AVERAGE LOW BID UNIT PRICE - MAINTENANCE - BROWNWOOD DISTRICT

Last Update: Monday, June 2, 2014
ITEMS 712 2005 TO 776 2041
Items Items Bid Code Range
0104 - 0168
0216 - 0251
0310 - 0354
0401 - 0496
0500 - 0560
0618 - 0690
0712 - 0776
1122 - 1122
3224 - 3280
6055 - 6055
7126 - 7224
8251 - 8852
712 2005 - 776 2041
Item No Description Units May 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     811.180 275.00000 1
730 2001 STRIP MOWING AC     9,802.000 26.25000 1
730 2003 SPOT MOWING AC     500.000 5.00000 1
751 2027 MOWING, TRIMMING, AND EDGING CYC     1.000 8,477.50000 1
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC 30.360 870.00000 30.360 870.00000 1
752 2022 TREE REMOVAL (4" - 12" DIA) EA 437.000 75.00000 437.000 75.00000 1
752 2023 TREE REMOVAL (12" - 18" DIA) EA 152.000 165.00000 152.000 165.00000 1
752 2024 TREE REMOVAL (18" - 24" DIA) EA 83.000 325.00000 83.000 325.00000 1
752 2025 TREE REMOVAL (24" - 30" DIA) EA 25.000 405.00000 25.000 405.00000 1
752 2026 TREE REMOVAL (30" - 36" DIA) EA 25.000 450.00000 25.000 450.00000 1
752 2027 TREE REMOVAL (36" - 42" DIA) EA 20.000 600.00000 20.000 600.00000 1
752 2028 TREE REMOVAL (42" - 48" DIA) EA 20.000 800.00000 20.000 800.00000 1
752 2029 TREE REMOVAL (48" - 60" DIA) EA 10.000 900.00000 10.000 900.00000 1
752 2030 TREE REMOVAL (60" - 72" DIA) EA 10.000 1,100.00000 10.000 1,100.00000 1
752 2055 STUMP REMOVAL (GREATER THAN 12") EA 10.000 175.00000 10.000 175.00000 1
752 2056 TREE REMOVAL (72" - 84" DIA) EA 10.000 1,200.00000 10.000 1,200.00000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     4,000.000 12.00000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     25.000 10.00000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     25.000 10.00000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     600.000 40.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     20.000 50.00000 1
770 2006 REALIGN POSTS EA     150.000 10.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     20.000 650.00000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     600.000 15.00000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     70.000 50.00000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     30.000 85.00000 1
770 2022 REM & RESET SGT IMPACT HEAD EA     15.000 100.00000 1
770 2031 INSTALL BLOCKOUT EA     100.000 7.00000 1
774 2010 REPAIR (REACT) EA     2.000 500.00000 1
776 2021 REPAIR (TY T1 - 101R) LF     50.000 35.00000 1
776 2036 REPAIR (STL POST RETROFIT) EA     20.000 50.00000 1
776 2041 REPAIR (STEEL RAIL) LF     400.000 20.00000 1