Diagnostic Inspection
After the preliminary design meeting, the district railroad
coordinator should arrange a diagnostic inspection
(if
applicable)
with the railroad company and project team
to visit the project location and discuss:- Train operations, including train speed and counts.
- Safety requirements.
- At-grade crossing safety devices.
- Impact to track, wayside signals,preemption,and equipment, if any.
- Phased construction.
- Other railroad company and TxDOT projects which could impact project.
- Environmental and hydraulic/drainage issues.
- Existing billboards on railroad right of way that may need to be relocated.
- Right of way and utility issues.
- Design issues.
Notes from the diagnostic inspection should clarify all topics
discussed with the project team and list attendees. The district
railroad coordinator compiles the notes.