Program Authorization and Funding

The replanking program is managed under Category 10 (Supplemental Transportation Projects) of the UTP as a bank balance allocation program. Each year, the Texas Transportation Commission authorizes the total amount of funding and the method of project selection. This provides flexibility within each program year to cancel and add projects to the program without commission action. It is funded with 100% state funds, excluding any cost participation from railroad companies. Funding for the program is typically around $3.5 million annually.
Program funds are
not typically used for the following and must be funded out of the district's maintenance budget, except that starting with the 2022 program, replanking program funds can be used for railroad provided traffic control and asphalt work.
Program funds are not typically used for:
  • Traffic control and detours.
  • Notification of
    roadway closures in advance on portable changeable message signs.
  • Engineering labor in developing Exhibit A layouts.
  • Roadway work (level
    adjustments
    to match the crossing surface panels).
  • Any base material or concrete work directly beneath subballast at the crossing.
  • Temporary riprap crossings installed adjacent to the at-grade crossing if the roadway cannot be closed during construction (
    shoofly
    ).
  • Striping and signing.
If the railroad is to perform the asphalt and/or traffic control and be reimbursed by the replanking program, the district should still provide the Traffic Control Plans as part of the Replank Scope of Work.
Use of non-standard crossing surface such as StarTrak may instead be funded under the Section 130 program.