Section 6: Recommendations for Use of Dry Chemicals

Timing is Critical

Timing of an initial dry solid chemical application for snowstorm events is critical. The application should be made as soon as possible after sufficient precipitation has fallen to prevent loss, but before ice bonds to the pavement.

Do Not Use As Pretreatment on Dry Pavement

Application of dry solid chemical onto dry pavement is not recommended, and therefore should not be used as a pretreatment.