AVERAGE LOW BID UNIT PRICE - MAINTENANCE - LAREDO DISTRICT

Last Update: Wednesday, September 17, 2014
ITEMS 712 2005 TO 788 2004
Items Items Bid Code Range
0100 - 0150
0247 - 0247
0310 - 0360
0400 - 0479
0500 - 0550
0610 - 0690
0712 - 0788
1122 - 1122
3035 - 3035
4191 - 4191
5845 - 5845
6006 - 6834
7224 - 7224
8835 - 8942
712 2005 - 788 2004
Item No Description Units August 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI 800.000 445.50000 2,650.000 479.48113 6
730 2001 STRIP MOWING AC     7,973.710 26.97248 5
730 2002 FULL - WIDTH MOWING AC     15,266.100 36.51518 6
730 2056 FULL - WIDTH MOWING - TRACT (1) AC     24,390.790 26.81054 5
734 2001 LITTER REMOVAL AC     1,850.600 30.00000 1
734 2004 LITTER REMOVAL - TRACT (1) AC     1,470.000 15.00000 1
734 2005 LITTER REMOVAL - TRACT (2) AC     1,265.000 15.00000 1
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     140.400 36.00000 1
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     6.480 36.00000 1
735 2008 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) MI     4,830.000 36.00000 1
735 2009 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) MI     1,836.000 36.00000 1
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     1,464.950 164.06747 5
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,660.510 169.47157 5
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     515.260 156.21719 5
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     160.470 204.89475 5
738 2011 CLEANING / SWEEPING (HANDWORK) SY     12,580.000 0.45000 1
738 2221 DIRECT CONNECTOR CLEAN AND SWEEP (RAMP MI     221.140 154.55793 4
738 2233 CLEANING / SWEEPING (RAISED MEDIAN) MI     59.220 1,150.00000 1
738 2234 CLEANING / SWEEPING (AREA (INTERSECTION) CYC     4.000 8,000.00000 1
751 2002 HERBICIDE APPLICATION (SITE A) CYC     8.000 1,700.00000 1
751 2008 PLANT BED MAINTENANCE (SITE A) CYC     48.000 60.00000 1
751 2011 FERTILIZER APPLICATION (SITE B) CYC     12.000 100.00000 1
751 2025 LITTER PICKUP CYC     83.000 90.00000 1
751 2027 MOWING, TRIMMING, AND EDGING CYC     120.000 1,042.00000 1
751 2031 PRUNING CYC     3.000 19,200.00000 2
751 2034 FERTILIZER APPLICATION CYC     2.000 100.00000 1
752 2024 TREE REMOVAL (18" - 24" DIA) EA     3.000 4,000.00000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     5,780.000 1.20000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     7,500.000 17.66667 2
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     50.000 12.50000 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     25.000 12.50000 2
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     700.000 26.42857 2
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     85.000 28.82353 2
770 2006 REALIGN POSTS EA     150.000 16.66667 2
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     4.000 3.00000 2
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     8.000 2,425.00000 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     40.000 850.00000 2
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     2,000.000 21.25000 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     280.000 64.28571 2
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     15.000 103.33333 2
770 2022 REM & RESET SGT IMPACT HEAD EA     8.000 537.50000 2
770 2023 REPLACE SGT OBJECT MARKER EA     20.000 30.00000 2
770 2024 REPLACE SGT CABLE ANCHOR EA     30.000 23.33333 2
770 2025 REPLACE SGT CABLE ASSEMBLY EA     30.000 23.33333 2
770 2026 REPLACE SGT STRUT EA     25.000 26.00000 2
770 2027 REMOVE & REPLACE BLOCKOUT EA     400.000 3.00000 2
770 2033 INSTALL BLOCKOUT EA     100.000 30.00000 2
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     100.000 16.50000 2
770 2039 REM / REPL TIM / STL POST W CONC FND (FURN EA     2.000 200.00000 1
770 2040 RAISE RAIL ELEMENT LF     400.000 4.00000 2
788 2001 CONCRETE BEAM REPAIR EA     1.000 15,000.00000 1
788 2004 CONCRETE BEAM REP (STRAND SPLICE) EA     1.000 20,000.00000 1