ROW Records

The original right of way (ROW) project records must be retained for four years after closing a project. As a general rule, these records will be electronically stored before final retention date. After being electronically stored, and after the retention period, the original records may be destroyed
except
for the following, which are retained in the ROW Division as part of TxDOT's permanent files:
  • ROW conveyances,
  • final ROW maps,
  • title insurance policies, and
  • other instruments pertaining to the State's title to land or interests therein.
The TxDOT
Records Management Manual
contains a list of items which must be retained, and identifies which items must be retained permanently.
The Records Retention Schedule is available on the Department's intranet site as follows: