7.8.3 District Review of Bridge Plans
Once bridge plans and details are prepared, the District is responsible for a final review to determine what changes are made to the initial bridge layout and to verify the quantities. Review any significant changes made to the initial layout with the BRG – Project Development section. The District is also responsible for incorporating the structural details into the Sealed plan set (e.g., updating the index of sheets and numbering the plan sheets).