Traffic Signal Project Process Overview

Before proceeding to construction, a traffic signal project on the state highway system progresses through the following stages:
  1. Someone, either inside or outside TxDOT, requests the signal installation.
  2. The district acknowledges the request.
  3. The district or city conducts a traffic study to determine if the signal is warranted and justified.
  4. The district or city designs the installation.