Before Conducting Test Runs
To ensure proper operation of the bank indicator, it is critical
that the following steps be taken before conducting test runs
- Inflate all tires to the uniform pressure used during speedometer calibration.
- Calibrate the test vehicle’s speedometer (see following procedure)
- Zero the bank indicator (see following procedure).