Letting Schedule for Houston District (FY 2013)

Last Update: Monday, May 20, 2013
Houston District (FY 2013)
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller

Brazoria County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0111-04-034 FM 521 Actual MAY 2013 $1,639,901 1 PAVEMENT REPAIR, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS
0111-07-038 BS 288B Actual OCT 2012 $6,891,170 6 REPLACE BRIDGE AND APPROACHES
0111-09-041 BS 288B Approved JUL 2013 $424,308 3 RAISED MEDIAN IN ANGLETON
0178-03-145 SH 35 Actual APR 2013 $1,405,314 6 REPLACE BRIDGE AND APPROACHES (NBI# 12020017803025)
0178-03-149 SH 35 Approved JUL 2013 $1,498,558 8 ADD CROSSOVER LEFT TURN LANE
0178-08-014 BS 35-C Actual OCT 2012 $1,535,744 1 ACP OVERLAY AND PAVEMENT MARKINGS
0179-02-083 SH 35 Actual MAR 2013 $4,815,959 1 SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS
0586-01-064 SH 332 Actual JAN 2013 $684,632 1 ACP OVERLAY
0598-04-025 SH 288 Actual OCT 2012 $216,060 1 CONSTRUCT TURNAROUND
0912-31-211 VA Actual APR 2013 $422,144 1 MBGF UPGRADES
0912-31-224 CR Approved AUG 2013 $14,267,175 3 RECONSTRUCT AND WIDEN TO 4 LANES DIVIDED
0912-31-264 CS Actual MAY 2013 $424,008 6 REPLACE BRIDGE (NBI# 12020U00010001)
0912-31-270 CS Approved AUG 2013 $4,471,948 3 CONSTRUCT 4 LANE DIVIDED ROADWAY WITH RAISED MEDIANS
0912-31-274 VA Actual DEC 2012 $3,269,202 3 CONSTRUCTION AND INTEGRATION OF A COMPREHENSIVE INTELLIGENT
1003-01-090 FM 523 Actual DEC 2012 $481,934 1 INSTALL LEFT TURN LANES
1414-03-039 FM 1462 Approved JUL 2013 $402,546 1 INTERSECTION IMPROVEMENTS
1524-01-077 SH 332 Actual MAY 2013 $1,554,440 1 BASE REPAIR, PLANING & 1.5" ACP OVERLAY

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0187-05-050 SP 10 Approved AUG 2013 $21,999,740 3 CONSTRUCT 2 - LANE RURAL FACILITY ON A NEW LOCATION AND REMOVE
0271-05-039 IH 10 Approved JUL 2013 $199,772 10 LANDSCAPE
0912-34-146 CS Actual APR 2013 $4,836,269 3 CONSTRUCT 4 - LANE ROADWAY
0912-34-147 VA Actual MAR 2013 $3,130,219 5 WESTPARK TOLLROAD PARK & RIDE
0912-34-158 CR Approved JUL 2013 $233,803 6 REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0962002)
0912-34-159 CR Approved AUG 2013 $279,000 6 REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0905001)
0912-34-171 VA Actual OCT 2012 $591,980 1 CIPP PIPE LINER AT CROSS CULVERTS
0912-34-178 CS Actual MAY 2013 $3,589,101 3 WIDEN 2 - LANE ROADWAY TO 4 - LANE BOULEVARD WITH CURB & GUTTER
1258-02-033 FM 1093 Actual MAR 2013 $535,317 1 BASE REPAIR & OVERLAY
1258-03-042 FM 1093 Approved AUG 2013 $32,000,000 3 CONSTRUCT 4 TOLL LANES WITH TWO 2 - LANE FRONTAGE ROADS
1258-03-043 FM 1093 Approved AUG 2013 $28,000,000 3 4 TOLL LNS FROM W OF SPRING GREEN TO W OF KATY - GASTON & TWO
1415-02-045 FM 1464 Approved JUL 2013 $517,005 1 CONSTRUCT 1 DETENTION POND
2105-01-046 FM 2234 Approved JUL 2013 $9,436,789 3 RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL
2105-01-047 FM 2234 Actual MAY 2013 $1,659,984 3 SIGNAL SYSTEM UPGRADE AND RECONFIGURATION
3048-01-014 FM 2977 Actual NOV 2012 $1,473,222 1 INSTALL LEFT TURN LANES
3510-04-047 SH 99 Actual OCT 2012 $25,978,009 3 CONSTRUCT OVERPASS AND APPROACHES

