AVERAGE LOW BID UNIT PRICE - MAINTENANCE - FORT WORTH DISTRICT

Last Update: Wednesday, April 3, 2013
ITEMS 712 2002 TO 788 2001
Items Items Bid Code Range
0104 - 0150
0247 - 0275
0305 - 0361
0401 - 0481
0500 - 0556
0662 - 0690
0712 - 0788
3043 - 3043
4013 - 4013
5049 - 5049
6006 - 6834
7206 - 7224
8251 - 8615
712 2002 - 788 2001
Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     16.060 800.00000 1
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,624.310 527.04500 5
730 2002 FULL - WIDTH MOWING AC     135,044.000 24.52503 11
730 2003 SPOT MOWING AC     1,400.000 19.41214 9
735 2002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI     14,004.600 25.06881 2
735 2006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI     10,631.120 20.72036 2
735 2007 DEBRIS REMOVAL (SPOT DEBRIS) MI     175.000 1.00000 2
735 2008 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) MI     380.000 31.10000 2
735 2009 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) MI     6,640.000 31.92000 2
735 2010 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) MI     2,080.000 36.30000 2
735 2011 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (4) MI     590.000 41.30000 2
738 2002 CLEANING / SWEEPING (CENTER MEDIAN) MI     1,841.910 71.49869 2
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI     1,877.070 71.37696 2
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     720.840 79.51224 2
738 2008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) MI     2,085.900 62.12398 2
738 2009 CLEANING / SWEEPING (AGGREGATE REMOVAL) MI     473.460 23.98566 2
738 2010 CLEANING / SWEEPING (SPOT) MI     50.000 20.00000 1
738 2011 CLEANING / SWEEPING (HANDWORK) SY     87,619.040 0.03288 2
738 2225 CLEAN / SWEEP - (HANDWORK) (BULLPEN) SY     120,515.640 0.07000 1
745 2010 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (1) CYC     27.000 456.75815 2
745 2011 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (2) CYC     11.000 857.77000 1
745 2012 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (3) CYC     27.000 257.75074 2
745 2013 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (4) CYC     27.000 140.20259 2
745 2014 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (5) CYC     27.000 211.89444 2
745 2015 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (6) CYC     27.000 211.34185 2
745 2016 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (7) CYC     11.000 212.77000 1
745 2017 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (8) CYC     11.000 287.77000 1
745 2018 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (9) CYC     11.000 192.77000 1
745 2019 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (10 CYC     11.000 172.77000 1
745 2020 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (11 CYC     11.000 157.77000 1
745 2100 JANITORIAL MAINT - PICNIC AREA - SITE (1) CYC     26.000 332.52000 1
745 2101 JANITORIAL MAINT - PICNIC AREA - SITE (2) CYC     26.000 341.43000 1
745 2102 JANITORIAL MAINT - PICNIC AREA - SITE (3) CYC     26.000 252.52000 1
745 2103 JANITORIAL MAINT - PICNIC AREA - SITE (4) CYC     26.000 291.43000 1
745 2106 JANITORIAL MAINT - PICNIC AREA - SITE (7) CYC     26.000 1,313.44000 1
745 2107 JANITORIAL MAINT - PICNIC AREA - SITE (8) CYC     26.000 875.00000 1
764 2001 DRAIN INLET CLEANING EA     1.000 500.00000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 3,250.000 6.50000 3,250.000 6.50000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 100.000 5.00000 100.000 5.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 50.000 2.00000 50.000 2.00000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 900.000 10.00000 900.000 10.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 30.000 30.00000 30.000 30.00000 1
770 2006 REALIGN POSTS EA 250.000 5.00000 250.000 5.00000 1
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 2.000 1.00000 2.000 1.00000 1
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 4.000 1.00000 4.000 1.00000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 30.000 500.00000 30.000 500.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 20.000 30.00000 20.000 30.00000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 2,000.000 13.00000 2,000.000 13.00000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 160.000 10.00000 160.000 10.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA 4.000 30.00000 4.000 30.00000 1
770 2022 REM & RESET SGT IMPACT HEAD EA 40.000 30.00000 40.000 30.00000 1
770 2023 REPLACE SGT OBJECT MARKER EA 40.000 1.00000 40.000 1.00000 1
770 2024 REPLACE SGT CABLE ANCHOR EA 40.000 1.00000 40.000 1.00000 1
770 2025 REPLACE SGT CABLE ASSEMBLY EA 40.000 1.00000 40.000 1.00000 1
770 2026 REPLACE SGT STRUT EA 40.000 1.00000 40.000 1.00000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA 160.000 5.00000 160.000 5.00000 1
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 100.000 5.00000 100.000 5.00000 1
770 2040 RAISE RAIL ELEMENT LF 2,000.000 3.00000 2,000.000 3.00000 1
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF 1,000.000 2.00000 1,000.000 2.00000 1
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA 100.000 5.00000 100.000 5.00000 1
772 2006 POST AND CABLE FENCE (RMV / REPL CNC ANCH EA 20.000 10.00000 20.000 10.00000 1
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF 200.000 1.00000 200.000 1.00000 1
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA 10.000 150.00000 10.000 150.00000 1
774 2006 REPAIR (TRACC) EA 4.000 700.00000 4.000 700.00000 1
774 2008 REPAIR (WIDE TRACC) EA 4.000 450.00000 4.000 450.00000 1
776 2032 REPAIR (STEEL POST W / CHANNEL IRON RAIL LF     143.000 150.00000 1
780 2001 EPOXY INJECTION (TY IX) LF     248.000 40.00000 1
788 2001 CONCRETE BEAM REPAIR EA     64.000 250.00000 1