Authorization Request Form
Districts use the Traffic Signals Authorization Request Form
(See Appendix A) to recommend the type of traffic signal control
to install at a particular location, the method of accomplishing
the work, the warrants upon which the authorization was based, and
the funding source. When executed by the district, the form also
serves as:
- authorization for the existence of the signaland
- authorization to do the work under certain programs where work authority has not been previously granted.
Districts are authorized to program projects directly with
the Transportation Planning and Programming Division (TPP). In order
to obtain a valid control-section-job (CSJ) number to establish
a project, the district must submit a signed Traffic Signal Authorization
Form to TPP.
Signature Requirements.
The following
officials’ signatures are required on the Authorization Request
Form:- recommendations by district traffic section
- approval by the district engineer.
Disposition of Paperwork.
TxDOT policy
requires districts to keep all relevant paperwork in their files.
Traffic engineering data need not
be submitted
to TRF.