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0192-04-103 SH 6 Actual JAN 2013 $2,714,894 1 BASE REPAIR, SEAL COAT AND 1.5" PFC ACP O / L
0912-73-120 CR Approved AUG 2013 $426,000 6 REPLACE BRIDGE
0912-73-141 VA Actual OCT 2012 $2,393,028 3 CONSTRUCTION OF TRANSIT / PEDESTRIAN TRAIL
0976-03-100 FM 518 Approved AUG 2013 $2,410,400 3 ACCESS MANAGEMENT IMPROVEMENTS INCLUDING RAISED MEDIANS,
0978-02-068 FM 646 Actual APR 2013 $847,434 1 BASE REPAIR, PLANNING AND ACP OVERLAY
1607-01-050 FM 1764 Approved JUN 2013 $759,396 3 LANDSCAPE AND PEDESTRIAN IMPROVEMENTS WITH FREEWAY
1911-01-020 FM 2004 Actual JAN 2013 $2,133,995 1 ACP OVERLAY
1911-01-021 FM 2004 Actual NOV 2012 $189,987 1 INSTALL TURN LANES
2523-01-024 FM 2004 Approved AUG 2013 $1,026,796 1 INTERSECTION IMPROVEMENTS

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-09-099 US 90A Approved JUL 2013 $1,009,380 8 INSTALL MEDIAN BARRIER
0027-09-100 US 90A Approved AUG 2013 $1,662,239 8 INSTALL SAFTY LIGHTING
0027-10-069 US 90A Actual APR 2013 $2,433,337 1 RECONSTRUCT INTERSECTION AT IH45, FLEXIBLE PAVEMENT REPAIR,
0027-13-190 US 59 Actual NOV 2012 $18,777,770 1 RECONSTRUCT FRONTAGE ROADS AND INTERSECTIONS
0027-13-202 US 59 Approved JUL 2013 $11,942,348 1 SEAL COAT, CAM LEVEL UP, THIN ASPHALT OVERLAY AND PAVEMENT
0027-13-208 US 59 Approved JUL 2013 $1,076,468 11 RECONSTRUCTION OF NB BRIDGE SLAB
0028-01-095 BU 90-U Actual SEP 2012 $2,893,768 1 BASE REPAIR & ACP OVERLAY
0050-06-081 US 290 Approved AUG 2013 $82,291,166 2M RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE
0050-06-082 US 290 Actual SEP 2012 $7,088,544 5 INTERSECTION IMPROVEMENTS
0050-08-086 US 290 Actual MAR 2013 $57,979,155 3 WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES,
0050-08-087 US 290 Actual APR 2013 135,455,756 5 RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE
0050-09-069 US 290 Actual MAY 2013 142,790,301 ROW RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE
0050-09-070 US 290 Actual APR 2013 153,351,431 ROW RECONST & WIDEN TO 8 MAIN LNS, 3 REVERSIBLE MANAGED LNS, AUX
0050-09-071 US 290 Actual SEP 2012 110,414,014 ROW CONSTRUCT 5 MAIN LANES WITH AUXILIARY LANES & 2 OR 3 LANE
0051-02-079 SH 3 Approved AUG 2013 $1,801,130 1 ADDITION OF RIGHT TURN LANE STORAGE, SIDEWALKS, RAILROAD
0051-02-091 SH 3 Actual MAY 2013 $1,261,827 1 DRAINAGE IMPROVEMENTS (PHASE V)
0110-05-117 IH 45 Actual OCT 2012 $187,376 1 REPLACE EXISTING TWLTL WITH RAISED MEDIAN, CURB AND RIPRAP
0271-14-213 IH 610 Approved AUG 2013 130,000,000 5 RECONSTRUCT US 290 / IH 610 INTERCHANGE WITH DIRECT CONNECTORS
0271-14-224 IH 610 Approved AUG 2013 $1,800,000 1 ASPHALT OVERLAY OF IH 610 MAIN LANES AT IH 45
0271-14-228 IH 610 Actual OCT 2012 107,046,836 ROW RECONSTRUCT US 290 / IH 610 INCLUDING IH 10 TO US 290 OUTBOUND
0271-16-130 IH 610 Approved JUL 2013 $1,801,800 1 HIGH MAST ILLUMINATION
0271-16-137 IH 610 Approved JUL 2013 $413,683 1 INSTALL PAVEMENT STRIPES\MARKERS
0271-17-154 IH 610 Actual SEP 2012 $315,518 1 SEAL RETAINING WALL JOINTS ON SB FRONTAGE ROAD
0389-13-056 SH 146 Actual NOV 2012 $6,585,238 12 CONSTRUCT DIRECT CONNECTOR (RAMP C DC EB TO NB)
0500-03-042 IH 45 Actual NOV 2012 $93,288,285 ROW WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3 - LANE FRONTAGE
0500-03-556 IH 45 Approved JUL 2013 $1,852,090 1 DESIGN AND CONSTRUCTION OF 3 DETENTION FACILITIES
0500-03-574 IH 45 Approved AUG 2013 $45,052,111 7 CONSTRUCT DIRECT CONNECTOR IH 610 EB TO IH 45 NB
0500-03-577 IH 45 Actual FEB 2013 $24,847,758 3 TRANSPORTATION MANAGEMENT SYSTEM IMPROVEMENTS CONSTRUCT
0508-01-276 IH 10 Approved AUG 2013 $38,674,453 ROW REPLACE BRIDGE AND APPROACHES
0508-01-332 IH 10 Actual JAN 2013 $2,460,155 1 HIGH MAST ILLUMINATION
