Contamination Factors during Construction
When the preventive action for the contaminated materials
cannot reasonably be accomplished by a separate contract prior to
construction, several factors should be analyzed to determine the
best method for incorporating the preventive action into the PS&E.
These factors include:
- Type and severity of contamination
- Area of contamination as related to project size and sequencing
- Time and traffic constraints
- Possible reuse of contaminated soil
- Estimated cost of preventive action.