CGP Summary

In summary, it is necessary to:
  • Preserve the existing vegetation when possible
  • Minimize disturbances
  • Re-vegetate quickly (generally should be initiated within 14 days after activities temporarily or permanently cease on portion of the site)
  • Install sediment controls (e.g. silt fence, rock filter dam) at all down-slope boundaries of the site, and side-slope boundaries when appropriate.