AVERAGE LOW BID UNIT PRICE - MAINTENANCE - FORT WORTH DISTRICT

Last Update: Friday, August 21, 2015
ITEMS 712 2005 TO 788 2002
Items Items Bid Code Range
0100 - 0169
0216 - 0247
0316 - 0354
0427 - 0499
0500 - 0550
0644 - 0690
0712 - 0788
1122 - 1122
3267 - 3278
4159 - 4159
5414 - 5414
6001 - 6834
7012 - 7206
8251 - 8972
712 2005 - 788 2002
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     313.090 700.00000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     330.400 2,191.00484 7
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     112.900 2,507.82516 7
752 2022 TREE REMOVAL (4" - 12" DIA) EA     1,740.000 65.11494 6
752 2023 TREE REMOVAL (12" - 18" DIA) EA     1,530.000 94.50980 6
752 2024 TREE REMOVAL (18" - 24" DIA) EA     820.000 163.41463 6
752 2025 TREE REMOVAL (24" - 30" DIA) EA     635.000 244.91520 7
752 2026 TREE REMOVAL (30" - 36" DIA) EA     450.000 436.44444 7
752 2027 TREE REMOVAL (36" - 42" DIA) EA     150.000 504.79860 6
752 2028 TREE REMOVAL (42" - 48" DIA) EA     42.000 691.66667 8
752 2029 TREE REMOVAL (48" - 60" DIA) EA     37.000 945.94595 7
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     50,000.000 3.00000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     50.000 6.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     50.000 6.00000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     4,000.000 20.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     50.000 20.00000 1
770 2006 REALIGN POSTS EA     1,000.000 15.00000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     75.000 300.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     50.000 100.00000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     7,500.000 6.00000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     1,000.000 20.00000 1
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     350.000 10.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     300.000 25.00000 1
770 2022 REM & RESET SGT IMPACT HEAD EA     250.000 100.00000 1
770 2023 REPLACE SGT OBJECT MARKER EA     50.000 5.00000 1
770 2024 REPLACE SGT CABLE ANCHOR EA     38.000 5.00000 1
770 2025 REPLACE SGT CABLE ASSEMBLY EA     50.000 5.00000 1
770 2026 REPLACE SGT STRUT EA     25.000 5.00000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA     500.000 5.00000 1
774 2006 REPAIR (TRACC) EA     25.000 500.00000 1
774 2008 REPAIR (WIDE TRACC) EA     2.000 500.00000 1
774 2010 REPAIR (REACT) EA     25.000 500.00000 1
774 2035 REPAIR REACT (CYLINDERS) EA     25.000 200.00000 1
780 2001 EPOXY INJECTION (TY IX) LF     118.000 100.00000 1
788 2002 CONCRETE BEAM REPAIR (CFRP) EA     11.000 10,200.00000 1