| Item No |
Description |
Units |
Septembe 30, 2009 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 700 2001 |
POTHOLE REPAIR (STANDARD) |
SY |
|
|
150.000 |
74.00000 |
1 |
| 712 2005 |
JT / CRCK SEAL (RUBBER - ASPHALT) |
LMI |
|
|
496.816 |
519.46197 |
3 |
| 730 2002 |
FULL - WIDTH MOWING |
AC |
|
|
55,010.000 |
34.28717 |
2 |
| 730 2003 |
SPOT MOWING |
AC |
|
|
300.000 |
46.66667 |
2 |
| 734 2001 |
LITTER REMOVAL |
AC |
8,864.000 |
6.81000 |
711,271.000 |
6.54297 |
13 |
| 734 2003 |
LITTER REMOVAL (SPOT) |
AC |
|
|
40.000 |
27.40000 |
1 |
| 734 2010 |
LITTER REMOVAL - TRACT (7) |
AC |
|
|
500.000 |
7.45000 |
1 |
| 735 2002 |
DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES |
MI |
|
|
16,054.000 |
30.00000 |
1 |
| 735 2004 |
DEBRIS REMOVAL (FRONTAGE ROADS) |
MI |
|
|
12,747.000 |
30.00000 |
1 |
| 735 2006 |
DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) |
MI |
|
|
6,445.000 |
31.00000 |
1 |
| 735 2007 |
DEBRIS REMOVAL (SPOT DEBRIS) |
MI |
|
|
570.000 |
55.00000 |
1 |
| 735 2131 |
DEBRIS REMOVAL (DIRECT CONNECTOR RAMP) |
MI |
|
|
4,541.000 |
30.00000 |
1 |
| 738 2002 |
CLEANING / SWEEPING (CENTER MEDIAN) |
MI |
|
|
15,129.000 |
105.22097 |
2 |
| 738 2004 |
CLEANING / SWEEPING (OUTSIDE MAIN LANE) |
MI |
|
|
16,169.000 |
104.57320 |
2 |
| 738 2006 |
CLEANING / SWEEPING (FRONTAGE ROAD) |
MI |
|
|
9,417.000 |
96.65923 |
2 |
| 738 2008 |
CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) |
MI |
|
|
9,354.000 |
106.67094 |
2 |
| 738 2009 |
CLEANING / SWEEPING (AGGREGATE REMOVAL) |
MI |
|
|
397.000 |
232.61965 |
2 |
| 738 2010 |
CLEANING / SWEEPING (SPOT) |
MI |
|
|
140.000 |
217.14286 |
2 |
| 738 2011 |
CLEANING / SWEEPING (HANDWORK) |
SY |
|
|
11,217.000 |
4.35290 |
2 |
| 738 2221 |
DIRECT CONNECTOR CLEAN AND SWEEP (RAMP |
MI |
|
|
1,100.000 |
130.00000 |
1 |
| 740 2001 |
GRAFFITI REMOVAL (BLAST CLEANING) |
SF |
|
|
3,000.000 |
1.25000 |
1 |
| 740 2002 |
GRAFFITI REMOVAL (PAINTING) |
SF |
|
|
1,500.000 |
2.40000 |
1 |
| 740 2003 |
GRAFFITI REMOVAL (CHEMICAL CLEANING) |
SF |
|
|
500.000 |
5.00000 |
1 |
| 745 2006 |
JANITORIAL MAINT (PICNIC AREAS) |
CYC |
|
|
624.000 |
519.47333 |
3 |
| 745 2007 |
GROUNDS MAINT (MOWING / TRIMMING) |
CYC |
|
|
102.000 |
504.00000 |
3 |
| 751 2003 |
IRRIG SYS OPERATION AND REPAIR (SITE A |
MO |
|
|
36.000 |
4,200.00000 |
1 |
| 751 2007 |
MULCH & RESHAPING OF PLANT BEDS (SITE A |
