Overview

The TXDOT-Utility Cooperative Management Process (“The Process”) is a system of cooperative planning, design and construction coordination associated with the accommodation of highway-utility joint occupancy. This method will minimize conflicts and construction delays, thereby eliminating or reducing contractor claims
The major procedures used to accomplish the adjustment and accommodation of reimbursable utility facilities on TxDOT projects are listed below. The first three are available as flowcharts in PDF format.
For detailed information about procedures, refer to:
  • State Utility Procedure ( )
  • Federal Utility Procedure ( )
  • Local Utility Procedure ( )
The Overview of Utility Adjustment shows an overview of utility and engineering tasks and may be viewed and/or downloaded in PDF format.