TxDOT, in partnership with Kendall County and the city of Boerne, is conducting the Kendall Gateway Study, a feasibility study that has been undertaken to identify potential alternatives to relieve traffic congestion in Kendall County and city of Boerne. The Kendall Gateway Study was created by a joint resolution between Kendall County and the city of Boerne. The primary goal of the study is to identify solutions that could provide improved mobility as the area continues to grow. The study area is within Kendall County, Texas.
Key elements of the study include the following:
- Engage study area stakeholders, public and other agencies about transportation problems and possible solutions
- Inventory existing transportation system features, environmental resources, traffic origin and destination, operating conditions, and safety issues
- Analyze current and future traffic forecasts and travel demand modeling
- Develop conceptual transportation improvements and cost estimates, and identify potential effects and cost-benefit for each improvement
- Provide a Feasibility Study Report at the conclusion of the study toument study data, methodology, results, recommendations, and an implementation plan
Get involved
Your input is a key part of the study process. Public involvement opportunities will be provided throughout the study process. In addition to the interactive survey above, TxDOT held an open house on Jan. 17, 2017 and hosted the second open house on Nov. 8, 2017. It is anticpated the third open house will be in late Spring of 2018.
Downloads
- Kendall Gateway Feasibility Report
- Appendix A: Initial Traffic Study
- Appendix B: Traffic Modeling Results
- Appendix C: Summary of Traffic Modeling
- Appendix D: Public Involvement Summary
- Appendix D1: Technical Work Group (TWG) #1 Kendall Gateway Study (KGS) Meeting Report
- Appendix D2: Stakeholder Work Group (SWG) #1 KGS Meeting Report
- Appendix D3: Public Meeting (PM) #1 KGS Meeting Report
- Appendix D4: TWG #2 KGS Meeting Report
- Appendix D5: SWG #2 KGS Meeting Report
- Appendix D6: TWG #3 SWG #3 KGS Meeting Report
- Appendix D7: PM#2 KGS Meeting Report
- Appendix D8: MetroQuest KGS Report
- Appendix D9: TWG#4 SWG #4 KGS Meeting Report
- Appendix D10: PM #3 KGS Meeting Report
- Appendix D11: Kendall Gateway Study FAQs
- Appendix E: Study Area Photographs
- Appendix F: Study Area Exhibits with Environmental Constraints
- Appendix G: Kendall Gateway Recommended Concepts Mapbook with Environmental Constraints Appendix H: Concept Maps
- Appendix I: Itemized Cost Estimate
- Appendix J: KGS ROW Preservation Memorandum
- Appendix K: Constraints Map
- Newsletter Vol. 1 - 2017
- Newsletter Vol. 2 - 2017
- Newsletter Vol. 3 - 2018
- Frequently Asked Questions -March 2018
- Frequently Asked Questions - October 2018
- Online Survey Results - 2018
- Documentation of Open House - Jan. 17, 2017
- Documentation of Open House - Nov. 8, 2017
- Northwest Concepts - Feb. 2018
- Northeast Concepts – Feb. 2018
- Southwest Concepts - Feb. 2018
- Southeast Concepts – Feb. 2018
- Public Involvement Photo Gallery
- Public Outreach and Involvement Statistics
- Study Overview
- Northeast Recommended Concept Map
- Northwest Recommended Concept Map
- Southeast Recommended Concept Map
- Southwest Recommended Concept Map
- Recommended Concepts Map
- Documentation of Open House - May 23, 2018
- Boerne City Council and Kendall County Workshop Presentation – Sept 2018