Detail Letting Schedule for Hidalgo County (FY 2019)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Hidalgo County (FY 2019) |
CCSJ: 0039-02-068 |
|||
District: | PHARR | Let Date: | Dec 2018 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-02-068 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | TOM GILL RD. | Fund Cat: | 8 |
Limits To: | FM 1427 | ESTIMATE: | $109,227 |
Length: | 0.3 | Actual | $110,994 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-03-104 |
Description: | IMPROVE TRAFFIC SIGNAL, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | IH-2 | Fund Cat: | 8 |
Limits To: | FM 494 | ESTIMATE: | $797,971 |
Length: | 4.0 | Actual | $752,537 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-03-105 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | FM 2061/FM 3362 | Fund Cat: | 8 |
Limits To: | SUGAR RD. | ESTIMATE: | $183,607 |
Length: | 0.5 | Actual | $173,671 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-04-126 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | FM 1423 (VAL VERDE RD) | Fund Cat: | 8 |
Limits To: | 1ST ST. | ESTIMATE: | $359,799 |
Length: | 1.3 | Actual | $346,318 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-04-127 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | MIDWAY RD. | Fund Cat: | 8 |
Limits To: | FM 1015 | ESTIMATE: | $595,773 |
Length: | 4.0 | Actual | $552,131 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | IH 69E | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-07-251 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ FM 2994 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $111,939 |
Length: | 0.2 | Actual | $75,397 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | IH 69E | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-07-255 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ STATE SPUR 206 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $145,880 |
Length: | 0.2 | Actual | $112,457 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-17-193 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | FM 1427 | Fund Cat: | 8 |
Limits To: | BUS 83 | ESTIMATE: | $74,867 |
Length: | 0.5 | Actual | $68,015 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 77-X | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0327-08-095 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ STATE SPUR 206 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $107,628 |
Length: | 0.2 | Actual | $111,101 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 77-X | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0327-08-096 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ COMMERCE ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $55,936 |
Length: | 0.3 | Actual | $32,261 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | FM 493 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0863-01-067 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ BUS 83 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $82,452 |
Length: | 0.2 | Actual | $78,310 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(276) | CSJ: | 0921-02-410 |
Description: | TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | WITHIN HIDALGO COUNTY | ESTIMATE: | $2,857,638 |
Length: | 0.1 | Actual | $2,394,898 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | FM 106 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 1425-03-062 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ SL 499 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $58,066 |
Length: | 0.2 | Actual | $62,714 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | FM 1924 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 1802-01-042 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | FM 492 | Fund Cat: | 8 |
Limits To: | FM 494 | ESTIMATE: | $1,224,580 |
Length: | 6.4 | Actual | $1,159,177 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | FM 2061 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 1939-02-038 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ EL RANCHO RD./HALL ACRES RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $64,150 |
Length: | 0.2 | Actual | $66,146 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0039-02-068 | ||
---|---|---|---|
Length: | 18.6 | ||
Estimate: | $6,829,510 | ||
Actual: | $6,096,123 | ||
CCSJ: 0039-02-070 |
|||
District: | PHARR | Let Date: | Apr 2019 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | NH 2019(954) | CSJ: | 0039-02-070 |
