The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | VAL VERDE | Let Date: | 07/10/19 |
Type: | BASE, SURF TREAT, GRAD, STR, PAV MRK | Seq No: | 3248 |
Time: | 123 WORKING DAYS | Project ID: | C 922-11-43 |
Highway: | PW | Contract #: | 07193248 |
Length: | 0.100 | CCSJ: | 0922-11-043 |
Limits: | |||
From: | AT DEVIL'S RIVER STATE NATURAL AREA | Check: | $84,000 |
To: | ROAD TO RIVER | Misc Cost: | $40,526.22 |
Estimate | $4,213,914.96 | % Over/Under | Company |
Bidder 1 | $3,978,828.43 | -5.58% | RELMCO, INC. |
Bidder 2 | $4,644,193.57 | +10.21% | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 250.420 | 600.00 | 1 2 | 800.000 623.940 |
1106001 | EXCAVATION (ROADWAY) | CY | 1,392.000 | 8.00 | 1 2 | 18.000 45.970 |
1106003 | EXCAVATION (SPECIAL) | CY | 11,170.000 | 33.00 | 1 2 | 18.000 62.150 |
1326001 | EMBANKMENT (FINAL)(ORD COMP)(TY A) | CY | 9,965.000 | 15.00 | 1 2 | 8.400 37.320 |
1506002 | BLADING | HR | 126.000 | 200.00 | 1 2 | 150.000 227.920 |
1646036 | DRILL SEEDING (PERM) (RURAL) (CLAY) | AC | 10.490 | 1,485.00 | 1 2 | 1,430.000 1,210.900 |
2166001 | PROOF ROLLING | HR | 79.000 | 220.00 | 1 2 | 102.000 127.110 |
2476041003 | FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | CY | 3,107.000 | 187.00 | 1 2 | 78.000 85.470 |
2476060003 | FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS) | CY | 7,409.000 | 35.00 | 1 2 | 78.000 77.950 |
2606002 | LIME (HYDRATED LIME (SLURRY)) | TON | 1,203.000 | 168.00 | 1 2 | 252.000 214.560 |
2606073 | LIME TRT (SUBGRADE)(8") | SY | 43,873.000 | 2.98 | 1 2 | 4.000 3.900 |
2606086 | LIME TRT (NEW BASE) (7") | SY | 37,410.000 | 2.45 | 1 2 | 4.400 3.090 |
3166015 | ASPH (AC-15P) | GAL | 1,772.000 | 7.00 | 1 2 | 10.000 7.140 |
3166021 | ASPH (CRS-1P) | GAL | 5,337.000 | 11.00 | 1 2 | 10.000 5.510 |
3166029 | ASPH (RC-250) | GAL | 4,268.000 | 9.00 | 1 2 | 10.000 8.100 |
3166140 | AGGR(TY-PD GR-3 SAC-A) | CY | 157.000 | 264.00 | 1 2 | 105.000 177.140 |
3166142 | AGGR(TY-PD GR-4 SAC-A) | CY | 108.000 | 264.00 | 1 2 | 110.000 257.510 |
3166222 | AGGR(TY-PB GR-3 SAC-B) | CY | 24.000 | 80.00 | 1 2 | 150.000 505.070 |
3166224 | AGGR(TY-PB GR-4 SAC-B) | CY | 21.000 | 90.00 | 1 2 | 150.000 569.250 |
3606002 | CONC PVMT (CONT REINF - CRCP) (8") | SY | 1,500.000 | 142.88 | 1 2 | 400.000 211.360 |
4006005 | CEM STABIL BKFL | CY | 44.000 | 330.00 | 1 2 | 300.000 338.690 |
4326001 | RIPRAP (CONC)(4 IN) | CY | 525.000 | 1,100.00 | 1 2 | 750.000 893.770 |
4646005 | RC PIPE (CL III)(24 IN) | LF | 335.000 | 220.00 | 1 2 | 112.890 93.160 |
4656147 | INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT) | EA | 4.000 | 11,000.00 | 1 2 | 7,425.000 9,623.310 |
4966016 | REMOV STR (PIPE) | EA | 3.000 | 2,750.00 | 1 2 | 2,025.000 1,876.950 |
5006001 | MOBILIZATION | LS | 1.000 | 680,186.07 | 1 2 | 400,000.000 583,168.500 |
5026001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 4.000 | 6,600.00 | 1 2 | 8,500.000 1,610.360 |
5026001007 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 3.000 | 6,600.00 | 1 2 | 8,500.000 1,803.930 |
5066040004 | BIODEG EROSN CONT LOGS (INSTL) (8") | LF | 1,790.000 | 17.60 | 1 2 | 6.200 9.590 |
5066041004 | BIODEG EROSN CONT LOGS (INSTL) (12") | LF | 8,341.000 | 10.00 | 1 2 | 7.500 11.720 |
5066043004 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 10,131.000 | 2.00 | 1 2 | 1.200 2.340 |
5306006 | DRIVEWAYS (SURF TREAT) | SY | 370.000 | 25.00 | 1 2 | 50.550 70.830 |
5306016 | DRIVEWAYS (BASE) | SY | 312.000 | 20.00 | 1 2 | 42.940 49.090 |
5406001 | MTL W-BEAM GD FEN (TIM POST) | LF | 3,400.000 | 46.20 | 1 2 | 26.230 24.630 |
5406016 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 8.000 | 5,280.00 | 1 2 | 1,367.400 1,447.590 |
6586062 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 66.000 | 44.00 | 1 2 | 72.090 73.700 |
6586073 | INSTL OM ASSM (OM-2Y)(WC)GND(BI) | EA | 8.000 | 220.00 | 1 2 | 433.120 100.650 |
6666315 | RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | LF | 11,982.000 | 1.10 | 1 2 | 3.000 0.710 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 151.000 | 11.00 | 1 2 | 80.000 6.460 |