CYC |
|
|
18.000 |
5,700.00000 |
1 |
| 751 2008 |
PLANT BED MAINTENANCE (SITE A) |
CYC |
|
|
18.000 |
5,600.00000 |
1 |
| 751 2013 |
IRRIG SYS OPERATION & REPAIR (SITE B) |
MO |
|
|
36.000 |
4,200.00000 |
1 |
| 751 2017 |
MULCHING & RESHAPING PLANT BEDS (SITE B |
CYC |
|
|
18.000 |
5,700.00000 |
1 |
| 751 2018 |
PLANT BED MAINTENANCE (SITE B) |
CYC |
|
|
18.000 |
5,600.00000 |
1 |
| 751 2075 |
PLANT BED MAINTENANCE (SITE C) |
CYC |
|
|
18.000 |
1,350.00000 |
1 |
| 751 2076 |
PLANT BED MAINTENANCE (SITE D) |
CYC |
|
|
6.000 |
2,700.00000 |
1 |
| 751 2078 |
IRRIG SYS OP & REPAIR (SITE C) |
MO |
|
|
36.000 |
1,800.00000 |
1 |
| 751 2079 |
IRRIG SYS OP & REPAIR (SITE D) |
MO |
|
|
12.000 |
1,850.00000 |
1 |
| 751 2080 |
MULCH & RESHAPE PLANTBEDS (SITE C) |
CYC |
|
|
18.000 |
1,500.00000 |
1 |
| 751 2081 |
MUCLH & RESHAPE PLANTBEDS (SITE D) |
CYC |
|
|
6.000 |
2,750.00000 |
1 |
| 752 2018 |
TREE TRIMMING |
MI |
|
|
32.000 |
700.00000 |
1 |
| 752 2021 |
TREE TRIMMING / BRUSH REMOVAL (CHANNELS) |
AC |
|
|
32.000 |
1,650.00000 |
1 |
| 760 2001 |
DITCH CLEANING AND RESHAPING (FOOT) |
LF |
|
|
3,500.000 |
3.65000 |
1 |
| 764 2001 |
DRAIN INLET CLEANING |
EA |
|
|
2,125.000 |
66.72941 |
2 |
| 764 2004 |
DOWNSPOUT CLEANING |
EA |
|
|
2,945.000 |
94.44822 |
2 |
| 764 2006 |
STORM SEWER CLEANING (PIPE) (12" - 18" DIA |
LF |
|
|
1,200.000 |
4.70000 |
1 |
| 764 2007 |
STORM SEWER CLEANING (PIPE) (19" - 24" DIA |
LF |
|
|
1,200.000 |
4.70000 |
1 |
| 764 2008 |
STORM SEWER CLEANING (PIPE) (25" - 30" DIA |
LF |
|
|
1,200.000 |
4.70000 |
1 |
| 764 2010 |
STORM SEWER CLEANING (PIPE) (37" - 42" DIA |
LF |
|
|
1,000.000 |
5.60000 |
1 |
| 770 2001 |
REPAIR RAIL ELEMENT (W - BEAM) |
LF |
|
|
174,400.000 |
10.50416 |
4 |
| 770 2002 |
REPAIR RAIL ELEMENT (THRIE - BEAM) |
LF |
|
|
750.000 |
27.69067 |
4 |
| 770 2003 |
REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) |
LF |
|
|
150.000 |
18.23000 |
3 |
| 770 2004 |
REM / REPL TIMBER / STL POST W / O CONC FND |
EA |
|
|
5,760.000 |
44.88542 |
4 |
| 770 2005 |
REM / REPL TIMBER / STL POST W / CONC FND |
EA |
|
|
3,025.000 |
39.08264 |
4 |
| 770 2006 |
REALIGN POSTS |
EA |
|
|
4,020.000 |
4.50249 |
4 |
| 770 2007 |
REPAIR OF TERMINAL ANCHORS POSTS |
EA |
|
|
9.000 |
70.98333 |
3 |
| 770 2008 |
REPLACE TERMINAL ANCHOR POSTS |
EA |
|
|
45.000 |
151.63000 |
3 |
| 770 2009 |
REMOVE GDRAIL END TRT / REPL WITH SGT |