0508-01-335 IH 10 Actual OCT 2012 $1,650,456 3 INTERSECTION IMPROVEMENTS
0508-01-343 IH 10 Approved AUG 2013 $1,500,000 6 REHABILITATION OF BRIDGE DECK (NBI 12102050801223)
0508-07-281 SP 330 Actual FEB 2013 $1,510,503 1 FULL DEPTH REPAIR, MILLING, CURB REPAIR AND ASPHALTIC
0720-03-102 SH 249 Approved AUG 2013 $50,000,000 3 CONSTRUCT 6 - LANE TOLLWAY WITH BRIDGES AT WILLOW CREEK,
0720-03-103 SH 249 Approved JUL 2013 $60,000,001 3 CONSTRUCT 6 - LANE TOLLWAY AND TSM (PHASE 2) WITH GRADE
0912-00-381 VA Actual MAR 2013 $1,787,200 1 UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
0912-00-413 VA Actual APR 2013 $1,456,617 1 NEW TRAFFIC SIGNALS
0912-00-418 VA Actual JAN 2013 $598,106 1 NEW SATELLITE BUILDING POWER SYSTEMS
0912-00-420 VA Actual JAN 2013 $1,899,904 1 NEW TRAFFIC SIGNALS
0912-00-424 VA Approved AUG 2013 $2,196,579 3 PEDESTRIAN AND SIGNAL IMPROVEMENTS IN AIRLINE DISTRICT
0912-00-447 VA Actual DEC 2012 $1,675,754 3 MONTROSE NEIGHBORHOOD PEDESTRIAN IMPROVEMENTS
0912-00-456 VA Actual JAN 2013 $200,000 1 ITS COMMUNICATIONS (NON LETTING)
0912-00-484 VA Approved AUG 2013 $700,000 8 UPGRADE & MODERNIZE SIGNALS
0912-70-064 CS Approved JUN 2013 $16,500,000 3 RECONSTRUCT 4 - LN BOULEVARD W / PAVING, CURBS, STREET LIGHTING
0912-70-065 CS Actual DEC 2012 $7,922,595 3 RECONSTRUCT BOULEVARD ROADWAY WITH PAVING, CURBS, STREET
0912-70-077 VA Actual APR 2013 $1,525,267 3 10 - FOOT WIDE SHARED USE PATH ON SOUTH BANK OF BRAYS BAYOU W /
0912-70-078 VA Approved JUN 2013 $2,523,356 3 LANDSCAPE WITH PEDESTRIAN IMPROVEMENTS ADJ.TO RDWY WITHIN
0912-70-085 VA Actual MAY 2013 $810,066 10 LANDSCAPE DEVELOPMENT
0912-71-001 VA Actual NOV 2012 $6,250,000 12 PRELIMINARY ENGINEERING / ENVIRONMENTAL ANALYSIS FOR URBAN
0912-71-005 VA Approved AUG 2013 $1,278,500 3 INSTALL UPS / BATTERY BACKUPS AT VARIOUS LOCATIONS CITYWIDE
0912-71-627 VA Approved JUL 2013 $2,881,790 3 CITY OF HOUSTON RCTSS PROGRAM
0912-71-688 CS Actual FEB 2013 $13,480,682 3 RECONSTRUCT AND WIDEN TO 6 LANE DIVIDED (WITH RAISED MEDIAN)
0912-71-895 CR Actual NOV 2012 $7,785,991 ROW CONSTRUCT 4 LANE CONCRETE DIVIDED SECTION WITH CURB AND
0912-72-004 CS Actual NOV 2012 $2,483,337 10 LANDSCAPE (CITY OF HOUSTON SECTION 115 EARMARK)
0912-72-050 CS Actual SEP 2012 $1,384,264 6 REHABILITATE BRIDGE AND APPROACHES
0912-72-061 CR Approved AUG 2013 $664,656 6 REPLACE BRIDGE (NBI# 12102AA0207001)
0912-72-175 VA Actual OCT 2012 $2,370,426 7 TRANSTAR OPERATIONS AND MANAGEMENT (NEW PARKING LOT AND
0912-72-195 CS Actual DEC 2012 $2,895,120 3 CREATE SMART ARTERIAL CORRIDORS
0912-72-199 VA Approved AUG 2013 $2,376,048 3 ITS FOR HIGH DEMAND ARTERIAL STREETS (RCTSS) HARRIS COUNTY
0912-72-229 CS Approved JUL 2013 $557,713 6 REPLACE BRIDGE AND APPROACHES (NBI# 12102B02249004)
0912-72-241 VA Actual MAY 2013 $1,883,747 1 SLOPE REPAIR, CHANNEL STABILIZATION, RETAINING WALL, AND
0912-72-288 VA Actual MAR 2013 $1,189,354 10 CONSTRUCT ADA CURB RAMPS ALONG IH 45 AND SH 288 IN HARRIS
0912-72-293 CS Actual FEB 2013 $3,559,738 3 BASE REPAIR, PLANING, 2" OVERLAY AND STRIPING
0976-01-019 FM 865 Approved AUG 2013 $12,600,000 3 WIDEN FROM 2 TO 4 LANES WITH CURB AND GUTTER
1006-01-059 FM 529 Actual OCT 2012 $7,690,214 1 WIDEN TO 4 LANE ROADWAY WITH CENTER LEFT TURN LANE AND
1062-02-023 FM 2100 Actual MAY 2013 $5,966,664 1 MILL & ACP OVERLAY
1258-04-056 FM 1093 Approved JUL 2013 $2,038,034 1 IMPLEMENTATION OF ACCESS MANAGEMENT (PHASE II) , SIDEWALKS
1685-02-049 FM 1960 Actual SEP 2012 $546,380 1 PAVEMENT MARKINGS
1685-07-019 BF1960A Approved AUG 2013 $11,275,251 3 BASE REPAIR, MILL, SEAL COAT, 1.5" ACP OVERLAY,
2941-01-021 FM 2920 Approved JUL 2013 $2,990,414 1 INTERSECTION IMPROVEMENTS

