AVERAGE LOW BID UNIT PRICE - MAINTENANCE - AUSTIN DISTRICT

Last Update: Wednesday, April 3, 2013
ITEMS 712 2005 TO 784 2058
Items Items Bid Code Range
0100 - 0169
0247 - 0247
0310 - 0354
0400 - 0496
0500 - 0560
0636 - 0688
0712 - 0784
1122 - 1122
3224 - 3268
4116 - 4491
5278 - 5369
6834 - 6834
7194 - 7424
8020 - 8020
712 2005 - 784 2058
Item No Description Units March 31, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     2,133.792 529.61304 5
730 2001 STRIP MOWING AC     6,376.000 19.14665 3
730 2002 FULL - WIDTH MOWING AC     54,612.000 24.41652 7
730 2003 SPOT MOWING AC     220.000 15.86364 3
734 2004 LITTER REMOVAL - TRACT (1) AC     392.000 10.62000 1
734 2005 LITTER REMOVAL - TRACT (2) AC     918.000 11.54000 1
734 2006 LITTER REMOVAL - TRACT (3) AC     224.000 7.40000 1
734 2007 LITTER REMOVAL - TRACT (4) AC     288.000 17.06000 1
734 2008 LITTER REMOVAL - TRACT (5) AC     532.000 9.75000 1
734 2009 LITTER REMOVAL - TRACT (6) AC     576.000 16.08000 1
734 2010 LITTER REMOVAL - TRACT (7) AC     220.000 11.17000 1
734 2011 LITTER REMOVAL - TRACT (8) AC     232.000 10.73000 1
734 2012 LITTER REMOVAL - TRACT (9) AC     512.000 8.85000 1
734 2013 LITTER REMOVAL - TRACT (10) AC     438.000 11.60000 1
734 2014 LITTER REMOVAL - TRACT (11) AC     204.000 13.29000 1
734 2015 LITTER REMOVAL - TRACT (12) AC     330.000 13.76000 1
734 2016 LITTER REMOVAL - TRACT (13) AC     372.000 11.83000 1
734 2017 LITTER REMOVAL - TRACT (14) AC     318.000 12.40000 1
734 2018 LITTER REMOVAL - TRACT (15) AC     24.000 5.72000 1
734 2019 LITTER REMOVAL - TRACT (16) AC     6.000 7.14000 1
734 2020 LITTER REMOVAL - TRACT (17) AC     42.000 10.50000 1
734 2021 LITTER REMOVAL - TRACT (18) AC     354.000 18.68000 1
734 2022 LITTER REMOVAL - TRACT (19) AC     1,014.000 13.36000 1
734 2023 LITTER REMOVAL - TRACT (20) AC     1,200.000 12.20000 1
734 2024 LITTER REMOVAL - TRACT (21) AC     438.000 18.51000 1
734 2025 LITTER REMOVAL - TRACT (22) AC     336.000 16.93000 1
734 2026 LITTER REMOVAL - TRACT (23) AC     1,320.000 10.73000 1
734 2027 LITTER REMOVAL - TRACT (24) AC     990.000 14.09000 1
734 2028 LITTER REMOVAL - TRACT (25) AC     702.000 16.15000 1
752 2021 TREE TRIMMING / BRUSH REMOVAL (CHANNELS) AC 0.100 20,000.00000 0.100 20,000.00000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF 320.000 25.00000 320.000 25.00000 1
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     70,000.000 9.00000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     100.000 35.25000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     50.000 35.25000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     2,500.000 15.00000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     1,000.000 25.00000 1
770 2006 REALIGN POSTS EA     2,000.000 1.24000 1
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     3.000 78.57000 1
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     5.000 51.00000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     75.000 2,150.00000 1
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     15.000 958.78000 1
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     500.000 36.78000 1
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA     200.000 141.25000 1
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     10.000 10.14000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     10.000 78.87000 1
770 2022 REM & RESET SGT IMPACT HEAD EA     400.000 1.00000 1
770 2023 REPLACE SGT OBJECT MARKER EA     300.000 1.25000 1
770 2024 REPLACE SGT CABLE ANCHOR EA     300.000 1.25000 1
770 2025 REPLACE SGT CABLE ASSEMBLY EA     300.000 1.25000 1
770 2026 REPLACE SGT STRUT EA     250.000 1.25000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA     10.000 97.54000 1
774 2001 REMOVE AND REPLACE (TRACC) EA     3.000 8,900.00000 1
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     2.000 9,900.00000 1
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA     1.000 27,458.00000 1
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA     1.000 32,587.00000 1
774 2005 RMV / REPL (VIA - SAND FILL PLASTIC BARRELS EA     1.000 425.14000 1
774 2006 REPAIR (TRACC) EA     5.000 2,415.24000 1
774 2008 REPAIR (WIDE TRACC) EA     2.000 4,875.54000 1
774 2013 REPAIR (NARROW REACT 350) LF     100.000 359.00000 1
774 2014 REMOVE AND REPLACE (NARROW QUAD) EA     2.000 13,500.00000 1
774 2015 REPAIR (NARROW QUAD) EA     200.000 1,000.00000 1
774 2016 REMOVE AND REPLACE (WIDE QUAD) EA     2.000 24,157.00000 1
774 2017 REPAIR (WIDE QUAD) EA     25.000 2,054.00000 1
774 2030 REPAIR (REACT 350) (W) EA     1.000 13,541.00000 1
774 2031 REPAIR (ENERGY ABSORB SYS) (GDRAIL) EA     20.000 300.00000 1
774 2032 REPAIR (HEX - FOAM SANDWICH SYS) EA     25.000 850.00000 1
774 2048 REPAIR (VIA - SAND FILL PLASTIC BARRELS) EA     5.000 250.00000 1
774 2058 REPAIR (BEAT - SSCC) EA     2.000 1,350.00000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     50.000 50.00000 1
780 2001 EPOXY INJECTION (TY IX) LF 25.000 130.00000 25.000 130.00000 1
784 2009 REPAIRING STL BRIDGE MEMBER (SHOES) EA 1.000 1,000.00000 1.000 1,000.00000 1
784 2011 REP STL BRIDGE MEMBER (BOTTOM CHORD) EA 15.000 2,800.00000 15.000 2,800.00000 1
784 2058 REP STL BRIDGE MEMBER (FLOORBEAM) EA 11.000 1,400.00000 11.000 1,400.00000 1