Letting Schedule for August, 2020 County (FY 2020)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
August, 2020 (FY 2020) | (see Links) |
SEP 2019 | OCT 2019 | NOV 2019 | DEC 2019 | JAN 2020 | FEB 2020 | MAR 2020 | APR 2020 | MAY 2020 | JUN 2020 | JUL 2020 | AUG 2020 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0911-00-107 | Angelina/ Lufkin | VA | Actual | $3,770,973 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0180-04-136 | Aransas/ Corpus Christi | BS 35-L | Actual | $27,920 | 10 | EMERGENCY RELIEF | 0.0 |
0507-04-045 | Aransas/ Corpus Christi | FM 1069 | Actual | $1,470,799 | 8 | HAZARD ELIMINATION & SAFETY | 7.0 |
0137-07-025 | Archer/ Wichita Falls | SH 25 | Actual | $655,793 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0716-01-047 | Austin/ Yoakum | FM 109 | Actual | $10,524,197 | 1 | ADDING SHOULDERS WITH NO ADDED CAPACITY | 0.0 |
0855-04-032 | Bandera/ San Antonio | RM 337 | Actual | $1,499,096 | 1 | BRIDGE REPLACEMENT | 4.0 |
0909-36-163 | Bell/ Waco | VA | Approved | $1,955,210 | 3 | HIKE AND/OR BIKE | 0.0 |
0915-12-657 | Bexar/ San Antonio | CR | Actual | $3,840,003 | 3 | HAZARD ELIMINATION & SAFETY | 7.5 |
0258-04-036 | Bosque/ Waco | SH 6 | Actual | $241,401 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
2050-01-025 | Bowie/ Atlanta | FM 2148 | Actual | $217,525 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
0010-12-073 | Bowie/ Atlanta | US 67 | Actual | $506,593 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0179-02-087 | Brazoria/ Houston | SH 35 | Actual | $12,602,399 | 1 | SURFACING/ROADWAY RESTORATION | 5.5 |
0858-03-019 | Burleson/ Bryan | FM 908 | Actual | $3,269,568 | 8 | HAZARD ELIMINATION & SAFETY | 5.0 |
0252-02-060 | Burnet/ Austin | US 281 | Actual | $5,145,702 | 1 | HIGHWAY IMPROVEMENT | 2.5 |
3006-01-007 | Caldwell/ Austin | FM 2984 | Actual | $2,740,609 | 1 | REHABILITATE EXISTING ROADWAY | 7.5 |
0144-04-046 | Calhoun/ Yoakum | SH 238 | Actual | $3,372,570 | 10 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 2.0 |
0181-02-032 | Callahan/ Abilene | SH 36 | Actual | $1,441,061 | 8 | CONSTRUCT NEW ROADWAY LANES | 0.0 |
0006-07-085 | Callahan/ Abilene | IH 20 | Actual | $4,421,987 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
1140-02-038 | Cameron/ Pharr | FM 802 | Actual | $6,181,411 | 2M | WIDEN ROAD - ADD LANES | 7.5 |
0039-07-256 | Cameron/ Pharr | IH 69E | Actual | $6,314,122 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 8.0 |
0039-12-261 | Cameron/ Pharr | BU 77-X | Actual | $598,196 | 6 | BRIDGE MAINTENANCE | 3.0 |
0921-06-310 | Cameron/ Pharr | CS | Actual | $250,000 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
0218-04-121 | Cass/ Atlanta | US 59 | Actual | $2,189,321 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0389-02-052 | Chambers/ Beaumont | SH 146 | Actual | $1,150,647 | 8 | HAZARD ELIMINATION & SAFETY | 6.5 |
1024-01-042 | Chambers/ Beaumont | FM 565 | Actual | $5,142,079 | 1 | CONSTRUCT FRONTAGE ROADS | 6.5 |
0925-00-083 | Childress/ Childress | VA | Actual | $2,146,151 | 8 | REPLACE GUARDRAIL | 0.0 |
0918-24-241 | Collin/ Dallas | VA | Actual | $444,730 | 3 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 0.0 |
0044-08-072 | Cooke/ Wichita Falls | US 82 | Actual | $295,963 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0312-01-082 | Cooke/ Wichita Falls | FM 51 | Actual | $1,259,784 | 1 | HAZARD ELIMINATION & SAFETY | 5.0 |
0924-08-006 | Culberson/ El Paso | CR | Actual | $250,000 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
