AVERAGE LOW BID UNIT PRICE - MAINTENANCE - FORT WORTH DISTRICT

Last Update: Wednesday, November 9, 2016
ITEMS 712 2005 TO 771 6009
Items Items Bid Code Range
0104 - 0104
0316 - 0361
0416 - 0427
0500 - 0550
0618 - 0690
0712 - 0788
3278 - 3278
6000 - 6834
7005 - 7005
8945 - 8972
712 2005 - 771 6009
771 6010 - 788 6003
Item No Description Units October 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     313.090 700.00000 1
712 6005 JT / CRCK SEAL (RUBBER - ASPHALT) LF     377.830 400.00000 1
712 6008 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     2,714.450 640.80845 6
712 6012 JT / CRCK SEAL (HOT - POURED RUBBER) LMI     456.200 740.00000 1
730 6002 FULL - WIDTH MOWING AC     146,430.000 33.09199 11
730 6003 SPOT MOWING AC     1,000.000 23.49800 6
731 6007 PAVEMENT EDGES, STRUCTURES & FIXTURES MI     1,732.200 81.48020 3
731 6011 BROADCAST APPLICATION AC     12,321.400 55.63304 3
735 6002 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES MI 8,341.440 25.00000 24,660.550 31.75802 7
735 6006 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) MI 6,955.900 27.50000 16,919.910 30.04337 4
735 6007 DEBRIS REMOVAL (SPOT DEBRIS) MI 75.000 25.00000 450.000 61.27778 7
735 6008 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (1) MI     182.400 39.00000 1
735 6009 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (2) MI     3,187.200 39.00000 1
735 6010 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (3) MI     998.400 39.00000 1
735 6011 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (4) MI     283.200 39.00000 1
735 6012 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (5) MI     231.600 39.00000 1
735 6013 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (6) MI     123.600 39.00000 1
735 6014 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (7) MI     150.000 39.00000 1
735 6015 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (8) MI     258.000 39.00000 1
735 6016 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (9) MI     399.600 39.00000 1
735 6017 DEBRIS - CNTR MEDIANS / MAINLANES - AREA (10 MI     422.400 39.00000 1
735 6148 DEBRIS REMOVAL (DIRECT CONNECTOR) MI     1,015.200 150.00000 1
738 6001 CLEANING / SWEEPING (CENTER MEDIAN) CYC     28.000 4,500.00000 1
738 6002 CLEANING / SWEEPING (CENTER MEDIAN) MI 1,259.400 90.00000 3,762.000 83.42746 6
738 6003 CLEANING / SWEEPING (OUTSIDE MAIN LANE CYC     36.000 4,000.00000 1
738 6004 CLEANING / SWEEPING (OUTSIDE MAIN LANE MI 1,259.400 90.00000 4,443.720 84.80595 7
738 6005 CLEANING / SWEEPING (FRONTAGE ROAD) CYC     24.000 2,000.00000 1
738 6006 CLEANING / SWEEPING (FRONTAGE ROAD) MI 468.840 100.00000 1,175.640 89.27835 4
738 6007 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP CYC     24.000 1,200.00000 1
738 6008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP MI 1,531.220 100.00000 3,706.480 91.86610 4
738 6009 CLEANING / SWEEPING (AGGREGATE REMOVAL MI 251.820 100.00000 758.930 155.31235 7
738 6010 CLEANING / SWEEPING (SPOT) MI 100.000 90.00000 750.000 125.00000 7
738 6011 CLEANING / SWEEPING (HANDWORK) SY 168,721.900 0.15000 377,443.800 0.16541 4
738 6315 CLEANING / SWEEPING (DIRECT CONNECTOR) MI     160.200 225.00000 1
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     330.400 2,191.00484 7
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC     112.900 2,507.82516 7
752 2022 TREE REMOVAL (4" - 12" DIA) EA     1,740.000 65.11494 6
752 2023 TREE REMOVAL (12" - 18" DIA) EA     1,530.000 94.50980 6
752 2024 TREE REMOVAL (18" - 24" DIA) EA     820.000 163.41463 6
752 2025 TREE REMOVAL (24" - 30" DIA) EA     635.000 244.91520 7
752 2026 TREE REMOVAL (30" - 36" DIA) EA     450.000 436.44444 7
752 2027 TREE REMOVAL (36" - 42" DIA) EA     150.000 504.79860 6
752 2028 TREE REMOVAL (42" - 48" DIA) EA     42.000 691.66667 8
752 2029 TREE REMOVAL (48" - 60" DIA) EA     37.000 945.94595 7
