8.4 Post Letting

8.4.1 Bid Tabulation and Review

Refer to the
PS&E Preparation Manual,
Construction Contract Administration Manual,
and
Letting Manual
for an in-depth discussion of bid tabulation and review.

8.4.2 Contract Award

Refer to the
PS&E Preparation Manual, Construction Contract Administration Manual
, and
Letting Manual
for an in-depth discussion of the contract award process.

8.4.3 Project Financial Clearance Analysis

Refer to TxDOT’s
PS&E Preparation Manual
for information concerning the Notice of Financial Clearance for Bid Opening and Award.
  • Coordination:
  •  District construction staff
  •  DES-FPP staff
  •  CST-CMCL staff
  •  FIN staff
  • Tools to use:
  •  LSM Form