As Built Drawings
On
Section 130
projects, the district
railroad coordinator will arrange to prepare as built drawings by
modifying any information in the Exhibit A which may have changed
during construction. Changes would include:- Distances from railroad warning devices and railroad cabin from roadway and rail line.
- Side and back light adjustments.
- Signing and striping.
- Other changes from plan design.
As built drawings are not required on replanking projects.
On construction projects, the as built drawings are completed for
the entire construction project.