90-10 Right of Way Fencing
Where damage for an unfenced condition is to be a part of the cash consideration paid to the property owner or is to be handled as a property adjustment, such damage will be based on the estimated cost of re-fencing.
If the LPA elects to perform needed right of way fencing on a lump sum or actual cost basis as a part of the right of way consideration, this must be made known when the values are established so the value of the parcel can be determined with fencing provided. There must be coordination between the values and proposed fencing procedure so that adequate compensation is determined in each instance. Recommended and approved values will not include either a value for existing fences whose use will be restored by the new right of way fence or damages for an unfenced condition.