8.2.4 RTL PS&E Submittal to DES-FPP
The District is responsible for performing the RTL PS&E pre-submittal process prior to submission of the project to the DES-FPP staff.
Refer to TxDOT’s 100% PS&E Pre-Submittal Preparation webpage for detailed information on the process which includes:
- Project submittal checklist;
- PS&E Review SOP;
- Electronic plan set guidance;
- Form 1002 – PS&E Transmittal Data;
- Engineer’s estimate;
- Specification list;
- General Notes;
- Engineer’s PE/Registered Landscape Architect Seal;
- Certifications for Utilities, ROW, and Railroads;
- Contract Time Determination Schedule;
- Form 2229 – Significant Project Procedures (TxDOT intranet only);
- Form 2699 – Determination of Additional Project-Specific Liquidated Damages;
- Form 2502 – Value Engineering Study Executive Decision Summary (TxDOT intranet only);
- Design exceptions, waivers, variances and deviations; and
- SWP3 Plan sheet requirements.
The District is responsible for preparing and submitting the completed RTL PS&E package to the DES-FPP section. Refer to the TxDOT.gov 100% PS&E Submittal to DES webpage and the
PS&E Preparation Manual
for detailed information on the process which includes:- Building the contract proposal;
- Supporting documents for 100% PS&E Submittal;
- Submittal instructions;
- Multi-volume plan set submittal guidance; and
- Other useful files and links including:
- DES-FPP final PS&E processing checklist;
- PS&E Review and processing schedule; and
- Letting Schedule Modification (LSM) Workflow Requests.