Budget Categories

The approved project budget should be as detailed as appropriate for fiscal control of the project. Generally, the approved project budget will include the following line items:
Budget Category Line Items
Category
Accounting Code
Line Item
Labor Costs
 
100
Salary and Wages
200
Fringe Benefits
Other Direct Costs
300
Travel and Per Diem
400
Equipment
500
Supplies (postage, printing, office supplies, etc.)
600
Contractual Services
700
Other Miscellaneous Costs (specify)
Indirect or F&A Costs
800
(at specified and approved rate)
The proposed budget must be realistic and reasonable, allowable, and necessary and must include only cost-eligible line items. Potential subgrantees should include as much specific information as possible for all costs included in Salaries (100), Fringe (200), Travel and Per Diem (300), Equipment (400), Supplies (500), Contractual Services (600), Other Miscellaneous (700), and the Indirect Cost Rate (800). Funds that will be used as matching funds by the proposing agency must also be identified.
Potential subgrantees must complete all budget pages in the eGrants Project Proposal that are applicable to the proposed budget. If a budget page is not applicable to a proposed project, then that page should not be completed. For example, if a proposal budget does not include indirect costs, then the Indirect Cost Form Page should not be completed and saved.
See in the eGrants help system for assistance on entering budget items by budget category.