AVERAGE LOW BID UNIT PRICE - MAINTENANCE - AUSTIN DISTRICT

Last Update: Friday, August 21, 2015
ITEMS 712 2005 TO 780 2001
Items Items Bid Code Range
0100 - 0169
0316 - 0354
0401 - 0496
0500 - 0545
0618 - 0690
0712 - 0780
1122 - 1122
2302 - 2303
3002 - 3283
4002 - 4116
5434 - 5434
6001 - 6834
7126 - 7424
8020 - 8851
712 2005 - 780 2001
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,018.876 508.64723 4
730 2002 FULL - WIDTH MOWING AC     15,052.000 36.50000 1
730 2003 SPOT MOWING AC     400.000 30.00000 2
730 2004 STRIP MOWING - TRACT (1) AC     3,656.000 39.00000 2
730 2056 FULL - WIDTH MOWING - TRACT (1) AC     22,264.000 59.00000 2
730 2057 FULL - WIDTH MOWING - TRACT (2) AC     10,356.000 40.00000 2
738 6002 CLEANING / SWEEPING (CENTER MEDIAN) MI     2,256.000 145.00000 2
738 6004 CLEANING / SWEEPING (OUTSIDE MAIN LANE MI     3,024.000 145.00000 2
738 6006 CLEANING / SWEEPING (FRONTAGE ROAD) MI     576.000 100.00000 2
738 6008 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP MI     1,104.000 100.00000 2
738 6009 CLEANING / SWEEPING (AGGREGATE REMOVAL MI     150.000 75.00000 2
738 6010 CLEANING / SWEEPING (SPOT) MI     100.000 75.00000 2
738 6011 CLEANING / SWEEPING (HANDWORK) SY     2,000.000 1.00000 2
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     124.440 1,844.21408 2
752 2022 TREE REMOVAL (4" - 12" DIA) EA     37.000 100.00000 1
752 2023 TREE REMOVAL (12" - 18" DIA) EA     153.000 66.40523 2
752 2024 TREE REMOVAL (18" - 24" DIA) EA     95.000 118.94737 2
752 2025 TREE REMOVAL (24" - 30" DIA) EA     14.000 428.57143 2
752 2026 TREE REMOVAL (30" - 36" DIA) EA     6.000 406.66667 2
752 2027 TREE REMOVAL (36" - 42" DIA) EA     3.000 635.00000 2
752 2028 TREE REMOVAL (42" - 48" DIA) EA     1.000 450.00000 1
752 2029 TREE REMOVAL (48" - 60" DIA) EA     1.000 500.00000 1
752 2050 TREE REMOVAL (4" - 8") DIA EA     294.000 50.00000 1
752 2051 TREE REMOVAL (8" - 12") DIA EA     81.000 60.00000 1
752 2053 TREE TRIMMING EA     10.000 40.00000 1
752 2056 TREE REMOVAL (72" - 84" DIA) EA     2.000 800.00000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF     2,006.000 9.50000 2
764 2001 DRAIN INLET CLEANING EA     83.000 250.00000 1
764 2004 DOWNSPOUT CLEANING EA     83.000 350.00000 1
764 6001 DRAIN INLET CLEANING EA     160.000 50.00000 2
764 6004 DOWNSPOUT CLEANING EA     60.000 75.00000 2
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF     13,000.000 12.89000 1
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     100.000 31.24000 1
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF     100.000 22.04000 1
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA     2,000.000 1.25000 1
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA     600.000 1.28000 1
770 2006 REALIGN POSTS EA     500.000 2.58000 1
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA     3.000 1.58000 1
770 2008 REPLACE TERMINAL ANCHOR POSTS EA     10.000 1.25000 1
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA     50.000 1,805.58000 1
770 2013 REPLACE STL BLOCKOUTS W / WOOD BLOCKOUTS EA     50.000 1.44000 1
770 2014 REPAIR STEEL POST WITH BASE PLATE EA     20.000 51.27000 1
770 2016 REPAIR SINGLE GUARDRAIL TERMINAL EA     150.000 2,020.23000 1
770 2027 REMOVE & REPLACE BLOCKOUT EA     2,500.000 0.69000 1
770 2028 REPLACE HINGED TOP SGT STEEL POST EA     5.000 58.58000 1
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF     150.000 168.45000 1
774 2001 REMOVE AND REPLACE (TRACC) EA     1.000 8,124.78000 1
774 2002 REMOVE AND REPLACE (WIDE TRACC) EA     1.000 9,058.47000 1
774 2003 REMOVE AND REPLACE (NARROW REACT 350) EA     1.000 8,009.33000 1
774 2004 REMOVE AND REPLACE (WIDE REACT 350) EA     1.000 9,125.52000 1
774 2006 REPAIR (TRACC) EA     1.000 1,204.45000 1
774 2008 REPAIR (WIDE TRACC) EA     1.000 1,405.24000 1
774 2013 REPAIR (NARROW REACT 350) LF     1.000 1,008.99000 1
774 2014 REMOVE AND REPLACE (NARROW QUAD) EA     1.000 15,020.45000 1
774 2015 REPAIR (NARROW QUAD) EA     4.000 1,532.78000 1
774 2016 REMOVE AND REPLACE (WIDE QUAD) EA     1.000 10,058.25000 1
774 2017 REPAIR (WIDE QUAD) EA     2.000 1,025.87000 1
774 2030 REPAIR (REACT 350) (W) EA     1.000 578.98000 1
774 2031 REPAIR (ENERGY ABSORB SYS) (GDRAIL) EA     1.000 502.54000 1
774 2058 REPAIR (BEAT - SSCC) EA     1.000 205.25000 1
776 2001 REPAIR (STEEL POST W / W - BEAM - T101) LF     30.000 25.45000 1
780 2001 EPOXY INJECTION (TY IX) LF     48.000 395.00000 2