Overview
The Railroad Signal Maintenance Payment Program is managed
under Category 10 (Supplemental Transportation Projects) of the
UTP as a bank balance allocation program to provide a fixed annual unit
payment to railroad companies for maintenance of railroad signals.
Each year, the Texas Transportation Commission authorizes the total
amount of funding for the program.
Only open, public, in service, active at-grade crossings on
the state highway system are eligible for the program, excluding
any industry spur track crossings located on the state highway system
covered by a rail spur permit. It is funded with 100% state funds.
Funding for the program is typically around $1.1 million annually,
and payment is provided per crossing on the following schedule:
- Mast flashers: $289.
- Cantilevers: $385.
- Gates: $770.
Payment for a crossing is made based on the highest level
of protection present at the crossing. For example, if a crossing
includes both gates and cantilevers on both approaches, $770 would
be paid for the entire crossing.
Schedule of payment is subject to change on an annual basis.