Adjacent Crossings
As circuitry along the tracks extends beyond adjacent grade
crossings, the need for preemption at adjacent crossings should
be considered. Preempting adjacent crossings at different times
can be significantly more costly
otherwise. However, this
is determined by the railroad company.