AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - ODESSA DISTRICT

Last Update: Friday, February 27, 2015
ITEMS 500 2001 TO 545 2051
Items Items Bid Code Range
0100 - 0164
0216 - 0251
0310 - 0354
0400 - 0496
0500 - 0545
0610 - 0686
0752 - 0752
1122 - 1122
2144 - 2147
3270 - 3271
4618 - 4684
5367 - 5367
6001 - 6834
8020 - 8880
500 2001 - 545 2051
Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 2.000 98,500.00000 11.000 380,139.59636 11
500 6001 MOBILIZATION LS     1.000 190,000.00000 1
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 11.000 2,690.90909 72.000 11,063.07958 11
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO     3.000 4,000.00000 1
512 2001 PORT CTB (FUR & INST) (SAFETY SH) (TY 1) LF     3,160.000 94.53000 1
512 2010 PORT CTB (DES SOURCE) (SAFETY SH) (TY 1) LF     4,620.000 6.39481 2
512 2019 PORT CTB (MOVE) (SAFETY SH) (TY 1) LF     17,540.000 7.63128 2
512 2028 PORT CTB (STKPL) (SAFETY SH) (TY 1) LF     7,780.000 8.25522 2
529 2003 CONC CURB & GUTTER (TY I) LF     390.000 30.60000 1
529 2004 CONC CURB & GUTTER (TY II) LF     465.000 54.94677 2
529 2015 CONC CURB (TY I) (REINF) LF     235.000 58.65000 1
529 2069 CONC CURB AND GUTTER (TY I) (REINF) LF     786.000 27.72000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF     405,403.200 .20088 3
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF 750.000 29.00000 42,042.000 20.21006 7
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 2.000 2,800.00000 98.000 2,036.65714 6
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA 2.000 2,900.00000 40.000 1,053.59950 6
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF 40.000 55.00000 40.000 55.00000 1
540 2046 MTL BM GD FEN TRANS (NON - SYM) EA     4.000 1,050.21000 1
542 2001 REMOVING METAL BEAM GUARD FENCE LF 400.000 2.75000 41,715.000 2.60753 7
542 2002 REMOVING TERMINAL ANCHOR SECTION EA 6.000 333.33333 78.000 212.70154 6
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 2,500.00000 4.000 2,500.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 2.000 500.00000 69.000 430.18812 6
544 2013 GDRAIL END TRT (INSTALL) (HBA POST) EA 2.000 1,500.00000 78.000 2,330.25256 6
545 2049 CRASH CUSH ATTEN (INSTL) (WORK ZONE) EA     8.000 10,747.35750 2
545 2050 CRASH CUSH ATTEN (MOV & RESET) (WORK ZONE) EA     23.000 1,216.50000 2
545 2051 CRASH CUSH ATTEN (REMOVE) (WORK ZONE) EA     8.000 878.97500 2