AVERAGE LOW BID UNIT PRICE - MAINTENANCE - ABILENE DISTRICT

Last Update: Monday, February 8, 2016
ITEMS 712 2005 TO 788 6001
Items Items Bid Code Range
0104 - 0132
0247 - 0275
0310 - 0330
0400 - 0454
0500 - 0545
0658 - 0678
0712 - 0788
4013 - 4013
6038 - 6040
712 2005 - 788 6001
Item No Description Units January 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,805.900 370.52511 3
712 6008 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,571.980 618.81540 3
730 6001 STRIP MOWING AC 13,181.000 30.68556 13,181.000 30.68556 13
730 6002 FULL - WIDTH MOWING AC 66,273.000 30.85497 66,273.000 30.85497 14
730 6003 SPOT MOWING AC 150.000 31.81667 150.000 31.81667 3
734 6001 LITTER REMOVAL AC 24,639.000 12.77803 24,639.000 12.77803 10
745 2010 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (1) CYC     16.000 209.00000 2
745 2011 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (2) CYC     16.000 209.00000 2
745 2100 JANITORIAL MAINT - PICNIC AREA - SITE (1) CYC     208.000 129.00000 2
745 2101 JANITORIAL MAINT - PICNIC AREA - SITE (2) CYC     208.000 129.00000 2
751 2026 LITTER PICKUP AC     1,176.400 44.15386 3
751 2028 MOWING, TRIMMING, AND EDGING AC     1,176.340 45.75548 3
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF     30,275.000 15.21016 5
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     99.000 11.36364 5
770 6003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM LF     57.000 5.42105 5
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF     390.000 37.41026 5
770 6006 RAISE RAIL ELEMENT LF     225.000 8.00000 5
770 6010 REM / REPL TIMBER / STL POST W / O CONC FN EA     1,505.000 30.16611 5
770 6011 REM / REPL TIMBER / STL POST W / CONC FN EA     1,150.000 23.69565 5
770 6017 REALIGN POSTS EA     750.000 5.46667 5
770 6018 INSTALL BLOCKOUT (TYPE SPECIFIED) EA     1,040.000 3.05769 5
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     2,150.000 25.93023 5
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA     265.000 74.73585 5
770 6023 REPAIR OF TERMINAL ANCHORS POSTS EA     25.000 1.00000 5
770 6024 REPLACE TERMINAL ANCHOR POSTS EA     25.000 1.00000 5
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA     145.000 2,665.51724 5
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     55.000 772.72727 5
770 6029 REM & RESET SGT IMPACT HEAD EA     47.000 246.80851 5
770 6030 REPLACE SGT CABLE ASSEMBLY EA     38.000 13.89474 5
770 6031 REPLACE SGT CABLE ANCHOR EA     30.000 17.33333 5
770 6032 REPLACE SGT STRUT EA     30.000 17.33333 5
770 6033 REPLACE SGT OBJECT MARKER EA     30.000 17.33333 5
771 6002 REPLACE POSTS (TL - 4) EA     3,650.000 99.10959 3
771 6004 CABLE SPLICE / TURNBUCKLE (TL - 4) EA     55.000 104.54545 3
771 6006 REPAIR CONCRETE FOUNDATION (TL - 4) EA     28.000 8.00000 3
771 6008 REPR OR REPLC CABLE BARR TERM SEC (TL - 4 EA     45.000 233.33333 3
771 6010 REPLACE CABLE (TL - 4) LF     5,320.000 0.77068 3
778 6002 CONCRETE RAIL REPAIR (MISC) LF     150.000 100.00000 3
778 6023 CONCRETE POST REPAIR EA     125.000 76.00000 5
778 6024 CONCRETE POST REPLACEMENT EA     75.000 90.00000 5
784 6001 REP STL BRIDGE MEMBERS LS     2.000 76,000.00000 2
784 6003 REP STL BRIDGE MEMBER (DIAPHRAGM) EA     4.000 2,500.00000 2
786 6002 CARBON FIBER REINF POLYMER STRENGTHNIN SF     580.000 75.00000 2
788 6001 CONCRETE BEAM REPAIR EA     6.000 6,000.00000 2