|
||||
|
||||
| AVERAGE LOW BID UNIT PRICE - MAINTENANCE - FORT WORTH DISTRICT | ||||
| Last Update: Thursday, October 8, 2009 |
| ITEMS 700 2003 TO 788 2004 |
| Items | Items | Bid Code Range |
|---|---|---|
| 0162 - 0168 0351 - 0361 0420 - 0499 0500 - 0560 0620 - 0690 0700 - 0788 |
4013 - 4159 5049 - 5049 6153 - 6834 7147 - 7444 8251 - 8251 |
700 2003 - 788 2004 |
| Item No | Description | Units | Septembe 30, 2009 | Twelve Month Moving | Usage | ||
|---|---|---|---|---|---|---|---|
| Quantity | Avg Bid | Quantity | Avg Bid | ||||
| 700 2003 | POTHOLE REPAIR (STANDARD) | TON | 480.000 | 124.22917 | 5 | ||
| 700 2007 | POTHOLE REPAIR (SAW - CUT) | TON | 11,159.000 | 122.02662 | 5 | ||
| 700 2009 | EMERGENCY MOBILIZATION | EA | 14.000 | 189.50000 | 5 | ||
| 730 2002 | FULL - WIDTH MOWING | AC | 70,024.000 | 25.26218 | 11 | ||
| 730 2003 | SPOT MOWING | AC | 900.000 | 23.02944 | 11 | ||
| 770 2001 | REPAIR RAIL ELEMENT (W - BEAM) | LF | 112,000.000 | 4.50000 | 177,500.000 | 4.27859 | 2 |
| 770 2002 | REPAIR RAIL ELEMENT (THRIE - BEAM) | LF | 400.000 | 10.00000 | 500.000 | 9.40000 | 2 |
| 770 2003 | REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) | LF | 600.000 | 4.00000 | 700.000 | 3.91571 | 2 |
| 770 2004 | REM / REPL TIMBER / STL POST W / O CONC FND | EA | 13,000.000 | 5.00000 | 18,350.000 | 9.37330 | 2 |
| 770 2005 | REM / REPL TIMBER / STL POST W / CONC FND | EA | 700.000 | 15.00000 | 800.000 | 20.37500 | 2 |
| 770 2006 | REALIGN POSTS | EA | 1,000.000 | 10.00000 | 1,000.000 | 10.00000 | 1 |
| 770 2009 | REMOVE GDRAIL END TRT / REPL WITH SGT | EA | 150.000 | 400.00000 | 225.000 | 405.00000 | 2 |
| 770 2010 | REPL SINGLE GDRAIL TERM IMPACT HEAD | EA | 160.000 | 300.00000 | 210.000 | 300.00000 | 2 |
| 770 2011 | REPLACE SINGLE GDRAIL TERMINAL RAIL | LF | 30,200.000 | 2.00000 | 45,200.000 | 3.06195 | 2 |
| 770 2012 | REPLACE SINGLE GDRAIL TERMINAL POST | EA | 4,600.000 | 30.00000 | 6,100.000 | 27.29508 | 2 |
| 770 2013 | REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS | EA | 300.000 | 10.00000 | 315.000 | 14.00714 | 2 |
| 770 2014 | REPAIR STEEL POST WITH BASE PLATE | EA | 600.000 | 20.00000 | 800.000 | 63.75000 | 2 |
| 770 2017 | REPAIR RAIL ELEMENT (T4S) | LF | 500.000 | 3.78000 | 1 | ||
| 772 2001 | POST AND CABLE FENCE (REMOVAL) | LF | 100.000 | 2.99000 | 1 | ||
| 772 2002 | POST AND CABLE FENCE (REMV CONC ANCHOR) | EA | 1.000 | 22.21000 | 1 | ||
| 772 2003 | POST AND CABLE FENCE (NEW INSTALLATION) | LF | 200.000 | 5.00000 | 1,200.000 | 3.43333 | 2 |
| 772 2004 | POST AND CABLE FENCE (NEW CONC ANCHOR) | EA | 2.000 | 47.59000 | 1 | ||
| 772 2005 | POST AND CABLE FENCE (REMV / REPL POSTS) | EA | 10.000 | 20.00000 | 60.000 | 20.51667 | 2 |
| 772 2006 | POST AND CABLE FENCE (RMV / REPL CNC ANCH | EA | 4.000 | 50.00000 | 5.000 | 56.44600 | 2 |
| 772 2007 | POST AND CABLE FENCE (REMV / REPL CABLE) | LF | 100.000 | 5.00000 | 3,100.000 | 2.07742 | 2 |
| 774 2001 | REMOVE AND REPLACE (TRACC) | EA | 110.000 | 500.00000 | 111.000 | 509.00901 | 2 |
| 774 2002 | REMOVE AND REPLACE (WIDE TRACC) | EA | 4.000 | 100.00000 | 5.000 | 430.00000 | 2 |
| 774 2003 | REMOVE AND REPLACE (NARROW REACT 350) | EA | 1.000 | 1,500.00000 | 1 | ||
| 774 2004 | REMOVE AND REPLACE (WIDE REACT 350) | EA | 1.000 | 2,000.00000 | 1 | ||
| 774 2006 | REPAIR (TRACC) | EA | 3.000 | 1,800.00000 | 1 | ||
| 774 2008 | REPAIR (WIDE TRACC) | EA | 1.000 | 3,000.00000 | 1 | ||
| 774 2010 | REPAIR (REACT) | EA | 5.000 | 1,200.00000 | 1 | ||
| 774 2023 | REPAIR REACT (N) (MISC HARDWARE) | EA | 3.000 | 1,089.12000 | 1 | ||
| 774 2024 | REPAIR REACT (N) (REAR SEC "S") | EA | 1.000 | 1,089.12000 | 1 | ||
| 774 2025 | REPAIR REACT (N) (REAR SEC "B") | EA | 1.000 | 1,089.12000 | 1 | ||
| 774 2026 | REPAIR REACT (N) (FRONT SECTION) | EA | 1.000 | 1,089.12000 | 1 | ||
| 774 2027 | REPAIR REACT (N) (CYLINDERS) | EA | 1.000 | 1,500.00000 | 1 | ||
| 776 2031 | REPAIR (ALUMINUM RAIL) | LF | 65.000 | 180.00000 | 1 | ||
| 776 2038 | REP METAL POST W / BASE PLATE (TY A) (SPL | EA | 26.000 | 600.00000 | 1 | ||
| 780 2001 | EPOXY INJECTION (TY IX) | LF | 154.000 | 80.00000 | 1 | ||
| 784 2001 | REPAIRING STL BRIDGE MEMBER (BEAM) | EA | 8.000 | 8,900.00000 | 4 | ||
| 784 2002 | REPAIRING STL BRIDGE MEMBER (DIAPHRAGM) | EA | 44.000 | 1,018.40909 | 2 | ||
| 784 2005 | REP STL BRIDGE MEMBER (TRUSS SWAY BRACE | EA | 1.000 | 16,000.00000 | 1 | ||
| 784 2009 | REPAIRING STL BRIDGE MEMBER (SHOES) | EA | 17.000 | 990.00000 | 1 | ||
| 784 2057 | REP STL BRDG MEMB (TRUSS PORTAL BRACE) | EA | 1.000 | 16,000.00000 | 1 | ||
| 788 2001 | CONCRETE BEAM REPAIR | EA | 16.000 | 4,750.00000 | 5 | ||
| 788 2004 | CONCRETE BEAM REP (STRAND SPLICE) | EA | 1.000 | 11,400.00000 | 1 | ||
| | ||||
|