Field Review

After determining what signs are needed and approximately where they should be located based on the (TMUTCD), traffic engineers conduct a field review to refine sign locations.
Most of the field work required for plan preparation is to:
  • determine estimated roadside sign post lengths for large guide signs
  • determine overhead sign support spans, tower heights and drill shaft foundations, and
  • determine any site restrictions and document existing or proposed conditions that could affect sign visibility.