EA |
|
|
95.000 |
2,235.40211 |
3 |
| 770 2013 |
REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS |
EA |
|
|
30.000 |
10.67333 |
3 |
| 770 2014 |
REPAIR STEEL POST WITH BASE PLATE |
EA |
|
|
37.000 |
63.55676 |
4 |
| 770 2016 |
REPAIR SINGLE GUARDRAIL TERMINAL |
EA |
|
|
1,245.000 |
970.68273 |
4 |
| 774 2001 |
REMOVE AND REPLACE (TRACC) |
EA |
|
|
4.000 |
10,250.00000 |
2 |
| 774 2002 |
REMOVE AND REPLACE (WIDE TRACC) |
EA |
|
|
3.000 |
11,733.33333 |
2 |
| 774 2003 |
REMOVE AND REPLACE (NARROW REACT 350) |
EA |
|
|
2.000 |
23,000.00000 |
2 |
| 774 2004 |
REMOVE AND REPLACE (WIDE REACT 350) |
EA |
|
|
2.000 |
42,500.00000 |
2 |
| 774 2005 |
RMV / REPL (VIA - SAND FILL PLASTIC BARRELS |
EA |
|
|
5.000 |
2,000.00000 |
1 |
| 774 2006 |
REPAIR (TRACC) |
EA |
|
|
21.000 |
2,428.57143 |
2 |
| 774 2008 |
REPAIR (WIDE TRACC) |
EA |
|
|
6.000 |
4,333.33333 |
2 |
| 774 2010 |
REPAIR (REACT) |
EA |
|
|
1.000 |
1,000.00000 |
1 |
| 774 2011 |
REPAIR (CATCB - FRNT SECT) |
EA |
|
|
2.000 |
2,000.00000 |
1 |
| 774 2012 |
REPAIR (CATCB - REAR SECT) |
EA |
|
|
2.000 |
500.00000 |
1 |
| 774 2013 |
REPAIR (NARROW REACT 350) |
LF |
|
|
100.000 |
400.00000 |
1 |
| 774 2014 |
REMOVE AND REPLACE (NARROW QUAD) |
EA |
|
|
10.000 |
13,900.00000 |
2 |
| 774 2015 |
REPAIR (NARROW QUAD) |
EA |
|
|
603.000 |
1,367.08126 |
2 |
| 774 2016 |
REMOVE AND REPLACE (WIDE QUAD) |
EA |
|
|
10.000 |
17,200.00000 |
2 |
| 774 2017 |
REPAIR (WIDE QUAD) |
EA |
|
|
123.000 |
1,492.68293 |
2 |
| 774 2018 |
REPAIR (CATGR - FRONT SECTION) |
EA |
|
|
1.000 |
4,000.00000 |
1 |
| 774 2019 |
REPAIR (CATGR - END SECTION) |
EA |
|
|
1.000 |
2,000.00000 |
1 |
| 774 2022 |
REMOVE AND REPLACE (CATGR) |
EA |
|
|
1.000 |
4,500.00000 |
1 |
| 774 2030 |
REPAIR (REACT 350) (W) |
EA |
|
|
1.000 |
10,000.00000 |
1 |
| 774 2031 |
REPAIR (ENERGY ABSORB SYS) (GDRAIL) |
EA |
|
|
20.000 |
450.00000 |
1 |
| 774 2032 |
REPAIR (HEX - FOAM SANDWICH SYS) |
EA |
|
|
75.000 |
900.00000 |
1 |
| 774 2048 |
REPAIR (VIA - SAND FILL PLASTIC BARRELS) |
EA |
|
|
5.000 |
250.00000 |
1 |
| 774 2058 |
REPAIR (BEAT - SSCC) |
EA |
|
|
5.000 |
840.00000 |
2 |
| 776 2001 |
REPAIR (STEEL POST W / W - BEAM - T101) |
LF |
|
|
37.000 |
71.57432 |
4 |
| 780 2001 |
EPOXY INJECTION (TY IX) |
LF |
|
|
20.000 |
50.00000 |
1 |
| 788 2001 |
CONCRETE BEAM REPAIR |
EA |
|
|
2.000 |
34,132.50000 |
2 |