| Item No |
Description |
Units |
March 31, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 712 2005 |
JT / CRCK SEAL (RUBBER - ASPHALT) |
LMI |
|
|
2,133.792 |
529.61304 |
5 |
| 730 2001 |
STRIP MOWING |
AC |
|
|
6,376.000 |
19.14665 |
3 |
| 730 2002 |
FULL - WIDTH MOWING |
AC |
|
|
54,612.000 |
24.41652 |
7 |
| 730 2003 |
SPOT MOWING |
AC |
|
|
220.000 |
15.86364 |
3 |
| 734 2004 |
LITTER REMOVAL - TRACT (1) |
AC |
|
|
392.000 |
10.62000 |
1 |
| 734 2005 |
LITTER REMOVAL - TRACT (2) |
AC |
|
|
918.000 |
11.54000 |
1 |
| 734 2006 |
LITTER REMOVAL - TRACT (3) |
AC |
|
|
224.000 |
7.40000 |
1 |
| 734 2007 |
LITTER REMOVAL - TRACT (4) |
AC |
|
|
288.000 |
17.06000 |
1 |
| 734 2008 |
LITTER REMOVAL - TRACT (5) |
AC |
|
|
532.000 |
9.75000 |
1 |
| 734 2009 |
LITTER REMOVAL - TRACT (6) |
AC |
|
|
576.000 |
16.08000 |
1 |
| 734 2010 |
LITTER REMOVAL - TRACT (7) |
AC |
|
|
220.000 |
11.17000 |
1 |
| 734 2011 |
LITTER REMOVAL - TRACT (8) |
AC |
|
|
232.000 |
10.73000 |
1 |
| 734 2012 |
LITTER REMOVAL - TRACT (9) |
AC |
|
|
512.000 |
8.85000 |
1 |
| 734 2013 |
LITTER REMOVAL - TRACT (10) |
AC |
|
|
438.000 |
11.60000 |
1 |
| 734 2014 |
LITTER REMOVAL - TRACT (11) |
AC |
|
|
204.000 |
13.29000 |
1 |
| 734 2015 |
LITTER REMOVAL - TRACT (12) |
AC |
|
|
330.000 |
13.76000 |
1 |
| 734 2016 |
LITTER REMOVAL - TRACT (13) |
AC |
|
|
372.000 |
11.83000 |
1 |
| 734 2017 |
LITTER REMOVAL - TRACT (14) |
AC |
|
|
318.000 |
12.40000 |
1 |
| 734 2018 |
LITTER REMOVAL - TRACT (15) |
AC |
|
|
24.000 |
5.72000 |
1 |
| 734 2019 |
LITTER REMOVAL - TRACT (16) |
AC |
|
|
6.000 |
7.14000 |
1 |
| 734 2020 |
LITTER REMOVAL - TRACT (17) |
AC |
|
|
42.000 |
10.50000 |
1 |
| 734 2021 |
LITTER REMOVAL - TRACT (18) |
AC |
|
|
354.000 |
18.68000 |
1 |
| 734 2022 |
LITTER REMOVAL - TRACT (19) |
AC |
|
|
1,014.000 |
13.36000 |
1 |
| 734 2023 |
LITTER REMOVAL - TRACT (20) |
AC |
|
|
1,200.000 |
12.20000 |
1 |
| 734 2024 |
LITTER REMOVAL - TRACT (21) |
AC |
|
|
438.000 |
18.51000 |
1 |
| 734 2025 |
LITTER REMOVAL - TRACT (22) |
AC |
|
|
336.000 |
16.93000 |
1 |
| 734 2026 |
LITTER REMOVAL - TRACT (23) |
AC |
|
|
1,320.000 |
10.73000 |
1 |
| 734 2027 |
LITTER REMOVAL - TRACT (24) |
AC |
|
|
990.000 |
14.09000 |
1 |
| 734 2028 |
LITTER REMOVAL - TRACT (25) |
AC |
|
|
702.000 |
16.15000 |
1 |
| 752 2021 |
TREE TRIMMING / BRUSH REMOVAL (CHANNELS) |
AC |
0.100 |
20,000.00000 |
0.100 |
20,000.00000 |
1 |
| 760 2001 |
DITCH CLEANING AND RESHAPING (FOOT) |
LF |
320.000 |
25.00000 |
320.000 |
25.00000 |
1 |
| 770 2001 |
REPAIR RAIL ELEMENT (W - BEAM) |
LF |
|
|
70,000.000 |
9.00000 |
1 |
| 770 2002 |
REPAIR RAIL ELEMENT (THRIE - BEAM) |
LF |
|
|
100.000 |
35.25000 |
1 |
| 770 2003 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
LF |
|
|
50.000 |
35.25000 |
1 |
| 770 2004 |
REM / REPL TIMBER / STL POST W / O CONC FND |
EA |
|
|
2,500.000 |
15.00000 |
1 |
| 770 2005 |
REM / REPL TIMBER / STL POST W / CONC FND |
EA |
|
|
1,000.000 |
25.00000 |
1 |
| 770 2006 |
REALIGN POSTS |
EA |
|
|
2,000.000 |
1.24000 |
1 |
| 770 2007 |
REPAIR OF TERMINAL ANCHORS POSTS |
EA |
|
|
3.000 |
78.57000 |
1 |
| 770 2008 |
REPLACE TERMINAL ANCHOR POSTS |
EA |
|
|
5.000 |
51.00000 |
1 |
| 770 2009 |
REMOVE GDRAIL END TRT / REPL WITH SGT |
EA |
|
|
75.000 |
2,150.00000 |
1 |
| 770 2010 |
REPL SINGLE GDRAIL TERM IMPACT HEAD |
EA |
|
|
15.000 |
958.78000 |
1 |
| 770 2011 |
REPLACE SINGLE GDRAIL TERMINAL RAIL |
LF |
|
|
500.000 |
36.78000 |
1 |
| 770 2012 |
REPLACE SINGLE GDRAIL TERMINAL POST |
EA |
|
|
200.000 |
141.25000 |
1 |
| 770 2013 |
REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS |
EA |
|
|
10.000 |
10.14000 |
1 |
| 770 2014 |
REPAIR STEEL POST WITH BASE PLATE |
EA |
|
|
10.000 |
78.87000 |
1 |
| 770 2022 |
REM & RESET SGT IMPACT HEAD |
EA |
|
|
400.000 |
1.00000 |
1 |
| 770 2023 |
REPLACE SGT OBJECT MARKER |
EA |
|
|
300.000 |
1.25000 |
1 |
| 770 2024 |
REPLACE SGT CABLE ANCHOR |
EA |
|
|
300.000 |
1.25000 |
1 |
| 770 2025 |
REPLACE SGT CABLE ASSEMBLY |
EA |
|
|
300.000 |
1.25000 |
1 |
| 770 2026 |
REPLACE SGT STRUT |
EA |
|
|
250.000 |
1.25000 |
1 |
| 770 2027 |
REMOVE & REPLACE BLOCKOUT |
EA |
|
|
10.000 |
97.54000 |
1 |
| 774 2001 |
REMOVE AND REPLACE (TRACC) |
EA |
|
|
3.000 |
8,900.00000 |
1 |
| 774 2002 |
REMOVE AND REPLACE (WIDE TRACC) |
EA |
|
|
2.000 |
9,900.00000 |
1 |
| 774 2003 |
REMOVE AND REPLACE (NARROW REACT 350) |
EA |
|
|
1.000 |
27,458.00000 |
1 |
| 774 2004 |
REMOVE AND REPLACE (WIDE REACT 350) |
EA |
|
|
1.000 |
32,587.00000 |
1 |
| 774 2005 |
RMV / REPL (VIA - SAND FILL PLASTIC BARRELS |
EA |
|
|
1.000 |
425.14000 |
1 |
| 774 2006 |
REPAIR (TRACC) |
EA |
|
|
5.000 |
2,415.24000 |
1 |
| 774 2008 |
REPAIR (WIDE TRACC) |
EA |
|
|
2.000 |
4,875.54000 |
1 |
| 774 2013 |
REPAIR (NARROW REACT 350) |
LF |
|
|
100.000 |
359.00000 |
1 |
| 774 2014 |
REMOVE AND REPLACE (NARROW QUAD) |
EA |
|
|
2.000 |
13,500.00000 |
1 |
| 774 2015 |
REPAIR (NARROW QUAD) |
EA |
|
|
200.000 |
1,000.00000 |
1 |
| 774 2016 |
REMOVE AND REPLACE (WIDE QUAD) |
EA |
|
|
2.000 |
24,157.00000 |
1 |
| 774 2017 |
REPAIR (WIDE QUAD) |
EA |
|
|
25.000 |
2,054.00000 |
1 |
| 774 2030 |
REPAIR (REACT 350) (W) |
EA |
|
|
1.000 |
13,541.00000 |
1 |
| 774 2031 |
REPAIR (ENERGY ABSORB SYS) (GDRAIL) |
EA |
|
|
20.000 |
300.00000 |
1 |
| 774 2032 |
REPAIR (HEX - FOAM SANDWICH SYS) |
EA |
|
|
25.000 |
850.00000 |
1 |
| 774 2048 |
REPAIR (VIA - SAND FILL PLASTIC BARRELS) |
EA |
|
|
5.000 |
250.00000 |
1 |
| 774 2058 |
REPAIR (BEAT - SSCC) |
EA |
|
|
2.000 |
1,350.00000 |
1 |
| 776 2001 |
REPAIR (STEEL POST W / W - BEAM - T101) |
LF |
|
|
50.000 |
50.00000 |
1 |
| 780 2001 |
EPOXY INJECTION (TY IX) |
LF |
25.000 |
130.00000 |
25.000 |
130.00000 |
1 |
| 784 2009 |
REPAIRING STL BRIDGE MEMBER (SHOES) |
EA |
1.000 |
1,000.00000 |
1.000 |
1,000.00000 |
1 |
| 784 2011 |
REP STL BRIDGE MEMBER (BOTTOM CHORD) |
EA |
15.000 |
2,800.00000 |
15.000 |
2,800.00000 |
1 |
| 784 2058 |
REP STL BRIDGE MEMBER (FLOORBEAM) |
EA |
11.000 |
1,400.00000 |
11.000 |
1,400.00000 |
1 |