Area Preparation
If necessary, the Contractor may be required to prepare a
stockpile area before the aggregate is placed on it. He may be required
to level it with a dozer or motor grader, and to clear it of any debris,
such as vegetation, rocks, and sticks. Appropriate storm water pollution
prevention devices should be placed as necessary.