7.2.4 Traffic and Safety Analysis

Final design phase analysis is a high-detail analysis that is often performed with more data than projects in other stages of development. While study limits for projects in this stage could be broad or narrow, they are well defined.
Refer to the TSAP Manual for details on the data and tasks to complete for traffic and safety analysis procedures to complete during this phase.
  • Coordination:
  •  District planning, design, pavement, construction, bridge, traffic, ROW, utility, laboratory and environmental staff
  •  Area office staff
  •  Maintenance staff
  •  Division staff (as appropriate)
  •  Local government staff (if applicable)
  • Available training:
  •  DES110 – Right-of-Way Considerations
  •  ROW101 – Utility Coordination
  •  TPD327 – TxDOTCONNECT Utility Functionality