Description: | REHABILITATE ROADWAY | Handling Code: | |
Limits From: | 2.164 MILES WEST OF FM 2221 | Fund Cat: | 1 |
Limits To: | FM 2221 | ESTIMATE: | $7,709,934 |
Length: | 2.2 | Actual | $7,504,997 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0039-02-070 | ||
Length: | 2.2 | ||
Estimate: | $7,709,934 | ||
Actual: | $7,504,997 | ||
CCSJ: 0039-02-072 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 1902(312)HES | CSJ: | 0039-02-072 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | TABASCO RD. | Fund Cat: | 11 |
Limits To: | FM 1427 | ESTIMATE: | $424,706 |
Length: | 1.5 | Actual | $526,590 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | IH 69C | Let Status: | Actual |
Project ID: | STP 1902(312)HES | CSJ: | 0255-07-143 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | BUS 281 W | Fund Cat: | 11 |
Limits To: | FM 2812 | ESTIMATE: | $741,339 |
Length: | 2.8 | Actual | $881,462 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 1902(312)HES | CSJ: | 0342-01-094 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 493 | Fund Cat: | 11 |
Limits To: | MILE 6 W. RD. | ESTIMATE: | $307,559 |
Length: | 0.0 | Actual | $390,176 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 1902(312)HES | CSJ: | 0528-01-122 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.4 MI SOUTH OF FM 676 | Fund Cat: | 11 |
Limits To: | 0.28 MI NORHT OF FM 1924 | ESTIMATE: | $297,738 |
Length: | 1.3 | Actual | $379,601 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0039-02-072 | ||
Length: | 5.6 | ||
Estimate: | $1,771,341 | ||
Actual: | $2,177,829 | ||
CCSJ: 0039-14-011 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | FM 886 | Let Status: | Actual |
Project ID: | CRX 39-14-11 | CSJ: | 0039-14-011 |
Description: | RAILROAD CROSSING IMPROVEMENTS | Handling Code: | XX |
Limits From: | FM 886, DOT #: 447839C | Fund Cat: | 10 |
Limits To: | NORTH OF LOS EBANOS | ESTIMATE: | $81,000 |
Length: | 0.0 | Actual | $81,000 |
Back... | Totals for 0039-14-011 | ||
Length: | 0 | ||
Estimate: | $81,000 | ||
Actual: | $81,000 | ||
CCSJ: 0039-17-175 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 1902(417) | CSJ: | 0039-17-175 |
Description: | INTERCHANGE IMPROVEMENT (NEW OR UPDATE) | Handling Code: | DB |
Limits From: | FM 2557 (STEWART RD.) | Fund Cat: | 11 |
Limits To: | 2ND STREET | ESTIMATE: | 208,348,966 |
Length: | 5.5 | Actual | 231,624,793 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | IH 69C | Let Status: | Actual |
Project ID: | NH 1902(417) | CSJ: | 0255-08-107 |
Description: | INTERCHANGE IMPROVEMENT (NEW OR UPDATE) | Handling Code: | DB |
Limits From: | IH-2 | Fund Cat: | 1 |
Limits To: | 1.82 MILES NORTH OF IH-2 | ESTIMATE: | $64,366,907 |
Length: | 1.8 | Actual | $71,557,695 |
Back... | Totals for 0039-17-175 | ||
Length: | 7.3 | ||
Estimate: | $272,715,873 | ||
Actual: | $303,182,488 | ||
CCSJ: 0039-17-201 |
|||
District: | PHARR | Let Date: | Feb 2019 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 2019(694) | CSJ: | 0039-17-201 |
Description: | PAVEMENT REHABILITATION_(FRONTAGE RDS.) | Handling Code: | |
Limits From: | 0.4 MI EAST OF SH 336 | Fund Cat: | 1 |
Limits To: | 0.2 MI EAST OF FM 2557 | ESTIMATE: | $1,478,385 |
Length: | 6.0 | Actual | $1,809,686 |
District: | PHARR | Let Date: | Feb 2019 |
Highway: | IH 69C | Let Status: | Actual |
Project ID: | NH 2019(694) | CSJ: | 0255-08-109 |
Description: | PAVEMENT REHABILITATION (FRONTAGE RDS.) | Handling Code: | |
Limits From: | IH-2 | Fund Cat: | 1 |
Limits To: | 0.5 MI SOUTH OF SH 107 | ESTIMATE: | $909,983 |
Length: | 6.4 | Actual | $1,157,092 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0039-17-201 | ||
Length: | 12.4 | ||
Estimate: | $2,388,368 | ||
Actual: | $2,966,778 | ||
CCSJ: 0255-09-094 |
|||
District: | PHARR | Let Date: | Sep 2018 |
Highway: | UP 281 | Let Status: | Actual |
Project ID: | NH 2019(045) | CSJ: | 0255-09-094 |
Description: | REHABILITATE ROADWAY | Handling Code: | |
Limits From: | SH 336 | Fund Cat: | 1 |
Limits To: | SP 600 | ESTIMATE: | $18,509,182 |
Length: | 3.6 | Actual | $22,771,151 |
District: | PHARR | Let Date: | Sep 2018 |
Highway: | SS 600 | Let Status: | Actual |
Project ID: | CC 255-12-6 | CSJ: | 0255-12-006 |
Description: | REHABILITATE ROADWAY | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 3 |
Limits To: | END OF STATE MAINTENANCE | ESTIMATE: | $1,001,008 |
