AVERAGE LOW BID UNIT PRICE - MAINTENANCE - FORT WORTH DISTRICT

Last Update: Monday, June 2, 2014
ITEMS 712 2002 TO 788 2002
Items Items Bid Code Range
0100 - 0169
0247 - 0276
0305 - 0361
0401 - 0496
0500 - 0560
0620 - 0690
0712 - 0788
1122 - 1122
3043 - 3278
5049 - 5049
6006 - 6834
7205 - 7224
8251 - 8946
712 2002 - 788 2002
Item No Description Units May 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     28.630 756.09501 2
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     2,862.100 511.45784 9
730 2002 FULL - WIDTH MOWING AC     133,078.000 25.35790 11
730 2003 SPOT MOWING AC     1,400.000 22.95286 9
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     13,084.790 23.28453 2
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     9,982.120 20.57077 2
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     175.000 1.00000 2
735 2008 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) MI     1,203.200 25.90367 2
735 2009 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) MI     4,715.200 28.81931 2
735 2010 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) MI     2,437.000 30.87595 2
735 2011 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (4) MI     1,614.200 28.80396 2
735 2012 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (5) MI     245.400 25.58998 1
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     1,802.950 63.49095 2
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,847.070 63.40756 2
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     696.800 48.64237 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     2,000.800 69.80408 2
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     457.260 38.45952 2
738 2010 CLEANING / SWEEPING (SPOT) MI     150.000 7.00000 2
738 2011 CLEANING / SWEEPING (HANDWORK) SY     87,619.040 0.03288 2
738 2225 CLEAN / SWEEP - (HANDWORK) (BULLPEN) SY     120,515.640 0.05000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 50,000.000 3.00000 80,500.000 4.93696 5
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 50.000 6.00000 278.000 6.20683 5
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 50.000 6.00000 192.000 4.92708 5
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 4,000.000 20.00000 11,600.000 11.33103 5
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 50.000 20.00000 180.000 29.65278 4
770 2006 REALIGN POSTS EA 1,000.000 15.00000 1,875.000 13.33333 4
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     2.000 1.00000 1
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     4.000 1.00000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 75.000 300.00000 230.000 346.60217 5
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 50.000 100.00000 143.000 55.59441 5
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 7,500.000 6.00000 23,600.000 5.05826 5
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 1,000.000 20.00000 2,855.000 11.90893 5
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA 350.000 10.00000 703.000 7.58890 3
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 300.000 25.00000 699.000 17.11016 5
770 2017 REPAIR RAIL ELEMENT (T4S) LF     150.000 4.00000 1
770 2022 REM & RESET SGT IMPACT HEAD EA 250.000 100.00000 765.000 64.01634 5
770 2023 REPLACE SGT OBJECT MARKER EA 50.000 5.00000 194.000 4.69845 5
770 2024 REPLACE SGT CABLE ANCHOR EA 38.000 5.00000 321.000 1.70745 5
770 2025 REPLACE SGT CABLE ASSEMBLY EA 50.000 5.00000 296.000 2.34628 5
770 2026 REPLACE SGT STRUT EA 25.000 5.00000 142.000 1.92254 5
770 2027 REMOVE & REPLACE BLOCKOUT EA 500.000 5.00000 1,960.000 4.82143 5
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     1,200.000 5.16667 3
770 2040 RAISE RAIL ELEMENT LF     22,500.000 3.71111 3
772 2001 POST AND CABLE FENCE (REMOVAL) LF     130.000 2.99808 2
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA     1.000 20.00000 1
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     1,722.000 3.21835 4
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     1.000 45.00000 1
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA     160.000 9.06250 3
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA     25.000 17.20000 3
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF     2,300.000 1.15652 3
774 2001 REMOVE AND REPLACE (TRACC) EA     1.000 500.00000 1
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     1.000 500.00000 1
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA     1.000 1,000.00000 1
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA     1.000 500.00000 1
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA     10.000 150.00000 1
774 2006 REPAIR (TRACC) EA 25.000 500.00000 56.000 473.90179 5
774 2008 REPAIR (WIDE TRACC) EA 2.000 500.00000 12.000 437.27083 4
774 2010 REPAIR (REACT) EA 25.000 500.00000 55.000 431.60909 3
774 2023 REPAIR REACT (N) (MISC HARDWARE) EA     1.000 300.00000 1
774 2024 REPAIR REACT (N) (REAR SEC "S") EA     1.000 350.00000 1
774 2025 REPAIR REACT (N) (REAR SEC "B") EA     1.000 350.00000 1
774 2026 REPAIR REACT (N) (FRONT SECTION) EA     1.000 750.00000 1
774 2027 REPAIR REACT (N) (CYLINDERS) EA     1.000 400.00000 1
774 2035 REPAIR REACT (CYLINDERS) EA 25.000 200.00000 50.000 174.78500 2
780 2001 EPOXY INJECTION (TY IX) LF     46.000 85.00000 1
784 2002 REPAIRING STL BRIDGE MEMBER (DIAPHRAGM) EA     5.000 245.00000 1
784 2009 REPAIRING STL BRIDGE MEMBER (SHOES) EA     10.000 245.00000 1
788 2002 CONCRETE BEAM REPAIR (CFRP) EA     9.000 7,883.33333 2