Procedure
In “last resort housing” situations when replacement housing
is provided by new construction or rehabilitation, passive energy
conservation features may be included in the new dwellings if their use
agrees with prevailing construction standards and climate in the
area. Expensive advanced energy systems and experimental “state-of-the-art”
measures are not eligible.
All attachments to a contractor estimate, to include floor
plan sketches, specification sheets, and appraisal checklists, whether
on his/her own forms or those furnished by
ROW PD, shall be acknowledged by the contractor as the basis of his/her estimate.
Submit a copy of the estimate, including attachments, with form
. The estimate
shall include a contractor statement indicating how long his/her estimate is
valid and the probable construction time required. If a reasonable
fee, not to exceed that normally charged for construction estimates
in the area, is submitted by the contractor, forward it to ROW Program
Office in agreement with Payment of Cost Estimates.
When available replacement housing lacks specific facilities
(e.g., wheelchair ramps, extra wide doorways) needed by a disabled
displacee for ingress, egress, or functional use, add the cost of
providing such facilities to the replacement housing or rent supplement.
Explain the need for added facilities in the remarks section of
form
ROW-R-107 Supplemental Payment Estimate, Replacement Housing
,
and support the costs by a written estimate from a contractor willing
to perform the work. The facilities must be in place before the
property is approved as a DSS dwelling and before a replacement
housing payment is made. Support payment for such facilities by
receipted bills or similar evidence of costs.When payment is required to obtain a cost estimate for construction
or other work referred to in the preceding section Alternatives,
ROW PD may contact several local contractors to determine who would
provide the estimate and how much the estimate would cost. These
estimate preparation fees may be obtained orally or in writing.
Furnish each contractor with specifications and requirements on
which to base his/her fee for preparing an
estimate. ROW PD files must contain the contractor’s name, the date,
and the fee charged for preparing his/her estimate.
ROW PD files shall also contain documentation justifying the contractor
used and verifying that construction charges or services are known
to be reasonable and reliable.