Length: | 0.2 | Actual | $1,211,280 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0255-09-094 | ||
Length: | 3.8 | ||
Estimate: | $19,510,190 | ||
Actual: | $23,982,430 | ||
CCSJ: 0342-01-074 |
|||
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2019(085) | CSJ: | 0342-01-074 |
Description: | CONSTRUCT 6 LANE DIVIDED RURAL | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | EAST OF FM 493 | ESTIMATE: | $20,062,672 |
Length: | 7.1 | Actual | $20,492,320 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2019(084)HES | CSJ: | 0342-01-088 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.7 MI W OF FM 2128 | Fund Cat: | 8 |
Limits To: | 0.4 MI W OF FM 2128 | ESTIMATE: | $296,903 |
Length: | 1.1 | Actual | $321,205 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2019(084)HES | CSJ: | 0342-01-089 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | @ FM 1423 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $126,844 |
Length: | 0.0 | Actual | $121,039 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2019(084)HES | CSJ: | 0342-01-090 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | @ FM 907 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $183,723 |
Length: | 0.0 | Actual | $169,328 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0342-01-074 | ||
Length: | 8.2 | ||
Estimate: | $20,670,142 | ||
Actual: | $21,103,891 | ||
CCSJ: 0342-02-054 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | NH 1902(320) | CSJ: | 0342-02-054 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | WEST LEVEE | Fund Cat: | 1 |
Limits To: | FM 1425 | ESTIMATE: | $11,047,085 |
Length: | 4.6 | Actual | $10,978,593 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0342-02-054 | ||
Length: | 4.6 | ||
Estimate: | $11,047,085 | ||
Actual: | $10,978,593 | ||
CCSJ: 0698-03-095 |
|||
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 88 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0698-03-095 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 0.5 MI N OF MILE 9 N RD. | Fund Cat: | 8 |
Limits To: | MILE 9 N RD. | ESTIMATE: | $190,265 |
Length: | 0.0 | Actual | $183,852 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0038-07-073 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 0.6 MI E OF SUNTEX RD. | Fund Cat: | 8 |
Limits To: | 0.6 MI W OF FM 3167 | ESTIMATE: | $201,023 |
Length: | 0.0 | Actual | $138,906 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0220-04-051 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | MAIN ST./PADILLA ST. | Fund Cat: | 8 |
Limits To: | E. CALLE RANCH GRANDE (W) | ESTIMATE: | $115,701 |
Length: | 0.0 | Actual | $95,788 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0220-04-053 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ J PADILLA ST./MAIN ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $33,148 |
Length: | 0.0 | Actual | $33,012 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0220-04-054 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | SANTOS GOMEZ RD. | Fund Cat: | 8 |
Limits To: | 0.15 MI S OF FM 1732 | ESTIMATE: | $85,161 |
Length: | 0.0 | Actual | $63,202 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 106 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0630-03-025 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ CENTERLINE RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $35,119 |
Length: | 0.0 | Actual | $39,227 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 681 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0669-01-061 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ NUEVO AMANECER DR. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $34,377 |
Length: | 0.0 | Actual | $38,393 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 2221 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0669-03-023 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ IOWA RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $37,731 |
Length: | 0.0 | Actual | $44,327 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 2221 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0669-03-024 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ QUEEN PALM DR. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $34,225 |
Length: | 0.0 | Actual | $36,369 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 88 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0698-02-055 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 0.4 MI N OF MILE 20 N RD. | Fund Cat: | 8 |
