| AVERAGE LOW BID UNIT PRICE - MAINTENANCE - BROWNWOOD DISTRICT | ||||
| Last Update: Thursday, October 8, 2009 |
| ITEMS 712 2005 TO 780 2001 |
| Items | Items | Bid Code Range |
|---|---|---|
| 0105 - 0164 0316 - 0354 0400 - 0496 0500 - 0540 0672 - 0672 0712 - 0780 |
4013 - 4159 |
712 2005 - 780 2001 |
| Item No | Description | Units | Septembe 30, 2009 | Twelve Month Moving | Usage | ||
|---|---|---|---|---|---|---|---|
| Quantity | Avg Bid | Quantity | Avg Bid | ||||
| 712 2005 | JT / CRCK SEAL (RUBBER - ASPHALT) | LMI | 759.010 | 455.00000 | 1 | ||
| 730 2001 | STRIP MOWING | AC | 9,194.130 | 15.91813 | 2 | ||
| 730 2002 | FULL - WIDTH MOWING | AC | 2,046.700 | 19.64000 | 1 | ||
| 770 2001 | REPAIR RAIL ELEMENT (W - BEAM) | LF | 4,000.000 | 14.00000 | 1 | ||
| 770 2002 | REPAIR RAIL ELEMENT (THRIE - BEAM) | LF | 100.000 | 13.00000 | 1 | ||
| 770 2003 | REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) | LF | 63.000 | 16.00000 | 1 | ||
| 770 2004 | REM / REPL TIMBER / STL POST W / O CONC FND | EA | 400.000 | 35.00000 | 1 | ||
| 770 2006 | REALIGN POSTS | EA | 200.000 | 20.00000 | 1 | ||
| 770 2009 | REMOVE GDRAIL END TRT / REPL WITH SGT | EA | 60.000 | 1,900.00000 | 1 | ||
| 770 2010 | REPL SINGLE GDRAIL TERM IMPACT HEAD | EA | 20.000 | 700.00000 | 1 | ||
| 770 2011 | REPLACE SINGLE GDRAIL TERMINAL RAIL | LF | 800.000 | 15.00000 | 1 | ||
| 770 2012 | REPLACE SINGLE GDRAIL TERMINAL POST | EA | 75.000 | 40.00000 | 1 | ||
| 770 2014 | REPAIR STEEL POST WITH BASE PLATE | EA | 30.000 | 50.00000 | 1 | ||
| 770 2022 | REM & RESET SGT IMPACT HEAD | EA | 30.000 | 150.00000 | 1 | ||
| 770 2031 | INSTALL BLOCKOUT | EA | 400.000 | 10.00000 | 1 | ||
| 774 2001 | REMOVE AND REPLACE (TRACC) | EA | 2.000 | 12,500.00000 | 1 | ||
| 776 2021 | REPAIR (TY T1 - 101R) | LF | 300.000 | 20.00000 | 1 | ||
| 780 2001 | EPOXY INJECTION (TY IX) | LF | 30.000 | 55.00000 | 1 | ||
| | ||||
|