752 6003 TREE TRIMMING / BRUSH REMOVAL MI     177.340 1,662.59727 2
752 6004 TREE TRIMMING / BRUSH REMOVAL (CHANNELS AC     20.000 1,695.00000 1
752 6005 TREE REMOVAL (4" - 12" DIA) EA     1,011.000 73.51632 2
752 6006 TREE REMOVAL (12" - 18" DIA) EA     250.000 97.60000 2
752 6007 TREE REMOVAL (18" - 24" DIA) EA     136.000 147.05882 2
752 6008 TREE REMOVAL (24" - 30" DIA) EA     58.000 290.51724 2
752 6009 TREE REMOVAL (30" - 36" DIA) EA     17.000 379.41176 2
752 6010 TREE REMOVAL (36" - 42" DIA) EA     19.000 549.36368 2
752 6011 TREE REMOVAL (42" - 48" DIA) EA     8.000 648.75000 2
752 6012 TREE REMOVAL (48" - 60" DIA) EA     9.000 832.22222 2
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF     300,000.000 1.88667 2
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF     39,700.000 12.84383 3
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     638.000 31.67712 3
770 6003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM LF     1,232.000 33.63636 3
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF     150.000 25.00000 1
770 6006 RAISE RAIL ELEMENT LF     2,650.000 9.83019 3
770 6008 REALIGN EXISTING RAIL LF     2,000.000 10.00000 1
770 6009 REPAIR RAIL ELEMENT (T4S) LF     2,500.000 130.00000 1
770 6010 REM / REPL TIMBER / STL POST W / O CONC FN EA     2,850.000 48.94737 3
770 6011 REM / REPL TIMBER / STL POST W / CONC FN EA     2,510.000 89.90040 2
770 6016 REPAIR STEEL POST WITH BASE PLATE EA     50.000 250.00000 2
770 6017 REALIGN POSTS EA     4,400.000 15.45455 2
770 6019 REMOVE & REPLACE BLOCKOUT EA     1,250.000 23.20000 3
770 6020 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUT EA     50.000 20.00000 1
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     8,900.000 14.10112 3
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA     1,010.000 76.83168 3
770 6024 REPLACE TERMINAL ANCHOR POSTS EA     10.000 250.00000 1
770 6025 REPLACE HINGED TOP SGT STEEL POST EA     10.000 80.00000 1
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA     245.000 2,937.75510 3
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     35.000 815.00000 3
770 6029 REM & RESET SGT IMPACT HEAD EA     210.000 69.04762 3
770 6030 REPLACE SGT CABLE ASSEMBLY EA     60.000 66.66667 3
770 6031 REPLACE SGT CABLE ANCHOR EA     36.000 86.11111 3
770 6032 REPLACE SGT STRUT EA     28.000 86.60714 3
770 6033 REPLACE SGT OBJECT MARKER EA     55.000 50.00000 2
770 6034 REPAIR RAIL ELEMENT (W - BEAM FURNISHED LF     10,000.000 7.00000 1
770 6035 REPAIR RAIL ELEMENT (THRIE - BEAM) (FURN LF     50.000 10.00000 1
770 6042 REM / REPL TIM / STL POST W CONC FND (FURN EA     100.000 80.00000 1
770 6043 REM / REP TIM / STL POST W / O CONC FND (FURN EA     100.000 30.00000 1
770 6044 INSTALL BLOCKOUTS (FURNISHED) EA     500.000 12.00000 1
770 6045 REM & REPLACE BLOCKOUTS (FURNISHED) EA     200.000 10.00000 1
770 6047 REPL SGT IMPACT HEAD (FURNISHED) EA     20.000 100.00000 1
770 6048 REPLACE SINGLE GDRAIL TERM POST (FURN) EA     100.000 40.00000 1
770 6049 REPLACE SGT CABLE ANCHOR (FURN) EA     10.000 5.00000 1
770 6050 REPLACE SGT CABLE ASSEMBLY (FURN) EA     10.000 5.00000 1
770 6051 REPLACE SGT STRUT (FURN) EA     10.000 5.00000 1
770 6052 REPAIR STEEL POST WITH BASE PLATE EA     200.000 250.00000 1
771 6001 REPLACE POSTS (TL - 3) EA     500.000 130.00000 1
771 6002 REPLACE POSTS (TL - 4) EA     200.000 125.00000 1
771 6003 CABLE SPLICE / TURNBUCKLE (TL - 3) EA     10.000 200.00000 1
771 6004 CABLE SPLICE / TURNBUCKLE (TL - 4) EA     20.000 200.00000 1
771 6005 REPAIR CONCRETE FOUNDATION (TL - 3) EA     10.000 50.00000 1
771 6006 REPAIR CONCRETE FOUNDATION (TL - 4) EA     5.000 50.00000 1
771 6007 REPR OR REPLC CABLE BARR TERM SEC (TL - 3 EA     2.000 2,500.00000 1
771 6008 REPR OR REPLC CABLE BARR TERM SEC (TL - 4 EA     20.000 500.00000 1
771 6009 REPLACE CABLE (TL - 3) LF     100.000 5.00000 1