Thermoplastic Marking Use Summary

Table 2-8 summarizes the recommended uses of thermoplastic pavement markings.
Table 2-8. Use of Thermoplastic1 Pavement Markings
-
Asphalt
Concrete
Surface treatments
-
AADT <1,000
AADT 1,000 –10,000
AADT >10,000
AADT <10,000
AADT 10,000 –50,000
AADT >50,000
AADT <1,000
AADT 1,000 –10,000
AADT >10,000
Use
2
Y
Y
Y
L
L
N
Y
Y
Y
Material suggestions
TxDOT standard
specific concrete formulation
-
TxDOT standard
Typical minimum thickness (new)
90 mils
90 mils
90 mils
-
100 mils
Typical minimum thickness (restripe)
60 mils
60 mils
60 mils
-
60 mils
Surface prep.
Clean & dry.
Clean, dry, & primer-sealer (refer to Item or manufacturer recommendations).
-
Clean, dry, & remove loose stones.
Expected Service Life
up to 4 years
up to 4 years
up to 3 years
up to 4 years
up to 4 years
-
up to 4 years
up to 4 years
up to 3 years
Approx. bid price for new surface in 2002 (per lf)
$0.20
$0.35
-
$0.20
Estimated cost per year of service life (per lf)
$0.05
$0.05
$0.07
$0.07
$0.09
-
$0.05
$0.05
$0.07
Footnotes:
1. TxDOT Specification Thermoplastic unless noted otherwise.
2. Y = suitable for use; N = not recommended; L = limited use.