Required Permits
Separate Utility Permits are required for each of the following. The type of permit will be indicated in the permit application Form.
- Broadband Installations on a new Service Structure or Pole
- Broadband Installations on an existing Service Structure or Pole (a Collocation)
- Broadband Installations on a replacement Service Structure or Pole
- Modifications to an existing Broadband Installation with an active or utility permit