Obtaining Authorization

General
The SLOA, FPAA and Notice to Proceed (or authorization to commence work) are provided to the LG so it may continue with various phases of a project. The forms commit the expenditure of state or federal funds. For federal-aid projects, TxDOT becomes a recipient and the LG becomes a sub-recipient of the federal funding and must follow the rules contained in . This regulation requires TxDOT to verify all sub-recipients register in the System for Award Management (SAM) database, maintain an active SAM registration with current information and provide a DUNS (Data Universal Numbering System) number with ZIP+4 prior to the time of award. A DUNS number identifies an entity by assigning it a unique nine-digit identification number. The ZIP+4 is the zip code plus an additional four digits based on the entity’s physical address. TxDOT and FHWA consider the “time of award” to be the execution of the FPAA. In practice, the TxDOT district must obtain and verify the DUNS number prior to requesting a FPAA. The provides additional information regarding the procedures required by 2 CFR Part 25.
In addition, prior to obtaining any of the described authorizations, an overall period of performance for the project must be established, including a project period start and end date. The sub-recipient must comply with these start and end dates, and must obtain written confirmation from TxDOT for any revisions to either date. Regarding the expiration of a existing project end date, reimbursement for project expenditures incurred subsequent to the end date cease being reimbursable without further consideration by TxDOT and FHWA.
Federal Requirements
  1. – Requires TxDOT to obtain authorization from FHWA before work begins on any federally funded project.
  2. – Prescribes procedures to be followed for preparation, submission and approval of PS&E, and supporting documents for federally funded projects.
  3. – Requires authorization before a federally funded project may be advertised for receipt of bids. PS&E approval is a pre-requisite of authorization for design-bid-build projects. For design-build projects, FHWA’s approval of the Request for Proposals document will constitute FHWA’s project authorization; however, phased authorizations may be given under certain conditions contained in .
  4. – Requires recipients and sub-recipients of federal funds to:
    1. be registered in the SAM database;
    2. maintain an active SAM registration with current information; and
    3. provide a DUNS number to the agency awarding the funding prior to award.
  5. – Requires recipient’s reporting of information on sub-awards of federal funds as required by the Federal Funding Accountability and Transparency Act of 2006 (Public Law 109-282).
  6. – Requires the establishment and reporting of project period start and end dates by recipient prior to federal or state authorization of any reimbursable expenditures.
State Requirements
  1. – Requires projects on the state highway system to be designed in accordance with TxDOT manuals, procedures, standards and guidelines. Additionally requires approval of the PS&E by TxDOT prior to advertisement for receipt of bids for projects on the state highway system.
Required Practices
The describes the procedures and responsibilities associated with requesting and obtaining an SLOA. In general, the LG works with the district to receive authorization to proceed with various phases of the project as detailed in the LGPM Guide.