AVERAGE LOW BID UNIT PRICE - MAINTENANCE - BROWNWOOD DISTRICT
Last Update: Wednesday, April 3, 2013
| ITEMS 712 2005 TO 784 2017 |
| Item No |
Description |
Units |
March 31, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 712 2005 |
JT / CRCK SEAL (RUBBER - ASPHALT) |
LMI |
|
|
686.400 |
441.00000 |
1 |
| 770 2001 |
REPAIR RAIL ELEMENT (W - BEAM) |
LF |
|
|
4,000.000 |
12.00000 |
1 |
| 770 2002 |
REPAIR RAIL ELEMENT (THRIE - BEAM) |
LF |
|
|
25.000 |
10.00000 |
1 |
| 770 2003 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
LF |
|
|
25.000 |
10.00000 |
1 |
| 770 2004 |
REM / REPL TIMBER / STL POST W / O CONC FND |
EA |
|
|
612.000 |
40.49020 |
2 |
| 770 2005 |
REM / REPL TIMBER / STL POST W / CONC FND |
EA |
|
|
20.000 |
50.00000 |
1 |
| 770 2006 |
REALIGN POSTS |
EA |
|
|
150.000 |
10.00000 |
1 |
| 770 2010 |
REPL SINGLE GDRAIL TERM IMPACT HEAD |
EA |
|
|
20.000 |
650.00000 |
1 |
| 770 2011 |
REPLACE SINGLE GDRAIL TERMINAL RAIL |
LF |
|
|
600.000 |
15.00000 |
1 |
| 770 2012 |
REPLACE SINGLE GDRAIL TERMINAL POST |
EA |
|
|
70.000 |
50.00000 |
1 |
| 770 2014 |
REPAIR STEEL POST WITH BASE PLATE |
EA |
|
|
30.000 |
85.00000 |
1 |
| 770 2022 |
REM & RESET SGT IMPACT HEAD |
EA |
|
|
15.000 |
100.00000 |
1 |
| 770 2031 |
INSTALL BLOCKOUT |
EA |
|
|
100.000 |
7.00000 |
1 |
| 770 2033 |
INSTALL BLOCKOUT |
EA |
|
|
32.000 |
50.00000 |
1 |
| 774 2010 |
REPAIR (REACT) |
EA |
|
|
2.000 |
500.00000 |
1 |
| 776 2014 |
REP METAL POST W / BASE PLATE (T6 RAIL) |
EA |
|
|
60.000 |
80.00000 |
1 |
| 776 2021 |
REPAIR (TY T1 - 101R) |
LF |
|
|
370.000 |
56.62162 |
2 |
| 776 2036 |
REPAIR (STL POST RETROFIT) |
EA |
|
|
20.000 |
50.00000 |
1 |
| 776 2041 |
REPAIR (STEEL RAIL) |
LF |
|
|
400.000 |
20.00000 |
1 |
| 780 2001 |
EPOXY INJECTION (TY IX) |
LF |
|
|
140.000 |
120.00000 |
1 |
| 784 2001 |
REPAIRING STL BRIDGE MEMBER (BEAM) |
EA |
|
|
8.000 |
3,000.00000 |
1 |
| 784 2017 |
REP STL BRIDGE MEMBER (ANGLE PLATES) |
EA |
|
|
24.000 |
500.00000 |
1 |