0918-00-316 | Dallas/ Dallas | VA | Actual | $1,456,000 | 3 | TRANSPORTATION NON-ROADWAY | 0.0 |
0918-00-296 | Dallas/ Dallas | VA | Actual | $1,088,000 | 3 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0918-00-356 | Dallas/ Dallas | VA | Actual | $4,997,413 | 1 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0269-06-059 | Dewitt/ Yoakum | US 183 | Actual | $4,378,216 | 11 | WIDEN ROAD - ADD LANES | 0.0 |
0924-06-421 | El Paso/ El Paso | CS | Approved | $1,752,015 | 3 | BRIDGE REPLACEMENT | 7.0 |
0924-06-422 | El Paso/ El Paso | CS | Approved | $1,898,899 | 3 | BRIDGE REPLACEMENT | 0.0 |
0924-06-425 | El Paso/ El Paso | CS | Approved | $984,989 | 3 | BRIDGE REPLACEMENT | 0.0 |
0001-02-069 | El Paso/ El Paso | SH 20 | Actual | $1,692,784 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0924-06-419 | El Paso/ El Paso | CS | Approved | $443,208 | 3 | BRIDGE REPLACEMENT | 0.0 |
1990-01-020 | Erath/ Ft Worth | FM 205 | Actual | $11,463,174 | 11 | HAZARD ELIMINATION & SAFETY | 8.5 |
0912-34-200 | Fort Bend/ Houston | CR | Approved | $1,025,528 | 3 | EMERGENCY RELIEF | 0.0 |
0027-12-154 | Fort Bend/ Houston | IH 69 | Actual | $62,272 | 10 | EMERGENCY RELIEF | 0.0 |
0027-12-155 | Fort Bend/ Houston | IH 69 | Actual | $18,658 | 10 | EMERGENCY RELIEF | 0.0 |
0543-03-077 | Fort Bend/ Houston | FM 762 | Actual | $497,511 | 10 | EMERGENCY RELIEF | 0.0 |
0192-01-099 | Fort Bend/ Houston | SH 6 | Actual | $4,006,350 | 5 | ADVANCED TRAFFIC MANAGEMENT SYSTEM | 0.0 |
0912-73-202 | Galveston/ Houston | VA | Actual | $358,023 | 3 | HIKE AND/OR BIKE | 0.0 |
0500-04-103 | Galveston/ Houston | IH 45 | Actual | $236,510,781 | 1 | WIDEN ROAD - ADD LANES | 0.0 |
0192-04-107 | Galveston/ Houston | SH 6 | Actual | $18,066 | 10 | EMERGENCY RELIEF | 0.0 |
0192-04-108 | Galveston/ Houston | SH 6 | Actual | $11,000 | 10 | EMERGENCY RELIEF | 0.0 |
0500-01-107 | Galveston/ Houston | IH 45 | Actual | $122,641,386 | 1 | WIDEN ROAD - ADD LANES | 11.0 |
0359-02-005 | Goliad/ Corpus Christi | SH 119 | Actual | $12,356,350 | 11 | WIDEN ROAD - ADD LANES | 0.0 |
0045-02-039 | Grayson/ Paris | SH 56 | Actual | $2,208,704 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0081-10-048 | Grayson/ Paris | US 377 | Actual | $1,727,392 | 8 | HAZARD ELIMINATION & SAFETY | 5.0 |
2073-01-010 | Gregg/ Tyler | FM 2206 | Actual | $14,156,750 | 1 | WIDEN ROAD - ADD LANES | 4.5 |
0910-07-081 | Gregg/ Tyler | VA | Actual | $437,735 | 8 | REPLACE GUARDRAIL | 0.0 |
0915-46-046 | Guadalupe/ San Antonio | VA | Approved | $2,801,246 | 3 | HIKE AND/OR BIKE | 0.0 |
0065-05-152 | Hardin/ Beaumont | US 96 | Actual | $438,242 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0200-10-086 | Hardin/ Beaumont | US 69 | Actual | $170,091 | 10 | EMERGENCY RELIEF | 0.0 |
3256-03-100 | Harris/ Houston | SL 8 | Actual | $160,576 | 10 | EMERGENCY RELIEF | 0.0 |
3256-01-117 | Harris/ Houston | SL 8 | Actual | $156,850 | 10 | EMERGENCY RELIEF | 0.0 |
0027-09-108 | Harris/ Houston | US 90A | Actual | $18,536 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-593 | Harris/ Houston | VA | Actual | $30,000,000 | 5 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0027-09-106 | Harris/ Houston | UA 90 | Actual | $18,536 | 10 | EMERGENCY RELIEF | 0.0 |
0177-06-088 | Harris/ Houston | IH 69 | Actual | $86,243 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-595 | Harris/ Houston | CS | Actual | $3,516,505 | 3 | FERRY OPERATION PROJECTS | 0.0 |
1685-03-102 | Harris/ Houston | FM 1960 | Actual | $11,000 | 10 | EMERGENCY RELIEF | 0.0 |