Limits To: | 0.4 MI S OF MILE 20 N RD. | ESTIMATE: | $189,405 |
Length: | 0.0 | Actual | $154,246 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 88 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0698-02-056 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 0.4 MILES N OF FM 1925 | Fund Cat: | 8 |
Limits To: | 0.4 MILES S OF FM 1925 | ESTIMATE: | $198,344 |
Length: | 0.0 | Actual | $143,047 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 430 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0818-01-018 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 0.25 MI W OF CR 313 | Fund Cat: | 8 |
Limits To: | 0.25 MI S OF CR 313 | ESTIMATE: | $119,797 |
Length: | 0.0 | Actual | $86,979 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 491 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0861-01-063 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ MILE 8 N RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $33,390 |
Length: | 0.0 | Actual | $38,031 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 493 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0863-01-069 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ MILE 8 1/2 N RD./MILE 9 N RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $31,469 |
Length: | 0.0 | Actual | $32,247 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 494 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0864-01-076 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 0.25 MI N OF EL CAMINO REAL ST. | Fund Cat: | 8 |
Limits To: | EL CAMINO REAL ST. | ESTIMATE: | $73,830 |
Length: | 0.0 | Actual | $59,709 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 510 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1057-03-048 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | FM 3462 | Fund Cat: | 8 |
Limits To: | 0.25 MI E OF FM 3462 | ESTIMATE: | $62,514 |
Length: | 0.0 | Actual | $52,766 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SS 206 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1425-03-064 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ S 21ST ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $32,424 |
Length: | 0.0 | Actual | $34,993 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 1479 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1425-04-024 |
Description: | INSTALL/UPGRADE ROADWAY LIGHTING | Handling Code: | |
Limits From: | 0.1 MI N OF WILLOW RD. | Fund Cat: | 8 |
Limits To: | 0.5 MI N OF JIMENEZ RD. | ESTIMATE: | $164,850 |
Length: | 0.0 | Actual | $128,482 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 1419 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1426-01-053 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ S. DAKOTA AVE. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $33,186 |
Length: | 0.0 | Actual | $37,392 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 1423 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1427-01-039 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ TEX-MEX RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $35,483 |
Length: | 0.0 | Actual | $40,668 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 490 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1430-01-027 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ FM 2845 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $32,733 |
Length: | 0.0 | Actual | $32,619 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 1925 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1803-01-096 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ HOEHN DR. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $32,555 |
Length: | 0.0 | Actual | $32,482 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 3248 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 2717-02-009 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ DANA AVE. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $32,922 |
Length: | 0.0 | Actual | $33,187 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 2812 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 2831-01-013 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | @ BENITO A. RAMIREZ RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $35,785 |
Length: | 0.0 | Actual | $40,664 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0698-03-095 | ||
Length: | 0 | ||
Estimate: | $1,875,432 | ||
Actual: | $1,620,585 | ||
