Exceptions to Requirements for Iron and Steel Preference Provisions in Improvement Contracts
- The provisions do not apply to existing utility materials which are relocated from one location to another within the project limits.
- The provisions do not apply to any materials required for maintenance and temporary installations.
- The provisions do not apply to any materials necessary to repair equipment that was discovered or damaged during construction and requires immediate action to restore to safe conditions or to minimize adverse public impact.