOMANITE (0.21)
TERRY L. ELLIS BACKHOE (0.05)
TROUT TRUCKING_COMPANY INC. (2.72)
HIGHWAY BARRICADES AND SERVICES, LLC (0.70)
JHABORES CONSTRUCTION CO, INC. (2.92)
CROSSROADS MILLING, LLC (0.24)
CABCOS CONTRACTORS LLC (5.62)
AARON CONCRETE CONTRACTORS, L.P. (1.86)
STAR OPERATIONS, INC. (2.06)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (0.65)
MCL CONTRACTING, LLC (0.49)
HAYWARD BAKER, INC. (0.15)
PERFORMANCE EQUIPMENT SERVICE (0.30)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.09)
Contract #06133001
Totals45818725.52242428.4046849592.6799.9

CountyZERO COUNTIES
Highway
From
To
CSJ0326-01-060
Proj ID
Work Type
 
0.00417170.580.0
CountyNUECES
HighwayFM 2444
FromSH 286
ToOSO PARKWAY INTERSECTION
CSJ2343-01-036
Proj IDSTP 2013(936)MM
Work TypeGRADE, BASE, SURF,STRTS
 
4.05124447530.9720829306.9585.2
Work Order11-13-13
Work Began05-31-16
Work Completed
Time Computed05-12-14
Contract Working Days510
Addl Days Granted1
Working Days Charged415
Percent Time Used81
Contractor(s)
BAY LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0326-01-060
AARON CONCRETE CONTRACTORS, L.P. (0.33)
MURRAY CONSTRUCTION (0.19)
SOIL-TECH, INC. (0.10)
PRIMATE CONSTRUCTION, INC. (0.08)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. (0.57)
STAR OPERATIONS, INC. (1.08)
HIGHWAY BARRICADES AND SERVICES, LLC (1.10)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (1.95)
PENNTEX MILLING, LLC (0.30)
WOODSTOCK TREE SURGEONS (0.06)
SHINN & GREGORY, INC. (1.91)
GALBRAITH CONTRACTING, INC. (0.01)
ROADWAY SPECIALTIES, INC. (0.56)
K.L. DURHAM CONSTRUCTION, LLC (0.33)
ADVANCED PUMPING, LLC (0.25)
D & C CONCRETE CUTTING, INC. (0.01)
ACME READY MIX LTD., LLP (0.38)
DELTA PRIME SPECIALTY SERVICES, INC. (0.02)
CABCOS CONTRACTORS LLC (0.25)
V.C. HUFF, L.L.C. (0.80)
BRADCO (2.63)
FOUR-B PAVING, INC. (0.06)
Contract #08133005
Totals24447530.971188493.4021246477.5386.9

CountyLIVE OAK
HighwayFM 99
FromIH 37
ToALT US 281
CSJ0348-11-015
Proj IDSTP 1702(339)
Work TypeREHAB AND WIDEN
 
2.4002680558.962817792.3399.9
Work Order07-20-17
Work Began08-10-17
Work Completed
Time Computed08-01-17
Contract Working Days102
Addl Days Granted0
Working Days Charged123
Percent Time Used120
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0348-11-015
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (1.79)
DIAMOND SURFACE, INC. (0.37)
FLASHER EQUIPMENT COMPANY (0.42)
HIGHWAY BARRICADES AND SERVICES, LLC (0.96)
THE LEVY COMPANY, L.P. (0.33)
ROADWAY SPECIALTIES, INC. (1.00)
Contract #06173219
Totals2680558.96340218.502817792.3399.9

CountyKARNES
HighwaySH 123
FromSH 80
ToWILSON COUNTY LINE
CSJ0366-06-042
Proj IDNH 2017(043)
Work TypeREHAB ROADWAY
 
12.59519912126.659752165.0448.9
Work Order11-01-16
Work Began11-28-16
Work Completed
Time Computed12-01-16
Contract Working Days400
Addl Days Granted48
Working Days Charged252
Percent Time Used56
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0366-06-042
(USE 06621)D. I. J. CONSTRUCTION, INC. (1.71)
FLASHER EQUIPMENT COMPANY (0.07)
EGGEMEYER LAND CLEARING, LLC (0.70)
IVY ROSALVA CRUZ DBA IVY"S TRUCKING (1.07)
THE LEVY COMPANY, L.P. (0.05)
ROADWAY SPECIALTIES, INC. (1.93)
Contract #09163205
Totals19912126.651496777.219752165.0448.9

page 1 | page 2 | page 3