General
TxDOT’s Standard Specifications allow the contractor to stockpile
aggregate to be used on the project at locations approved by the
engineer. For the sake of efficiency, most contractors will elect to
do this. There are, however, some steps that must be taken before
stockpiles are placed on the job site.