Pre-construction Meeting
Most construction contracts involve a pre-construction meeting
at the local TxDOT office. For contracts involving pavement markings,
specific marking items should be discussed at this meeting in an
attempt to eliminate confusion and disputes during the striping
operation. At minimum, these items should include:
- estimated dates when striping will occur
- marking materials that will be used
- minimum marking thicknesses
- estimated striping quantities
- retroreflectivity requirements (if included in contract).