ITEMS 712 2005 TO 774 2009
Items Items Bid Code Range
0104 - 0132
0354 - 0354
0429 - 0496
0500 - 0552
0610 - 0677
0712 - 0774
5953 - 5953
6834 - 6834
7224 - 7284
8251 - 8699
712 2005 - 774 2009
Item No Description Units December 31, 2011 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     416.800 704.67567 2
730 2002 FULL - WIDTH MOWING AC     16,525.000 19.32066 7
734 2001 LITTER REMOVAL AC 850.000 2.67529 2,565.000 4.13372 5
745 2005 JANITORIAL MAINT (PICNIC AREAS) MO     12.000 1,650.00000 1
745 2006 JANITORIAL MAINT (PICNIC AREAS) CYC 434.000 187.00829 1,144.000 181.12902 8
745 2007 GROUNDS MAINT (MOWING / TRIMMING) CYC 43.000 170.88558 110.000 213.71055 8
751 2001 FERTILIZER APPLICATION (SITE A) CYC     2.000 100.00000 1
751 2002 HERBICIDE APPLICATION (SITE A) CYC     7.000 100.00000 1
751 2003 IRRIG SYS OPERATION AND REPAIR (SITE A MO     4.000 200.00000 1
751 2004 LEAF REMOVAL (SITE A) CYC     6.000 250.00000 1
751 2005 LITTER PICKUP (SITE A) CYC     104.000 200.00000 1
751 2006 MOWING, TRIMMING, AND EDGING (SITE A) CYC     14.000 500.00000 1
751 2007 MULCH & RESHAPING OF PLANT BEDS (SITE A CYC     2.000 100.00000 1
751 2008 PLANT BED MAINTENANCE (SITE A) CYC     24.000 150.00000 1
751 2009 PRUNING (SITE A) CYC     2.000 200.00000 1
751 2010 VEGETATIVE WATERING (SITE A) MG     220.000 100.00000 2
760 2002 DITCH CLEAN / RESHAPING (CU YD IN PLACE) CY     3,400.000 10.00000 2
764 2001 DRAIN INLET CLEANING EA     140.000 97.85714 2
764 2006 STORM SEWER CLEANING (PIPE) (12" - 18" DIA LF     4,000.000 4.50000 2
764 2007 STORM SEWER CLEANING (PIPE) (19" - 24" DIA LF     1,000.000 5.00000 1
764 2008 STORM SEWER CLEANING (PIPE) (25" - 30" DIA LF     50.000 5.15000 1
764 2009 STORM SEWER CLEANING (PIPE) (31" - 36" DIA LF     1,750.000 5.25000 2
764 2010 STORM SEWER CLEANING (PIPE) (37" - 42" DIA LF     400.000 5.50000 1
764 2011 STORM SEWER CLEANING (PIPE) (43" - 54" DIA LF     750.000 5.75000 2
764 2012 STORM SEWER CLEANING (PIPE) (55" - 74" DIA LF     1,000.000 6.50000 1
764 2013 STORM SEWER CLEANING (PIPE) (75" - 96" DIA LF     20.000 7.00000 1
764 2020 SLOTTED DRAIN CLEANING LF     130.000 97.69231 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 9,200.000 11.00000 32,250.000 11.20372 3
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 30.000 15.00000 70.000 13.57143 3
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 525.000 30.00000 1,415.000 27.24382 3
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 50.000 50.00000 400.000 41.25000 3
770 2006 REALIGN POSTS EA 380.000 20.00000 2,760.000 16.15942 3
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 2.000 80.00000 9.000 49.44444 3
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 2.000 180.00000 9.000 87.77778 3
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 5.000 1,200.00000 14.000 1,800.00000 3
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 65.000 800.00000 180.000 759.44444 3
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 2,800.000 13.00000 5,940.000 14.13131 3
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 290.000 40.00000 495.000 47.25253 3
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     5.000 50.00000 1
770 2016 REPAIR SINGLE GUARDRAIL TERMINAL EA 15.000 50.00000 53.000 386.98113 2
770 2022 REM & RESET SGT IMPACT HEAD EA     5.000 300.00000 1
770 2023 REPLACE SGT OBJECT MARKER EA     5.000 30.00000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA     100.000 10.00000 1
770 2030 REPAIR RAIL ELEMENT (W - BEAM) (FURNISHED LF 1,100.000 7.00000 1,100.000 7.00000 1
770 2031 INSTALL BLOCKOUT EA 145.000 10.00000 145.000 10.00000 1
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     250.000 18.00000 1
770 2037 REM / REPL TIM POST W / O CONC FND (FURN) EA 138.000 20.00000 138.000 20.00000 1
770 2040 RAISE RAIL ELEMENT LF     100.000 11.00000 1
772 2001 POST AND CABLE FENCE (REMOVAL) LF     500.000 2.00000 1
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA 2.000 180.00000 14.000 117.14286 3
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF 2,500.000 10.00000 2,800.000 10.80000 3
772 2004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA 1.000 200.00000 12.000 130.00000 3
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA 20.000 50.00000 216.000 88.70370 3
772 2007 POST AND CABLE FENCE (REMV / REPL CABLE) LF 1,000.000 7.00000 10,600.000 7.12736 3
774 2001 REMOVE AND REPLACE (TRACC) EA     3.000 2,000.00000 1
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     2.000 11,000.00000 1
774 2007 REPAIR (TRACC) LF     20.000 350.00000 1
774 2009 REPAIR (WIDE TRACC) LF 20.000 500.00000 44.000 295.45455 3
 