CCSJ: 0864-01-078 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | FM 494 | Let Status: | Actual |
Project ID: | CRX 864-1-78 | CSJ: | 0864-01-078 |
Description: | RAILROAD CROSSING IMPROVEMENTS | Handling Code: | XX |
Limits From: | FM 494, DOT #: 448770M | Fund Cat: | 10 |
Limits To: | IN GRANJENO | ESTIMATE: | $113,400 |
Length: | 0.1 | Actual | $113,400 |
Back... | Totals for 0864-01-078 | ||
Length: | 0.1 | ||
Estimate: | $113,400 | ||
Actual: | $113,400 | ||
CCSJ: 0921-02-311 |
|||
District: | PHARR | Let Date: | Jun 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2016(494)MM | CSJ: | 0921-02-311 |
Description: | WIDEN ROAD - ADD LANES AND SHOULDERS | Handling Code: | LC |
Limits From: | ON NORTH ALAMO ROAD FROM FM 1925 | Fund Cat: | 3 |
Limits To: | 0.54 MILES N. OF FM 1925 | ESTIMATE: | $703,040 |
Length: | 0.5 | Actual | $416,617 |
Back... | Totals for 0921-02-311 | ||
Length: | 0.5 | ||
Estimate: | $703,040 | ||
Actual: | $416,617 | ||
CCSJ: 0921-02-333 |
|||
District: | PHARR | Let Date: | Dec 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | CBI 1702(648) | CSJ: | 0921-02-333 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | LC |
Limits From: | @ DONNA INTERNATIONAL BRIDGE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $9,000,000 |
Length: | 0.1 | Actual | $4,437,506 |
Back... | Totals for 0921-02-333 | ||
Length: | 0.1 | ||
Estimate: | $9,000,000 | ||
Actual: | $4,437,506 | ||
CCSJ: 0921-02-369 |
|||
District: | PHARR | Let Date: | Jul 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | CBI 1802(564) | CSJ: | 0921-02-369 |
Description: | CONSTRUCT NEW ROADWAY LANES | Handling Code: | LC |
Limits From: | ANZALDUAS INTL BRIDGE PORT OF ENTRY | Fund Cat: | 3 |
Limits To: | NORTH BOUND | ESTIMATE: | $2,700,000 |
Length: | 0.1 | Actual | $2,778,396 |
Back... | Totals for 0921-02-369 | ||
Length: | 0.1 | ||
Estimate: | $2,700,000 | ||
Actual: | $2,778,396 | ||
CCSJ: 0921-02-385 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | CBI 2019(320) | CSJ: | 0921-02-385 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | LC |
Limits From: | @ PHARR/REYNOSA INT. BRIDGE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $2,051,534 |
Length: | 0.2 | Actual | $0 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | CBI 2019(277) | CSJ: | 0921-02-383 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | LC |
Limits From: | @ PHARR/REYNOSA INT. BRIDGE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $2,554,962 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 0921-02-385 | ||
Length: | 0.4 | ||
Estimate: | $4,606,496 | ||
Actual: | |||
CCSJ: 0921-02-409 |
|||
District: | PHARR | Let Date: | Dec 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2019(086)TP | CSJ: | 0921-02-409 |
Description: | CONSTRUCT HIKE & BIKE TRAIL(PHASE II) | Handling Code: | LC |
Limits From: | RIDGE RD. | Fund Cat: | 3 |
Limits To: | HALL ACRES RD. | ESTIMATE: | $3,851,122 |
Length: | 2.9 | Actual | $3,409,415 |
Back... | Totals for 0921-02-409 | ||
Length: | 2.9 | ||
Estimate: | $3,851,122 | ||
Actual: | $3,409,415 | ||
CCSJ: 1586-01-076 |
|||
District: | PHARR | Let Date: | May 2019 |
Highway: | FM 907 | Let Status: | Actual |
Project ID: | STP 2019(893) | CSJ: | 1586-01-076 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: | |
Limits From: | BUS 83 | Fund Cat: | 1 |
Limits To: | RANCHO BLANCO RD | ESTIMATE: | $6,207,939 |
Length: | 0.0 | Actual | $6,912,455 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 1586-01-076 | ||
Length: | 0 | ||
Estimate: | $6,207,939 | ||
Actual: | $6,912,455 | ||
CCSJ: 1804-01-079 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SS 115 | Let Status: | Actual |
Project ID: | BR 1902(310) | CSJ: | 1804-01-079 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | ON SS 115NB @ HACKNEY LAKE FLOODWAY | Fund Cat: | 6 |
Limits To: | STR #:_1804-01-006 | ESTIMATE: | $929,539 |
Length: | 0.0 | Actual | $905,746 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SS 115 | Let Status: | Actual |
Project ID: | BR 1902(319) | CSJ: | 1804-01-080 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | ON SS 115SB @ HACKNEY LAKE FLOODWAY | Fund Cat: | 6 |
Limits To: | STR #:_1804-01-007 | ESTIMATE: | $734,151 |
Length: | 0.0 | Actual | $854,961 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1804-01-079 | ||
Length: | 0 | ||
Estimate: | $1,663,690 | ||
Actual: | $1,760,708 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |