Sign Removal or Relocation
If changes in the roadway or changes in highway signing require
that a city pride or TCEQ sign be relocated or removed, the city
must do so at its own expense.
If the district determines that a city pride or TCEQ sign
is damaged, broken, faded, or no longer meets specifications, the
city must remove or replace it within 60 calendar days of written
notification from the district. If the sign is not removed or replaced
within 60 calendar days of such notification, the city is liable
for removal and disposal costs.