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0338-03-087 SH 105 Approved JUN 2013 $1,188,255 1 WIDEN WESTBOUND FROM 2 TO 3 LANES
0338-11-051 LP 336 Approved AUG 2013 $5,556,867 1 WIDEN TO 4 LANES UNDIVIDED RURAL
0523-10-034 FM 1488 Approved JUL 2013 $30,962,596 3 CONSTUCT RAILROAD GRADE SEPARATION OVER FM 149 AND BNSF RR
0675-08-107 IH 45 Actual MAY 2013 $745,136 10 LANDSCAPE DEVELOPMENT
0912-37-140 CR Approved JUL 2013 $2,069,830 3 CONSTRUCT 2 - LANE ROADWAY (MISSING SEGMENT)
0912-37-206 CR Actual NOV 2012 $561,551 6 REPLACE BRIDGE AND APPROACHES (NBI# 12170AA1352055)
3158-01-035 FM 3083 Approved JUL 2013 $2,978,041 3 WIDEN TO 4 - LANE DIVIDED RURAL
3538-01-030 SH 242 Actual JAN 2013 $33,998,617 3 CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH

Waller County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0912-56-046 CR Approved JUL 2013 $1,159,000 6 REPLACE BRIDGE (NBI# 12237AA0257001)
1745-01-019 FM 1887 Actual APR 2013 $5,083,866 1 FULL DEPTH RECLAMATION, SEAL COAT, LEVEL - UP, ACP
3445-01-007 FM 3346 Actual NOV 2012 $798,979 1 ACP OVERLAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract