Required Permits

Separate Utility Permits are required for each of the following. The type of permit will be indicated in the permit application Form.
  • Broadband Installations on a new Service Structure or Pole
  • Broadband Installations on an existing Service Structure or Pole (a Collocation)
  • Broadband Installations on a replacement Service Structure or Pole
  • Modifications to an existing Broadband Installation with an active or utility permit