1685-02-051 | Harris/ Houston | FM 1960 | Actual | $18,066 | 10 | EMERGENCY RELIEF | 0.0 |
0028-01-104 | Harris/ Houston | BU 90-U | Actual | $18,066 | 10 | EMERGENCY RELIEF | 0.0 |
1685-05-129 | Harris/ Houston | SH 6 | Actual | $18,065 | 10 | EMERGENCY RELIEF | 0.0 |
3256-01-116 | Harris/ Houston | SL 8 | Actual | $147,262 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-562 | Harris/ Houston | CS | Actual | $37,800 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-563 | Harris/ Houston | CS | Actual | $33,705 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-546 | Harris/ Houston | TL | Actual | $57,379 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-617 | Harris/ Houston | VA | Actual | $4,504,864 | 5 | TRANSIT | 0.0 |
0912-00-619 | Harris/ Houston | VA | Actual | $2,413,069 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0720-03-145 | Harris/ Houston | SH 249 | Actual | $18,521 | 10 | EMERGENCY RELIEF | 0.0 |
0912-00-621 | Harris/ Houston | VA | Actual | $1,365,814 | 8 | HAZARD ELIMINATION & SAFETY | 5.0 |
0912-72-392 | Harris/ Houston | CS | Actual | $5,144,000 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0912-72-452 | Harris/ Houston | CR | Tentative | $17,252 | 10 | EMERGENCY RELIEF | 0.0 |
0912-70-157 | Harris/ Houston | CS | Actual | $18,536 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-540 | Harris/ Houston | CR | Tentative | $1,714,387 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-544 | Harris/ Houston | TL | Actual | $27,622 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-545 | Harris/ Houston | CS | Actual | $106,719 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-537 | Harris/ Houston | TL | Actual | $745,572 | 10 | EMERGENCY RELIEF | 0.0 |
0912-72-538 | Harris/ Houston | TL | Actual | $1,010,703 | 10 | EMERGENCY RELIEF | 0.0 |
0500-03-637 | Harris/ Houston | IH 45 | Actual | $1,685,149 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0569-04-020 | Harrison/ Atlanta | SH 43 | Actual | $2,433,484 | 6 | WIDEN BRIDGE | 3.0 |
0914-33-075 | Hays/ Austin | CS | Approved | $2,000,001 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0910-34-032 | Henderson/ Tyler | VA | Actual | $1,447,717 | 8 | REPLACE GUARDRAIL | 0.0 |
0860-01-020 | Hidalgo/ Pharr | FM 490 | Actual | $1,445,951 | 8 | INSTALL/UPGRADE ROADWAY LIGHTING | 0.0 |
0921-02-402 | Hidalgo/ Pharr | CS | Actual | $250,000 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
1428-01-029 | Hidalgo/ Pharr | FM 1425 | Actual | $250,000 | 8 | RAILROAD CROSSING IMPROVEMENTS | 0.0 |
1804-01-078 | Hidalgo/ Pharr | SS 115 | Actual | $290,764 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0014-07-105 | Hill/ Waco | IH 35 | Actual | $4,444,499 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0130-03-026 | Hockley/ Lubbock | SH 114 | Actual | $1,496,584 | 8 | HAZARD ELIMINATION & SAFETY | 3.5 |
0400-02-055 | Hopkins/ Paris | SH 154 | Actual | $105,929 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0911-00-105 | Houston/ Lufkin | VA | Actual | $3,025,383 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0957-01-019 | Hudspeth/ El Paso | FM 192 | Actual | $582,867 | 6 | BRIDGE REPLACEMENT | 4.0 |
0009-06-053 | Hunt/ Paris | SH 66 | Actual | $513,093 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0791-06-011 | Hutchinson/ Amarillo | RM 687 | Actual | $2,524,688 | 8 | REPLACE GUARDRAIL | 7.0 |
0920-12-046 | Jasper/ Beaumont | CS | Actual | $380,500 | 10 | EMERGENCY RELIEF | 0.0 |
0920-12-045 | Jasper/ Beaumont | CS | Actual | $6,637 | 10 | EMERGENCY RELIEF | 0.0 |
