Letting Schedule for Beaumont District (FY 2013)

Last Update: Monday, May 20, 2013
Beaumont District (FY 2013)
Chambers | Hardin | Jasper | Jefferson | Liberty | Orange

Chambers County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0389-10-011 LP 207 Actual OCT 2012 $273,525 1 OVERLAY EXISTING ROADWAY
0739-01-045 IH 10 Actual FEB 2013 $4,686,807 1 MILL AND OVERLAY EXISTING ROADWAY

Hardin County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0200-10-073 US 69 Actual SEP 2012 $2,061,902 1 OVERLAY EXISTING ROADWAY
0920-03-073 VA Approved AUG 2013 $3,423,077 5 CONSTRUCT A HIKE AND BIKE TRAIL
1096-01-057 FM 770 Actual OCT 2012 $822,580 1 OVERLAY EXISTING ROADWAY

Jasper County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
1275-01-037 FM 1013 Actual SEP 2012 $1,998,014 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH

Jefferson County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0028-06-074 US 90 Actual SEP 2012 $776,636 1 MILL AND OVERLAY EXISTING ROADWAY, AND REPLACE CURB
0028-06-075 US 90 Actual DEC 2012 $8,337,561 1 SEAL COAT
0028-13-132 IH 10 Actual APR 2013 $952,217 1 REPAIR EXISTING PAVEMENT AND DIAMOND GRIND
0200-11-100 US 69 Approved JUL 2013 $20,841,976 3 RAMP RELOCATION / RECONFIGURATION
0200-16-014 US 69 Approved JUL 2013 $969,543 6 REPLACE BRIDGE AND APPROACHES
0200-16-015 US 69 Actual DEC 2012 $664,902 12 INSTALL HIGH MAST LIGHTING
0306-03-120 SH 87 Approved JUL 2013 $1,826,924 6 REPLACE BRIDGE AND APPROACHES
0508-04-161 SH 73 Actual APR 2013 $5,990,047 1 OVERLAY EXISTING ROADWAY AND ADD SHOULDER TEXTURING
0920-00-111 VA Actual MAY 2013 $432,659 1 INSTALL LANDSCAPING
0920-00-115 VA Approved JUL 2013 $802,471 8 TEXTURIZE SHOULDERS AND CENTERLINE TEXTURING
0920-38-239 CS Approved AUG 2013 $718,011 9 CONSTRUCT HIKE AND BIKE TRAIL

Liberty County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0028-05-042 US 90 Approved JUN 2013 $17,231,528 7 ADD 2 LANES TO EXISTING 2 LANE HIGHWAY
0762-01-029 FM 686 Actual NOV 2012 $824,500 1 RESTORE EXISTING ROADWAY
0762-01-031 FM 1960 Actual NOV 2012 $2,805,410 12 ADD CONTINUOUS LEFT TURN LANE AND INSTALL PASSING LANES
0813-01-096 FM 787 Approved AUG 2013 $1,197,119 6 REPLACE BRIDGE AND APPROACHES
1023-02-047 FM 563 Actual OCT 2012 $2,638,787 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1421-01-024 FM 1413 Approved AUG 2013 $1,800,000 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH (WIDENING TO 28 FT.)
2381-01-009 FM 2518 Actual JAN 2013 $2,196,076 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH

Orange County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0028-11-200 IH 10 Actual MAY 2013 $505,343 1 TEXTURIZE CONCRETE PAVEMENT
0028-14-109 IH 10 Approved JUL 2013 $59,344,804 3 REPLACE BRIDGE AND APPROACHES
0028-15-051 BU 90-Y Approved JUL 2013 $578,775 6 REPAIR BRIDGE SUBSTRUCTURE
0306-01-059 SH 73 Approved AUG 2013 $7,216,860 6 REPAIR BRIDGE
0883-02-074 FM 105 Actual APR 2013 $4,197,094 1 PROVIDE ADDITIONAL PAVEMENT


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract