Before Conducting Test Runs

To ensure proper operation of the bank indicator, it is critical that the following steps be taken before conducting test runs
  • Inflate all tires to the uniform pressure used during speedometer calibration.
  • Calibrate the test vehicle’s speedometer (see following procedure)
  • Zero the bank indicator (see following procedure).