0200-14-089 | Jefferson/ Beaumont | US 69 | Actual | $2,911,383 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0200-14-097 | Jefferson/ Beaumont | US 69 | Actual | $2,111,801 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0920-38-271 | Jefferson/ Beaumont | CS | Actual | $224,619 | 10 | EMERGENCY RELIEF | 0.0 |
0920-38-264 | Jefferson/ Beaumont | CR | Actual | $70,653 | 10 | EMERGENCY RELIEF | 0.0 |
0517-06-036 | Jim Hogg/ Pharr | SH 16 | Actual | $5,588,168 | 8 | REPLACE GUARDRAIL | 0.0 |
0902-50-125 | Johnson/ Ft Worth | VA | Actual | $2,151,274 | 3 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 0.0 |
0359-04-005 | Karnes/ Corpus Christi | SH 119 | Actual | $25,746,114 | 11 | WIDEN ROAD - ADD LANES | 0.0 |
0918-11-099 | Kaufman/ Dallas | VA | Actual | $667,975 | 3 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 0.0 |
0141-09-071 | Kimble/ San Angelo | IH 10 | Actual | $2,484,820 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0269-04-039 | Lavaca/ Yoakum | UA 77 | Actual | $955,597 | 8 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | 3.0 |
0920-02-091 | Liberty/ Beaumont | CR | Actual | $750,219 | 6 | BRIDGE REPLACEMENT | 5.0 |
0117-05-057 | Madison/ Bryan | SH 21 | Actual | $2,502,685 | 8 | REPLACE GUARDRAIL | 0.0 |
1229-04-015 | Maverick/ Laredo | FM 375 | Actual | $3,473,239 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0128-03-037 | Mcculloch/ Brownwood | US 377 | Actual | $679,881 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0162-01-098 | Mclennan/ Waco | SH 31 | Actual | $3,874,162 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0049-01-099 | Mclennan/ Waco | SH 6 | Actual | $9,043,757 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0014-08-088 | Mclennan/ Waco | IH 35 | Actual | $379,257 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0177-05-119 | Montgomery/ Houston | IH 69 | Actual | $92,143 | 10 | EMERGENCY RELIEF | 0.0 |
1407-01-025 | Nacogdoches/ Lufkin | FM 1275 | Actual | $6,942,023 | 8 | WIDEN ROAD - ADD SHOULDERS | 4.5 |
0006-02-125 | Nolan/ Abilene | IH 20 | Actual | $5,322,695 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0916-00-090 | Nueces/ Corpus Christi | VA | Actual | $3,209,206 | 1 | HIGHWAY IMPROVEMENT | 0.0 |
0028-15-056 | Orange/ Beaumont | SH 87 | Actual | $563,696 | 8 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0902-39-038 | Palo Pinto/ Ft Worth | VA | Actual | $2,779,915 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0904-00-192 | Potter/ Amarillo | VA | Actual | $1,066,195 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0379-02-032 | Potter/ Amarillo | SH 136 | Actual | $8,577,015 | 8 | REHABILITATE EXISTING ROADWAY | 3.5 |
0045-12-087 | Red River/ Paris | US 82 | Actual | $2,659,097 | 1 | HAZARD ELIMINATION & SAFETY | 4.0 |
0049-06-081 | Robertson/ Bryan | SH 6 | Actual | $7,011,827 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0918-25-025 | Rockwall/ Dallas | CS | Actual | $475,286 | 3 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 0.0 |
0180-06-123 | San Patricio/ Corpus Christi | BS 35-L | Actual | $169,037 | 10 | EMERGENCY RELIEF | 0.0 |
0910-16-152 | Smith/ Tyler | VA | Actual | $893,749 | 8 | REPLACE GUARDRAIL | 0.0 |
0927-01-030 | Smith/ Tyler | FM 344 | Actual | $2,068,568 | 8 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S) | 3.5 |
0927-01-031 | Smith/ Tyler | FM 344 | Actual | $166,672 | 1 | HAZARD ELIMINATION & SAFETY | 0.0 |
0902-00-274 | Somervell/ Ft Worth | VA | Actual | $1,000,000 | 7 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0780-01-017 | Somervell/ Ft Worth | FM 51 | Actual | $2,982,697 | 8 | HAZARD ELIMINATION & SAFETY | 5.0 |
0902-90-104 | Tarrant/ Ft Worth | VA | Actual | $1,999,731 | 1 | INSTALL ILLUMINATION | 0.0 |
0902-90-124 | Tarrant/ Ft Worth | VA | Actual | $3,500,000 | 7 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
2079-01-042 | Tarrant/ Ft Worth | FM 1220 | Actual | $2,640,905 | 8 | RECONSTRUCT EXISTING ROADWAY | 7.5 |
0902-90-076 | Tarrant/ Ft Worth | VA | Actual | $421,932 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0902-90-080 | Tarrant/ Ft Worth | VA | Approved | $263,921 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0902-90-081 | Tarrant/ Ft Worth | VA | Approved | $2,096,401 | 3 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | 7.0 |
0902-48-892 | Tarrant/ Ft Worth | CR | Actual | $747,159 | 6 | BRIDGE REPLACEMENT | 5.0 |
0902-00-162 | Tarrant/ Ft Worth | VA | Actual | $3,687,155 | 1 | REPAIR ROADWAY | 0.0 |
0902-48-850 | Tarrant/ Ft Worth | CR | Actual | $733,096 | 6 | BRIDGE REPLACEMENT | 5.0 |
0034-01-127 | Taylor/ Abilene | US 83 | Actual | $3,894,343 | 1 | CONSTRUCT FRONTAGE ROADS | 6.5 |
1655-01-032 | Taylor/ Abilene | FM 1750 | Actual | $436,124 | 8 | INSTALL FLASHING BEACON | 0.0 |
0908-33-099 | Taylor/ Abilene | VA | Actual | $876,747 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0907-00-225 | Tom Green/ San Angelo | VA | Actual | $2,277,883 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0907-00-224 | Tom Green/ San Angelo | VA | Actual | $3,255,282 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0907-00-201 | Tom Green/ San Angelo | VA | Actual | $4,359,165 | 10 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0113-08-060 | Travis/ Austin | US 290 | Actual | $547,907,097 | 1 | CONSTRUCT NEW ROADWAY LANES | 0.0 |
3417-03-030 | Travis/ Austin | FM 734 | Actual | $417,699 | 8 | TRAFFIC SIGNAL IMPROVEMENTS | 0.0 |
0914-00-453 | Travis/ Austin | VA | Actual | $2,146,953 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0914-00-452 | Travis/ Austin | VA | Actual | $4,462,196 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0914-00-450 | Travis/ Austin | VA | Actual | $4,368,577 | 8 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0914-00-451 | Travis/ Austin | VA | Actual | $357,844 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0912-56-058 | Waller/ Houston | CR | Actual | $504,944 | 6 | BRIDGE REPLACEMENT | 4.0 |
0114-09-077 | Washington/ Bryan | BU 290F | Actual | $2,691,639 | 1 | PREVENTIVE MAINTENANCE | 5.5 |
0922-00-066 | Webb/ Laredo | VA | Actual | $2,790,115 | 11 | REMOVE/REPLACE BRIDGE RAIL | 4.5 |
0086-14-084 | Webb/ Laredo | IH 69W | Actual | $13,361,330 | 11 | WIDEN ROAD - ADD LANES | 0.0 |
0913-09-092 | Wharton/ Yoakum | CR | Actual | $1,395,282 | 6 | BRIDGE REPLACEMENT | 3.0 |
0514-04-014 | Wichita/ Wichita Falls | FM 1177 | Actual | $1,887,194 | 8 | HAZARD ELIMINATION & SAFETY | 5.5 |
0337-01-043 | Williamson/ Austin | SH 29 | Actual | $5,536,145 | 1 | HIGHWAY IMPROVEMENT | 7.0 |
0440-02-022 | Williamson/ Austin | SH 195 | Actual | $903,389 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0479-04-050 | Winkler/ Odessa | SH 302 | Actual | $48,971,163 | 11 | CONSTRUCT BRIDGE | 8.5 |
0910-35-036 | Wood/ Tyler | CS | Actual | $322,802 | 3 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | 0.0 |
0910-35-038 | Wood/ Tyler | VA | Actual | $782,275 | 8 | REPLACE GUARDRAIL | 0.0 |
0134-01-025 | Young/ Wichita Falls | SH 251 | Actual | $2,378,351 | 8 | HAZARD ELIMINATION & SAFETY | 6.0 |
|